PI No: 0006436
Regional Project Id: RC07-000086
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Roadway Project
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $16,987,900
Invoiced to Date: $18,524,781.44
Project Description: Thomson West Bypass Construction-From 3 Points Road to East of SR 17
PI No: 0008016
Regional Project Id: RC07-000174
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Roadway Project
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,585,960
Invoiced to Date: $16,702,759.88
Project Description: SR 15 Sparta Bypass
PI No: 0008301
Regional Project Id: RC07-000156
County: Taliaferro
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $1,868,002
Invoiced to Date: $469,632.26
Project Description: Bridge Upgrade on Bethany Church Road over N Fork Ogeechee River
PI No: 0008346
Regional Project Id: RC07-000024
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $50,210,984
Invoiced to Date: $33,698,765.45
Project Description: SR 28 from South Carolina Line to CR 1236/Evans to Locks Road Widening
PI No: 0008347
Regional Project Id: RC07-000032
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $3,000,000
Invoiced to Date: $2,685,495.73
Project Description: Wrightsboro Road Improvements from SR 388/Lewiston Road to SR 223/Robinson Avenue
PI No: 0008350
Regional Project Id: RC07-000025
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $25,505,908
Invoiced to Date: $19,910,239.30
Project Description: SR 388 Widening from I-20 to SR 232/Columbia Road
PI No: 0008351
Regional Project Id: RC07-000031
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $26,198,019
Invoiced to Date: $9,199,949.59
Project Description: Widen SR 388 from CR 571/Wrightsboro Road to I-20
PI No: 0008519
Regional Project Id: RC07-000061
County: Jenkins
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Turn Lanes
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $2,072,197
Invoiced to Date: $2,275,248.87
Project Description: Widen SR 67 and Add Turn Lanes
PI No: 0008680
Regional Project Id: RC07-000160
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Frontage Roads
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $7,000,000
Invoiced to Date: $1,706,641.62
Project Description: I-20 Frontage Road Phase 2
PI No: 0010844
Regional Project Id: RC07-000159
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Frontage Roads
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $7,000,000
Invoiced to Date: $2,702,774.51
Project Description: I-20 Frontage Road Phase 1
PI No: 0011371
Regional Project Id: RC07-000007
County: Burke
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $500,000
Invoiced to Date: $546,018.56
Project Description: Sardis Truck Improvements at Intersections
PI No: 0011372
Regional Project Id: RC07-000009
County: Burke
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Roadway Project
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $4,471,195
Invoiced to Date: $8,683,620.23
Project Description: Westside Truck Route - Waynesboro
PI No: 0011373
Regional Project Id: RC07-000016
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,040,000
Invoiced to Date: $7,689,259.21
Project Description: I-20/US 221/SR 47 Bridge Replacement and Intersection Improvement
PI No: 0011374
Regional Project Id: RC07-000038
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Bike-Ped Facility
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $792,000
Invoiced to Date: $991,528.79
Project Description: Gettis Street Improvement Project
PI No: 0011375
Regional Project Id: RC07-000039
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Bike-Ped Facility
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $154,688
Invoiced to Date: $154,628.86
Project Description: Hwy 22 West Improvement Project
PI No: 0011376
Regional Project Id: RC07-000044
County: Jefferson
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $4,341,344
Invoiced to Date: $2,852,759.62
Project Description: Convert Hoyt Braswell Road to Truck Route
PI No: 0011377
Regional Project Id: RC07-000063
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Passing Lanes
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $5,500,000
Invoiced to Date: $6,094,595.05
Project Description: Add Passing Lane on SR 43 (NB and SB) between lake and SR220
PI No: 0011378
Regional Project Id: RC07-000070
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $2,500,000
Invoiced to Date: $2,324,419.19
Project Description: SR 17 North of SR 223-Drainage Improvements
PI No: 0011379
Regional Project Id: RC07-000096
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Transit
Band: Multi- (TIA 1)
Original Project Budgeted: $7,550,000
Invoiced to Date: $7,520,501.49
Project Description: Augusta Public Transit Operations and Maintenance
PI No: 0011380
Regional Project Id: RC07-000105
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $415,000
Invoiced to Date: $160,615.49
Project Description: Bath Edie Road and Highway 88 Intersection
PI No: 0011381
Regional Project Id: RC07-000106
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $3,707,973
Invoiced to Date: $3,693,361.00
Project Description: Berckmans Road over Raes Creek (Bridge Replacement)
PI No: 0011382
Regional Project Id: RC07-000107
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $25,000,000
Invoiced to Date: $3,619,731.18
Project Description: Broad Street Improvements (Washington Road to Sand Bar Ferry Road)
PI No: 0011383
Regional Project Id: RC07-000108
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $713,562
Invoiced to Date: $711,348.24
Project Description: Broad Street over Hawks Gully (Bridge Repair and Restoration)
PI No: 0011384
Regional Project Id: RC07-000111
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,320,929
Invoiced to Date: $1,219,412.16
Project Description: Broad Street over the Augusta Canal (Bridge Repair & Restoration)
PI No: 0011385
Regional Project Id: RC07-000112
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $415,000
Invoiced to Date: $210,745.00
Project Description: Brothersville Road and Highway 88 Intersection
PI No: 0011386
Regional Project Id: RC07-000113
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $8,505,470
Invoiced to Date: $8,340,739.37
Project Description: Calhoun Expressway Repair and Reconstruction
PI No: 0011387
Regional Project Id: RC07-000114
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Airport
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,000,000
Invoiced to Date: $996,302.96
Project Description: Daniel Field Airport-App. #1: New Hangar Doors for both Bulk Hangar and '05 Hangars
PI No: 0011388
Regional Project Id: RC07-000116
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,065,000
Invoiced to Date: $1,064,402.73
Project Description: Gordon Highway and Deans Bridge Road Intersection
PI No: 0011389
Regional Project Id: RC07-000117
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $9,880,736
Invoiced to Date: $11,019,016.12
Project Description: Greene Street Improvements from 13th Street to East Boundary Street
PI No: 0011390
Regional Project Id: RC07-000118
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $1,598,109
Invoiced to Date: $594,561.95
Project Description: Highland Avenue Bridge Repair and Restoration Over CSX Railroad
PI No: 0011391
Regional Project Id: RC07-000119
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $271,557
Invoiced to Date: $270,486.00
Project Description: Highland Avenue Resurfacing from Wrightsboro Road to Wheeler Road
PI No: 0011392
Regional Project Id: RC07-000121
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Signals
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $4,550,000
Invoiced to Date: $4,533,243.86
Project Description: Intelligent Transportation System Master Plan Implementation-Richmond County
PI No: 0011393
Regional Project Id: RC07-000123
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $323,993
Invoiced to Date: $322,834.98
Project Description: Jackson Road Resurfacing from Walton Way to Wrightsboro Road
PI No: 0011394
Regional Project Id: RC07-000126
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Turn Lanes
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $7,849,390
Invoiced to Date: $7,818,646.88
Project Description: Marks Church Road Widening From Wrightsboro Road to Wheeler Road
PI No: 0011395
Regional Project Id: RC07-000127
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $83,842
Invoiced to Date: $83,699.36
Project Description: Milledgeville Road Bridge Maintenance at Rocky Creek
PI No: 0011396
Regional Project Id: RC07-000129
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $3,832,757
Invoiced to Date: $3,818,578.92
Project Description: North Leg Road Improvements (Sibley Road to Wrightsboro Road)
PI No: 0011397
Regional Project Id: RC07-000130
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $3,138,288
Invoiced to Date: $3,079,059.21
Project Description: Old Waynesboro Road over Spirit Creek (Bridge Replacement)
PI No: 0011398
Regional Project Id: RC07-000134
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $291,288
Invoiced to Date: $290,140.12
Project Description: Pleasant Home Road (Riverwatch Parkway to Walton Way Extension)
PI No: 0011399
Regional Project Id: RC07-000135
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Airport
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $8,400,400
Invoiced to Date: $8,362,416.27
Project Description: Rehabilitate Air Carrier and General Aviation Aprons
PI No: 0011400
Regional Project Id: RC07-000137
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Transit
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,500,000
Invoiced to Date: $1,455,760.34
Project Description: Richmond County Emergency and Transit Vehicle Preemption System
PI No: 0011401
Regional Project Id: RC07-000138
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $10,096,798
Invoiced to Date: $4,380,978.61
Project Description: Riverwatch Parkway (15th Street to County Line)
PI No: 0011402
Regional Project Id: RC07-000139
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Signals
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $682,087
Invoiced to Date: $624,749.83
Project Description: Riverwatch Parkway Adaptive Signal Project
PI No: 0011403
Regional Project Id: RC07-000140
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $515,966
Invoiced to Date: $640,006.36
Project Description: Riverwatch Parkway and Fury’s Ferry Road Intersections
PI No: 0011404
Regional Project Id: RC07-000141
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $430,739
Invoiced to Date: $356,759.97
Project Description: Riverwatch Parkway and Stevens Creek Road Intersections
PI No: 0011406
Regional Project Id: RC07-000144
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Signals
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $5,252,616
Invoiced to Date: $4,604,560.64
Project Description: Signal Modernization Walton Way Phase III (Bransford Road to Milledge Road)
PI No: 0011407
Regional Project Id: RC07-000145
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Signals
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $2,325,000
Invoiced to Date: $2,268,254.89
Project Description: Signal Modernization Walton Way Phase III (Druid Park to Heard Avenue)
PI No: 0011408
Regional Project Id: RC07-000146
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bike-Ped Facility
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $5,042,695
Invoiced to Date: $4,956,861.00
Project Description: SR 4 / 15th Street Pedestrian Improvements – Calhoun Expwy. to Central Avenue
PI No: 0011409
Regional Project Id: RC07-000148
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $19,233,219
Invoiced to Date: $4,504,708.12
Project Description: Telfair Street Improvements (15th Street to East Boundary Street)
PI No: 0011410
Regional Project Id: RC07-000151
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $368,542
Invoiced to Date: $364,481.69
Project Description: Walton Way Ext. Resurfacing (Robert C. Daniel to Walton Way)
PI No: 0011411
Regional Project Id: RC07-000175
County: Washington
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $2,800,000
Invoiced to Date: $1,804,601.32
Project Description: Resurface Deepstep Road (C.R. 348)
PI No: 0011413
Regional Project Id: RC07-001211
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Realignment
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $16,700,000
Invoiced to Date: $16,608,319.90
Project Description: Berckmans Road Realignment and Widening (Wheeler Road to Washington Road)
PI No: 0011414
Regional Project Id: RC07-001212
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bike-Ped Facility
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $8,000,000
Invoiced to Date: $7,728,703.02
Project Description: Improvements to Robinson Avenue/SR 223 from SR 388 to SR 10/Richmond County
PI No: 0011415
Regional Project Id: RC07-001213
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $5,118,150
Invoiced to Date: $3,711,747.47
Project Description: 5th Street - Laney Walker Boulevard to Reynolds Street
PI No: 0011416
Regional Project Id: RC07-001214
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $548,856
Invoiced to Date: $738,344.77
Project Description: Walton Way over Hawks Gully (Bridge Repair and Restoration)
PI No: 0011417
Regional Project Id: RC07-001216
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,358,566
Invoiced to Date: $1,122,404.21
Project Description: Scott`s Way over Rae`s Creek (Bridge Replacement)
PI No: 0011418
Regional Project Id: RC07-001217
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $9,149,610
Invoiced to Date: $9,067,807.70
Project Description: 5th Street Bridge (Bridge Repair and Restoration)
PI No: 0011419
Regional Project Id: RC07-001218
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $6,193,980
Invoiced to Date: $4,969,319.78
Project Description: James Brown Reconstruction
PI No: 0011420
Regional Project Id: RC07-001219
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $3,512,456
Invoiced to Date: $3,498,687.5
Project Description: Druid Park Improvements (Walton Way to Wrightsboro Road)
PI No: 0011421
Regional Project Id: RC07-001220
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $6,843,938
Invoiced to Date: $4,560,672.03
Project Description: 6th Street (Laney Walker Boulevard to Reynolds Street)
PI No: 0011422
Regional Project Id: RC07-001221
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,491,057
Invoiced to Date: $1,482,048.45
Project Description: 15th Street over Augusta Canal (Bridge Repair and Restoration)
PI No: 0011423
Regional Project Id: RC07-001222
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $748,856
Invoiced to Date: $746,154.78
Project Description: 7th Street Bridge over Augusta Canal (Bridge Replacement)
PI No: 0011424
Regional Project Id: RC07-001223
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $3,060,855
Invoiced to Date: $7,281,110.59
Project Description: 13th Street (RA Dent to Reynolds Street)
PI No: 0011425
Regional Project Id: RC07-001224
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $579,642
Invoiced to Date: $577,969.08
Project Description: 11th Street over the Augusta Canal (Bridge Repair and Restoration)
PI No: 0011426
Regional Project Id: RC07-001225
County: Jefferson
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $500,000
Invoiced to Date: $497,353.42
Project Description: Walker Street (Sidewalks, Curb&Gutter, Resurface) from SR 4/US Hwy 1 to Young St
PI No: 0011427
Regional Project Id: RC07-001226
County: Glascock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $500,000
Invoiced to Date: $640,237.23
Project Description: Glascock County School Access Road
PI No: 0011660
Regional Project Id: RC07-001215
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Barriers
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $14,000,000
Invoiced to Date: $8,053,557.55
Project Description: Gordon Hwy/U.S. 78 Median Barrier between U.S. 25 and Walton Way
PI No: 0011699
Regional Project Id: RC07-000142
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Interchange
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $2,518,810
Invoiced to Date: $2,646,508.73
Project Description: Riverwatch Pkwy. Corridor Improvements from I-20 to River Shoals
PI No: 0012574
Regional Project Id: RC07-000005
County: Burke
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $7,300,000
Invoiced to Date: $6,082,774.88
Project Description: Highway 56 Widening - Phase I
PI No: 0012575
Regional Project Id: RC07-000002
County: Burke
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $13,600,000
Invoiced to Date: $7,353,746.28
Project Description: Highway 56 Widening Project - Phase II
PI No: 0012576
Regional Project Id: RC07-000003
County: Burke
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $3,873,000
Invoiced to Date: $2,866,689.41
Project Description: Highway 56 Widening Project - Phase III
PI No: 220680-
Regional Project Id: RC07-000147
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $21,415,267
Invoiced to Date: $17,055,972.38
Project Description: SR 4 /15th Street Widening – Milledgeville Road to Government Road
PI No: 222150-
Regional Project Id: RC07-000046
County: Jefferson
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $20,000,000
Invoiced to Date: $2,887,669.08
Project Description: Louisville Bypass Widening
PI No: 222250-
Regional Project Id: RC07-000079
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $29,555,858
Invoiced to Date: $3,977,602.68
Project Description: SR 17 Widening from SR 43 to Smith Mill Road
PI No: 222255-
Regional Project Id: RC07-000181
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $43,284,740
Invoiced to Date: $5,743,655.20
Project Description: SR 17 Widening from Smith Mill Road to the Washington Bypass
PI No: 222460-
Regional Project Id: RC07-000178
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Passing Lanes
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $7,740,119
Invoiced to Date: $87,113.24
Project Description: Passing Lanes on SR 10
PI No: 231360-
Regional Project Id: RC07-000066
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Passing Lanes
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $4,175,166
Invoiced to Date: $1,000,000.00
Project Description: SR 47 Passing Lanes for 2.48 Miles
PI No: 232020-
Regional Project Id: RC07-000120
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Median Work
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $8,600,000
Invoiced to Date: $7,655,023.13
Project Description: Improvements to SR 104 / Riverwatch Parkway Median Barrier – Jones Street to I-20
PI No: 245090-
Regional Project Id: RC07-000168
County: Washington
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $37,773,566
Invoiced to Date: $19,404,826.87
Project Description: SR 15 on new location between Hwy 242 and SR15 east of Sandersville/Tennille
PI No: 245320-
Regional Project Id: RC07-000154
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $17,771,044
Invoiced to Date: $1,232,092.31
Project Description: Windsor Spring Road, Phase V (Road and Bridge Widening)
PI No: 250470-
Regional Project Id: RC07-000017
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $30,729,167
Invoiced to Date: $19,746,875.75
Project Description: Old Petersburg Road/Old Evans Road from Baston Road to Washington Road Improvements
PI No: 250510-
Regional Project Id: RC07-000155
County: Richmond
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $21,565,887
Invoiced to Date: $2,000,000.00
Project Description: Wrightsboro Road/CR 1501 Widening - Jimmie Dyess Pkwy. to I-520
PI No: 250600-
Regional Project Id: RC07-000019
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $20,000,000
Invoiced to Date: $19,256,438.20
Project Description: Flowing Wells Road from I-20 to SR 104/Washington Road Improvements
PI No: 250610-
Regional Project Id: RC07-000153
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $25,315,164
Invoiced to Date: $356,827.60
Project Description: Windsor Spring Road, Phase IV from Tobacco Road to Willis Foreman Road
PI No: M004969
Regional Project Id: RC07-000179
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $606,906
Invoiced to Date: $575,397.00
Project Description: Robert Toombs Avenue Resurfacing
PI No: 0000833
Regional Project Id: RC09-000041
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $15,294,495
Invoiced to Date: $6,432,020.65
Project Description: Oconee River Bridge Project
PI No: 0001216
Regional Project Id: RC09-000003
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $24,848,903
Invoiced to Date: $4,274,744.43
Project Description: Bridge Replacement of SR 4/US 1 over Altamaha River and Overflow, and Williams Creek
PI No: 0007037
Regional Project Id: RC09-000030
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $6,963,332
Invoiced to Date: $1,138,141.60
Project Description: Bridge Replacement at SR 135 over Altamaha River
PI No: 0007413
Regional Project Id: RC09-000039
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $24,013,975
Invoiced to Date: $17,641,533.20
Project Description: Hillcrest Parkway from CR493/Industrial Blvd. to SR31/US 441
PI No: 0008289
Regional Project Id: RC09-000062
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Passing Lanes
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $10,900,000
Invoiced to Date: $9,932,704.97
Project Description: SR 23, 57 Passing Lanes Glennville to Reidsville
PI No: 0011442
Regional Project Id: RC09-000015
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $6,429,877
Invoiced to Date: $3,616,353.49
Project Description: CR 454/CR 225/Cartee Lee Rd/Salem Ch Rd/Lake Ch Rd - Swainsboro to Metter
PI No: 0011443
Regional Project Id: RC09-000027
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $1,745,000
Invoiced to Date: $1,583,297.96
Project Description: Replace Bridge over Canoochee River on Daisy Nevils Highway
PI No: 0011578
Regional Project Id: HG-0005
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $2,889,000
Invoiced to Date: $2,834,281.00
Project Description: Appling Zoar Road
PI No: 0011579
Regional Project Id: HG-0006
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $1,483,800
Invoiced to Date: $1,470,534.00
Project Description: Appling Red Oak Church Road
PI No: 0011580
Regional Project Id: HG-0007
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $900,000
Invoiced to Date: $891,454.00
Project Description: Appling Altamaha School Road
PI No: 0011581
Regional Project Id: HG-0009
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $8,400
Invoiced to Date: $9,080.14
Project Description: Baxley Barnes Street Seg 1
PI No: 0011582
Regional Project Id: HG-0010
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $9,800
Invoiced to Date: $9,093.53
Project Description: Baxley Lee Street Seg 1
PI No: 0011583
Regional Project Id: HG-0011
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $21,000
Invoiced to Date: $17,518.58
Project Description: Baxley Miles Street
PI No: 0011584
Regional Project Id: HG-0012
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $8,466
Invoiced to Date: $10,986.00
Project Description: Baxley Thomas Street Seg 1
PI No: 0011585
Regional Project Id: HG-0013
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $9,800
Invoiced to Date: $15,680.82
Project Description: Baxley Weaver Street East
PI No: 0011586
Regional Project Id: HG-0014
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $116,000
Invoiced to Date: $75,576.46
Project Description: Baxley NE Park Avenue
PI No: 0011587
Regional Project Id: HG-0015
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $32,200
Invoiced to Date: $12,965.34
Project Description: Baxley NFL Drive
PI No: 0011588
Regional Project Id: HG-0016
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $19,600
Invoiced to Date: $13,397.86
Project Description: Baxley Third Street
PI No: 0011589
Regional Project Id: HG-0017
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $61,600
Invoiced to Date: $24,124.86
Project Description: Baxley Pine Street Extension
PI No: 0011590
Regional Project Id: HG-0018
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $143,072
Invoiced to Date: $55,224.24
Project Description: Baxley East Allen Street
PI No: 0011591
Regional Project Id: HG-0019
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $11,200
Invoiced to Date: $10,311.77
Project Description: Baxley Heritage Drive
PI No: 0011592
Regional Project Id: HG-0020
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $11,200
Invoiced to Date: $7,802.35
Project Description: Baxley Ivey Street East
PI No: 0011593
Regional Project Id: HG-0021
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $16,800
Invoiced to Date: $244.00
Project Description: Baxley Page Street
PI No: 0011594
Regional Project Id: HG-0022
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $13,066
Invoiced to Date: $12,328.77
Project Description: Baxley Crosby Street Seg 1
PI No: 0011595
Regional Project Id: HG-0023
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $81,895
Invoiced to Date: $46,339.17
Project Description: Baxley SE Park Avenue
PI No: 0011596
Regional Project Id: HG-0024
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $119,248
Invoiced to Date: $56,794.67
Project Description: Baxley Anthony Street
PI No: 0011597
Regional Project Id: HG-0025
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $10,140.03
Project Description: Baxley Copeland Avenue
PI No: 0011598
Regional Project Id: HG-0026
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $201,766
Invoiced to Date: $92,413.26
Project Description: Baxley MLK Avenue Seg 1
PI No: 0011599
Regional Project Id: HG-0027
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $24,187.51
Project Description: Baxley Harley Street
PI No: 0011600
Regional Project Id: HG-0028
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $13,968.00
Project Description: Baxley Foundry Street
PI No: 0011601
Regional Project Id: HG-0029
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $10,343.91
Project Description: Baxley Kenny Lane
PI No: 0011602
Regional Project Id: HG-0030
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $36,397
Invoiced to Date: $21,099.81
Project Description: Baxley MLK Avenue Seg 2
PI No: 0011603
Regional Project Id: HG-0031
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $18,200
Invoiced to Date: $12,606.93
Project Description: Baxley Johnson Street
PI No: 0011604
Regional Project Id: HG-0032
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $12,600
Invoiced to Date: $7,477.21
Project Description: Baxley Lackawanna Street Seg 1
PI No: 0011605
Regional Project Id: HG-0033
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $77,000
Invoiced to Date: $44,627.65
Project Description: Baxley Pine Street
PI No: 0011606
Regional Project Id: HG-0034
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $19,248
Invoiced to Date: $18,884.07
Project Description: Baxley SW Park Avenue
PI No: 0011607
Regional Project Id: HG-0035
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $9,800
Invoiced to Date: $6,525.07
Project Description: Baxley North Lee Street Extension
PI No: 0011608
Regional Project Id: HG-0036
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $9,217.44
Project Description: Baxley Spruce Street
PI No: 0011609
Regional Project Id: HG-0037
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $133,218
Invoiced to Date: $132,027.00
Project Description: Baxley Fair Street
PI No: 0011610
Regional Project Id: HG-0038
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $138,100
Invoiced to Date: $87,467.35
Project Description: Baxley Holmesville Avenue
PI No: 0011611
Regional Project Id: HG-0039
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $36,398
Invoiced to Date: $26,463.00
Project Description: Baxley Crowder Street
PI No: 0011612
Regional Project Id: HG-0040
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $19,587.00
Project Description: Baxley Dogwood Lane
PI No: 0011613
Regional Project Id: HG-0041
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $36,400
Invoiced to Date: $14,829.00
Project Description: Baxley Lucerne Street
PI No: 0011614
Regional Project Id: HG-0042
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $49,000
Invoiced to Date: $40,268.00
Project Description: Baxley Magnolia Lane
PI No: 0011615
Regional Project Id: HG-0043
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $23,975.00
Project Description: Baxley Oak Street Seg 1
PI No: 0011616
Regional Project Id: HG-0044
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $57,400
Invoiced to Date: $66,077.50
Project Description: Baxley Penniman Street
PI No: 0011617
Regional Project Id: HG-0045
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $54,600
Invoiced to Date: $43,429.50
Project Description: Baxley Second Street
PI No: 0011618
Regional Project Id: HG-0046
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $51,800
Invoiced to Date: $46,399.00
Project Description: Baxley Hopps Street
PI No: 0011619
Regional Project Id: HG-0047
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $10,424
Invoiced to Date: $12,297.00
Project Description: Baxley Barnes Street Seg 2
PI No: 0011620
Regional Project Id: HG-0048
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $13,650
Invoiced to Date: $12,398.75
Project Description: Baxley West Allen Street
PI No: 0011621
Regional Project Id: HG-0049
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $8,632
Invoiced to Date: $11,689.00
Project Description: Baxley Washington Street
PI No: 0011622
Regional Project Id: HG-0050
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $21,000
Invoiced to Date: $21,149.50
Project Description: Baxley Dean Street
PI No: 0011623
Regional Project Id: HG-0051
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $25,200
Invoiced to Date: $10,760.00
Project Description: Baxley Douglas Drive
PI No: 0011624
Regional Project Id: HG-0052
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $49,000
Invoiced to Date: $34,082.00
Project Description: Baxley First Street
PI No: 0011625
Regional Project Id: HG-0053
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $19,600
Invoiced to Date: $17,652.50
Project Description: Baxley South Harvey Street
PI No: 0011626
Regional Project Id: HG-0054
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $7,826.00
Project Description: Baxley Jerome Street
PI No: 0011627
Regional Project Id: HG-0055
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $37,800
Invoiced to Date: $31,165.00
Project Description: Baxley Jr High Drive
PI No: 0011628
Regional Project Id: HG-0134
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $36,400
Invoiced to Date: $31,349.23
Project Description: Surrency Cemetery Street
PI No: 0011629
Regional Project Id: HG-0132
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $36,400
Invoiced to Date: $19,249.86
Project Description: Surrency Andrews Street
PI No: 0011630
Regional Project Id: HG-0129
County: Appling
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $33,600
Invoiced to Date: $31,489.50
Project Description: Surrency Norwood Street
PI No: 0011631
Regional Project Id: HG-0135
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $139,000
Invoiced to Date: $137,757.00
Project Description: Bleckley Jones Road Bridge
PI No: 0011632
Regional Project Id: HG-0137
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $140,170
Invoiced to Date: $55,122.51
Project Description: Bleckley Jac Arts Road Resurfacing
PI No: 0011633
Regional Project Id: HG-0138
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $235,800
Invoiced to Date: $233,692.00
Project Description: Bleckley Roy Bryant Road Paving
PI No: 0011634
Regional Project Id: HG-0139
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $113,385
Invoiced to Date: $112,532.73
Project Description: Bleckley Pineland Estates Road Paving
PI No: 0011635
Regional Project Id: HG-0140
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $52,781.70
Project Description: Bleckley Browning Drive Resurfacing
PI No: 0011636
Regional Project Id: HG-0141
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $252,000
Invoiced to Date: $210,830.43
Project Description: Bleckley Bates Road Resurfacing
PI No: 0011637
Regional Project Id: HG-0142
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $154,000
Invoiced to Date: $166,507.64
Project Description: Bleckley Crest Drive Resurfacing
PI No: 0011840
Regional Project Id: RC09-000089
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $13,978,470
Invoiced to Date: $13,593,948.39
Project Description: SR 169 Railroad Overpass
PI No: 0011841
Regional Project Id: RC09-000090
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $2,978,086
Invoiced to Date: $2,665,109.76
Project Description: SR 169 Widening from Sunset Blvd. to NS Railroad Overpass in Jesup
PI No: 0011854
Regional Project Id: HG-0143
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $266,000
Invoiced to Date: $198,411.30
Project Description: Bleckley Trail Branch Road Resurfacing
PI No: 0011855
Regional Project Id: HG-0144
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $619,200
Invoiced to Date: $613,664.00
Project Description: Bleckley Limestone Road Resurfacing
PI No: 0011856
Regional Project Id: HG-0145
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $560,000
Invoiced to Date: $452,745.67
Project Description: Bleckley Cary Salem Road Resurfacing
PI No: 0011857
Regional Project Id: HG-0146
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $491,400
Invoiced to Date: $439,028.68
Project Description: Bleckley Talmadge Coley and Irve Land Roads Resurfacing
PI No: 0011858
Regional Project Id: HG-0147
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $280,000
Invoiced to Date: $351,072.00
Project Description: Bleckley Magnolia Road Resurfacing (Begin at Centennery Rd and go 2.0 miles North)
PI No: 0011859
Regional Project Id: HG-0148
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $36,273
Invoiced to Date: $35,949.00
Project Description: Cochran Railroad Avenue
PI No: 0011860
Regional Project Id: HG-0149
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $127,591
Invoiced to Date: $113,104.00
Project Description: Cochran Lewis Street
PI No: 0011861
Regional Project Id: HG-0150
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $130,322
Invoiced to Date: $141,558.07
Project Description: Cochran Beech Street
PI No: 0011862
Regional Project Id: HG-0151
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $35,663
Invoiced to Date: $32,441.53
Project Description: Cochran Maple Street
PI No: 0011863
Regional Project Id: HG-0152
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $78,803
Invoiced to Date: $64,634.30
Project Description: Cochran Martin Luther King Blvd
PI No: 0011864
Regional Project Id: HG-0153
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $45,076
Invoiced to Date: $37,961.31
Project Description: Cochran Seventh Street
PI No: 0011865
Regional Project Id: HG-0154
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $149,837
Invoiced to Date: $146,259.68
Project Description: Cochran Ash Street
PI No: 0011866
Regional Project Id: HG-0155
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $66,129
Invoiced to Date: $64,886.00
Project Description: Cochran Palm Street
PI No: 0011867
Regional Project Id: HG-0156
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $74,826
Invoiced to Date: $51,177.75
Project Description: Cochran Crest Drive
PI No: 0011868
Regional Project Id: HG-0158
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $266,000
Invoiced to Date: $210,241.27
Project Description: Candler East Pulaski Highway
PI No: 0011869
Regional Project Id: HG-0167
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $761,250
Invoiced to Date: $1,016,698.00
Project Description: Candler St Matthews Church Road
PI No: 0011870
Regional Project Id: HG-0166
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $688,017
Invoiced to Date: $688,017.00
Project Description: Candler Oak Tree Road
PI No: 0011871
Regional Project Id: HG-0159
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $532,000
Invoiced to Date: $634,997.22
Project Description: Candler Eden Church Road
PI No: 0011872
Regional Project Id: HG-0168
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $152,250
Invoiced to Date: $150,889.25
Project Description: Candler High Bluff Road
PI No: 0011873
Regional Project Id: HG-0169
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $203,000
Invoiced to Date: $201,185.00
Project Description: Candler Windmill Road
PI No: 0011874
Regional Project Id: HG-0170
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $180,606
Invoiced to Date: $153,551.69
Project Description: Metter Central Avenue
PI No: 0011875
Regional Project Id: HG-0171
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $17,479
Invoiced to Date: $17,148.00
Project Description: Metter North Williams Street
PI No: 0011876
Regional Project Id: HG-0172
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $21,540
Invoiced to Date: $21,348.00
Project Description: Metter Matthew Street
PI No: 0011877
Regional Project Id: HG-0174
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $200,928
Invoiced to Date: $197,123.00
Project Description: Metter Martin Luther King Jr Blvd
PI No: 0011878
Regional Project Id: HG-0173
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $48,086
Invoiced to Date: $47,656.00
Project Description: Metter West Vertia Street
PI No: 0011879
Regional Project Id: HG-0175
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $61,748
Invoiced to Date: $61,196.00
Project Description: Metter Green Street
PI No: 0011880
Regional Project Id: HG-0176
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $32,044
Invoiced to Date: $31,757.00
Project Description: Metter Burton Avenue
PI No: 0011881
Regional Project Id: HG-0177
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $117,977
Invoiced to Date: $116,922.00
Project Description: Metter South Kennedy Street
PI No: 0011882
Regional Project Id: HG-0178
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $99,031
Invoiced to Date: $98,146.00
Project Description: Metter Ellis Street
PI No: 0011883
Regional Project Id: HG-0179
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $33,487
Invoiced to Date: $33,188.00
Project Description: Metter Hulett Street
PI No: 0011884
Regional Project Id: HG-0180
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $45,095
Invoiced to Date: $44,692.00
Project Description: Metter Smith Street
PI No: 0011885
Regional Project Id: HG-0181
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $43,679
Invoiced to Date: $43,289.00
Project Description: Metter Boston Street
PI No: 0011886
Regional Project Id: HG-0182
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $46,647
Invoiced to Date: $46,230.00
Project Description: Metter Mincey Street
PI No: 0011887
Regional Project Id: HG-0183
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $117,977
Invoiced to Date: $116,922.00
Project Description: Metter South Rountree Street
PI No: 0011888
Regional Project Id: HG-0184
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $58,239
Invoiced to Date: $57,718.00
Project Description: Metter South Williams Street
PI No: 0011889
Regional Project Id: HG-0185
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $59,717
Invoiced to Date: $79,051.00
Project Description: Metter Neal Street
PI No: 0011890
Regional Project Id: HG-0186
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $196,431
Invoiced to Date: $264,000.00
Project Description: Metter South Lewis Street
PI No: 0011891
Regional Project Id: HG-0187
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $181,997
Invoiced to Date: $234,527.00
Project Description: Metter East Lillian Street
PI No: 0011892
Regional Project Id: HG-0188
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $29,120
Invoiced to Date: $38,463.02
Project Description: Metter Haymans Street
PI No: 0011893
Regional Project Id: HG-0189
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $321,583
Invoiced to Date: $1,021,692.46
Project Description: Metter East Hiawatha Street
PI No: 0011894
Regional Project Id: HG-0191
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $11,946.74
Project Description: Pulaski Pulaski School Road
PI No: 0011895
Regional Project Id: HG-0192
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $14,351.86
Project Description: Pulaski West Railroad Street Seg 1
PI No: 0011896
Regional Project Id: HG-0194
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $19,429.21
Project Description: Pulaski Brannen Street
PI No: 0011897
Regional Project Id: HG-0195
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $32,651.71
Project Description: Pulaski East Railroad Street
PI No: 0011898
Regional Project Id: HG-0196
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $15,289.19
Project Description: Pulaski Back Street Seg 1
PI No: 0011899
Regional Project Id: HG-0198
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $19,544.94
Project Description: Pulaski Back Street Seg 2
PI No: 0011900
Regional Project Id: HG-0197
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $13,705.45
Project Description: Pulaski Lee Street
PI No: 0011901
Regional Project Id: HG-0206
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,178,400
Invoiced to Date: $980,064.35
Project Description: Dodge Chester Highway
PI No: 0011902
Regional Project Id: HG-0210
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $333,600
Invoiced to Date: $280,244.73
Project Description: Dodge Bell Line Road
PI No: 0011903
Regional Project Id: HG-0211
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $217,600
Invoiced to Date: $204,561.95
Project Description: Dodge East Chicken Road
PI No: 0011904
Regional Project Id: HG-0213
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $425,600
Invoiced to Date: $375,102.80
Project Description: Dodge Milan Chauncey Road
PI No: 0011905
Regional Project Id: HG-0216
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $710,400
Invoiced to Date: $575,706.27
Project Description: Dodge Rocky Springs Road
PI No: 0011906
Regional Project Id: HG-0212
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $620,000
Invoiced to Date: $508,692.67
Project Description: Dodge Middle Ground Church Road
PI No: 0011907
Regional Project Id: HG-0215
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $199,200
Invoiced to Date: $160,537.14
Project Description: Dodge Edna Moore Road
PI No: 0011908
Regional Project Id: HG-0207
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $631,200
Invoiced to Date: $568,975.27
Project Description: Dodge Roddy Highway
PI No: 0011909
Regional Project Id: HG-0208
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $470,400
Invoiced to Date: $402,427.02
Project Description: Dodge Horne Road
PI No: 0011910
Regional Project Id: HG-0209
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $236,000
Invoiced to Date: $350,914.40
Project Description: Dodge Jim Ross Road = Part (2.95 mi) - (Begin at SR 87 End at Ran Stewart Road (CR 74))
PI No: 0011911
Regional Project Id: HG-0221
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $57,331.78
Project Description: Chauncey Bussy Street
PI No: 0011912
Regional Project Id: HG-0219
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $42,000
Invoiced to Date: $39,303.75
Project Description: Chauncey Bush Avenue -(.3 mile not on LMIG)
PI No: 0011913
Regional Project Id: HG-0220
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $31,920
Invoiced to Date: $49,461.50
Project Description: Chauncey Durham Street - (.228 mile not on LMIG)
PI No: 0011914
Regional Project Id: HG-0242
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $63,636
Invoiced to Date: $59,124.59
Project Description: Eastman Ward St - Dodge Ave to 1st Ave
PI No: 0011915
Regional Project Id: HG-0228
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $17,632
Invoiced to Date: $17,247.28
Project Description: Eastman Oak Street-Golf Course Rd to Cochran Hwy
PI No: 0011916
Regional Project Id: HG-0229
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $3,447
Invoiced to Date: $3,354.61
Project Description: Eastman Douglas St-Rose St to dead end
PI No: 0011917
Regional Project Id: HG-0248
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $17,367
Invoiced to Date: $17,006.96
Project Description: Eastman Asbury Drive - Sheldon to Sheldon
PI No: 0011918
Regional Project Id: HG-0277
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $37,651
Invoiced to Date: $36,868.37
Project Description: Eastman Forest Lake Rd - 4th to 9th
PI No: 0011919
Regional Project Id: HG-0274
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $56,742
Invoiced to Date: $55,648.64
Project Description: Eastman 4th Ave - Congo Lane to Legion Dr
PI No: 0011920
Regional Project Id: HG-0264
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $34,072
Invoiced to Date: $33,138.08
Project Description: Eastman West Main - 5th to 9th Ave
PI No: 0011921
Regional Project Id: HG-0251
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $38,977
Invoiced to Date: $38,203.27
Project Description: Eastman Pine Haven Dr - College to Dead end
PI No: 0011922
Regional Project Id: HG-0247
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $30,492
Invoiced to Date: $29,638.70
Project Description: Eastman Norman Ave - 9th to Leitch
PI No: 0011923
Regional Project Id: HG-0243
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $6,708
Invoiced to Date: $6,232.20
Project Description: Eastman Ward St - Hwy 46 to 1st Ave
PI No: 0011924
Regional Project Id: HG-0240
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $14,371
Invoiced to Date: $14,028.44
Project Description: Eastman Bethel - 7th Ave to Anson
PI No: 0011925
Regional Project Id: HG-0280
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $43,219
Invoiced to Date: $42,369.87
Project Description: Eastman Main St - 14th Ave to 9th Ave
PI No: 0011926
Regional Project Id: HG-0261
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $32,348
Invoiced to Date: $31,503.47
Project Description: Eastman Leitch St - Livingston to 14th Ave
PI No: 0011927
Regional Project Id: HG-0283
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $14,981
Invoiced to Date: $14,645.38
Project Description: Eastman South Carolina St - 5th to Gum
PI No: 0011928
Regional Project Id: HG-0231
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $21,477
Invoiced to Date: $20,884.24
Project Description: Eastman North St-14th to Dixon St
PI No: 0011929
Regional Project Id: HG-0244
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $57,803
Invoiced to Date: $56,407.80
Project Description: Eastman James Ave - Ward St to South Carolina St
PI No: 0011930
Regional Project Id: HG-0233
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $29,644
Invoiced to Date: $28,861.57
Project Description: Eastman 4th Ave-Sheldon St to Hwy 46
PI No: 0011931
Regional Project Id: HG-0230
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $17,500
Invoiced to Date: $17,158.35
Project Description: Eastman 8th Ave-Bay to Oak
PI No: 0011932
Regional Project Id: HG-0296
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $8,617
Invoiced to Date: $8,540.00
Project Description: Eastman 8th Ave - Sheldon to Dead End
PI No: 0011933
Regional Project Id: HG-0265
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $29,299
Invoiced to Date: $28,623.22
Project Description: Eastman 13th Ave - Oak to Creighton
PI No: 0011934
Regional Project Id: HG-0239
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $18,560
Invoiced to Date: $18,069.25
Project Description: Eastman Rose St - Livingston to 9th Ave
PI No: 0011935
Regional Project Id: HG-0250
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $10,340
Invoiced to Date: $10,090.60
Project Description: Eastman Minter Ridge Dr - Minter Dr to Pine Haven
PI No: 0011936
Regional Project Id: HG-0252
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $10,340
Invoiced to Date: $10,113.39
Project Description: Eastman Minter Drive - College to Pine Haven
PI No: 0011937
Regional Project Id: HG-0385
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $37,784
Invoiced to Date: $37,446.00
Project Description: Eastman Woodlake Dr - North Lakes to Dead End
PI No: 0011938
Regional Project Id: HG-0276
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $61,276
Invoiced to Date: $60,074.04
Project Description: Eastman 7th Ave - Odgen to Forest Lake Rd
PI No: 0011939
Regional Project Id: HG-0272
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $6,628
Invoiced to Date: $6,453.89
Project Description: Eastman Pine St - 2nd to 1st
PI No: 0011940
Regional Project Id: HG-0246
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $19,223
Invoiced to Date: $19,051.00
Project Description: Eastman Leitch St - Livingston to 9th
PI No: 0011941
Regional Project Id: HG-0236
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $7,556
Invoiced to Date: $7,489.00
Project Description: Eastman Lee St - Dorough St to Leitch
PI No: 0011942
Regional Project Id: HG-0253
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $7,822
Invoiced to Date: $7,752.00
Project Description: Eastman Lakeview Ct - 10th to Dead End
PI No: 0011943
Regional Project Id: HG-0273
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $25,322
Invoiced to Date: $23,526.07
Project Description: Eastman Edgewood Rd - MLK Dr to MLK Dr
PI No: 0011944
Regional Project Id: HG-0294
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $27,628
Invoiced to Date: $27,381.00
Project Description: Eastman 7th Ave - Sheldon to Page
PI No: 0011945
Regional Project Id: HG-0312
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $17,234
Invoiced to Date: $17,079.00
Project Description: Eastman Foster St - 3rd Ave to Beulah
PI No: 0011946
Regional Project Id: HG-0234
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $21,079
Invoiced to Date: $20,891.00
Project Description: Eastman Page St- Hwy 46 to 1st Ave
PI No: 0011947
Regional Project Id: HG-0271
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $10,871
Invoiced to Date: $10,774.00
Project Description: Eastman 1st Ave - Oak to Plum
PI No: 0011948
Regional Project Id: HG-0263
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $27,443
Invoiced to Date: $27,197.00
Project Description: Eastman Delacey St - 4th to 7th
PI No: 0011949
Regional Project Id: HG-0245
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $74,242
Invoiced to Date: $73,578.00
Project Description: Eastman Main St - 1st Ave to Dodge Ave
PI No: 0011950
Regional Project Id: HG-0241
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $13,787
Invoiced to Date: $12,809.67
Project Description: Eastman Ada St - 14th to Dead end
PI No: 0011951
Regional Project Id: HG-0237
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $16,174
Invoiced to Date: $16,029.00
Project Description: Eastman Lee St - Leitch to Page
PI No: 0011952
Regional Project Id: HG-0235
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $22,803
Invoiced to Date: $22,599.00
Project Description: Eastman Neese St - 14th to Lee
PI No: 0011953
Regional Project Id: HG-0297
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $9,545
Invoiced to Date: $9,460.00
Project Description: Eastman Park St - 5th to 3rd
PI No: 0011954
Regional Project Id: HG-0286
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $31,287
Invoiced to Date: $31,008.00
Project Description: Eastman Eastman St - 9th to 12th
PI No: 0011955
Regional Project Id: HG-0313
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $49,497
Invoiced to Date: $48,255.29
Project Description: Eastman Beulah St - Mt Moriah St to Ward St
PI No: 0011956
Regional Project Id: HG-0320
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $50,644
Invoiced to Date: $50,191.00
Project Description: Eastman College St - Oak to 5th
PI No: 0011957
Regional Project Id: HG-0309
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $24,526
Invoiced to Date: $24,307.00
Project Description: Eastman King St - 1st Ave to Hwy 46
PI No: 0011958
Regional Project Id: HG-0326
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $27,045
Invoiced to Date: $25,127.30
Project Description: Eastman Morgan Creek Dr - Mary Alexander to Bypass
PI No: 0011959
Regional Project Id: HG-0335
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $40,037
Invoiced to Date: $39,679.00
Project Description: Eastman Creighton St - 14th to 9th
PI No: 0011960
Regional Project Id: HG-0404
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,246
Invoiced to Date: $15,109.00
Project Description: Eastman Greenhill - 4th to 7th Ave
PI No: 0011961
Regional Project Id: HG-0255
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $9,412
Invoiced to Date: $9,328.00
Project Description: Eastman Durhart St - Plum to Dead end
PI No: 0011962
Regional Project Id: HG-0256
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $9,943
Invoiced to Date: $9,854.00
Project Description: Eastman Morgan St - Plum to Dead End
PI No: 0011963
Regional Project Id: HG-0257
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $11,799
Invoiced to Date: $11,693.00
Project Description: Eastman Plum St - 2nd to MLK Dr
PI No: 0011964
Regional Project Id: HG-0258
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $6,894
Invoiced to Date: $6,406.00
Project Description: Eastman Popular St - 2nd to 1st
PI No: 0011965
Regional Project Id: HG-0259
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $11,534
Invoiced to Date: $11,431.00
Project Description: Eastman Burch St - 2nd to MLK Dr
PI No: 0011966
Regional Project Id: HG-0270
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $32,481
Invoiced to Date: $32,191.00
Project Description: Eastman 3rd Ave - Odgen to Oak
PI No: 0011967
Regional Project Id: HG-0278
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $22,935
Invoiced to Date: $22,730.00
Project Description: Eastman Lee St - Main to Dorough St
PI No: 0011968
Regional Project Id: HG-0238
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $25,984
Invoiced to Date: $25,751.00
Project Description: Eastman Park St - 14th Ave to Lee
PI No: 0011969
Regional Project Id: HG-0267
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $17,234
Invoiced to Date: $16,011.66
Project Description: Eastman 11th Ave - Pine Dr to Oak
PI No: 0011970
Regional Project Id: HG-0300
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $37,519
Invoiced to Date: $37,183.00
Project Description: Eastman Legion Dr - Griffin to 3rd Ave
PI No: 0011971
Regional Project Id: HG-0299
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $42,159
Invoiced to Date: $41,782.00
Project Description: Eastman MLK Dr - 1st to Legion Dr
PI No: 0011972
Regional Project Id: HG-0293
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $22,670
Invoiced to Date: $22,467.00
Project Description: Eastman 7th Ave - Page to Norman
PI No: 0011973
Regional Project Id: HG-0422
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $32,481
Invoiced to Date: $30,178.49
Project Description: Eastman 12th Ave - Fitzgerald to Oak
PI No: 0011974
Regional Project Id: HG-0423
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $18,295
Invoiced to Date: $16,998.65
Project Description: Eastman 11th Ave - Creighton to Pine Drive
PI No: 0011975
Regional Project Id: HG-0336
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $36,060
Invoiced to Date: $35,738.00
Project Description: Eastman Park St - 5th to 10th
PI No: 0011976
Regional Project Id: HG-0310
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $16,306
Invoiced to Date: $15,149.68
Project Description: Eastman Foster St - Hwy 46 to 3rd Ave
PI No: 0011977
Regional Project Id: HG-0311
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $5,674
Invoiced to Date: $5,271.69
Project Description: Eastman Foster St - Hwy 46 to Anson Ave
PI No: 0011978
Regional Project Id: HG-0350
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $30,094
Invoiced to Date: $27,952.11
Project Description: Eastman Golf Course Rd - Cochran Rd to Jack Johnson
PI No: 0011979
Regional Project Id: HG-0279
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $16,572
Invoiced to Date: $15,396.65
Project Description: Eastman Ogden St - 2nd to 5th
PI No: 0011980
Regional Project Id: HG-0282
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $9,545
Invoiced to Date: $8,868.43
Project Description: Eastman Livingston St - Leitch to Page
PI No: 0011981
Regional Project Id: HG-0290
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $17,287
Invoiced to Date: $16,061.71
Project Description: Eastman North St - Page to 14th Ave
PI No: 0011982
Regional Project Id: HG-0295
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $22,007
Invoiced to Date: $20,446.29
Project Description: Eastman Dorough St - 14th to Norman
PI No: 0011983
Regional Project Id: HG-0254
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $38,712
Invoiced to Date: $35,967.91
Project Description: Eastman 10th Ave - Forest Lake to 9th
PI No: 0011984
Regional Project Id: HG-0275
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $6,628
Invoiced to Date: $6,158.04
Project Description: Eastman 3rd Ave - Legion Dr to Delacy St
PI No: 0011985
Regional Project Id: HG-0353
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $13,257
Invoiced to Date: $12,316.84
Project Description: Eastman 10th Ave - Main to Oak
PI No: 0011986
Regional Project Id: HG-0348
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,269
Invoiced to Date: $10,470.22
Project Description: Eastman Greenwood St - 5th to 7th
PI No: 0011987
Regional Project Id: HG-0298
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $9,280
Invoiced to Date: $8,622.02
Project Description: Eastman Magnolia St - 5th to 3rd
PI No: 0011988
Regional Project Id: HG-0318
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $32,878
Invoiced to Date: $30,586.04
Project Description: Eastman 9th Ave - Page to City Limits
PI No: 0011989
Regional Project Id: HG-0337
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $30,094
Invoiced to Date: $27,952.11
Project Description: Eastman Pine St - 10th to 5th
PI No: 0011990
Regional Project Id: HG-0339
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,931
Invoiced to Date: $10,916.33
Project Description: Eastman 7th Ave - Oak St to Dead end
PI No: 0011991
Regional Project Id: HG-0354
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,534
Invoiced to Date: $10,716.63
Project Description: Eastman 12th Ave - Main to Oak
PI No: 0011992
Regional Project Id: HG-0355
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $10,871
Invoiced to Date: $10,100.83
Project Description: Eastman 13th Ave - Oak to Main
PI No: 0011993
Regional Project Id: HG-0346
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $13,257
Invoiced to Date: $12,316.84
Project Description: Eastman 14th Ave - Main to Oak
PI No: 0011994
Regional Project Id: HG-0356
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $16,306
Invoiced to Date: $15,149.68
Project Description: Eastman 8th Ave - Main to Oak
PI No: 0011995
Regional Project Id: HG-0357
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $13,655
Invoiced to Date: $12,687.24
Project Description: 7th Ave - Oak to Main
PI No: 0011996
Regional Project Id: HG-0358
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $12,197
Invoiced to Date: $11,332.44
Project Description: 6th Ave - Main to Oak
PI No: 0011997
Regional Project Id: HG-0362
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $9,015
Invoiced to Date: $8,376.62
Project Description: Eastman Hardin St - Page To Dead End
PI No: 0011998
Regional Project Id: HG-0249
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $10,340
Invoiced to Date: $10,248.00
Project Description: Eastman Minter Ct - Minter Dr to Dead end
PI No: 0011999
Regional Project Id: HG-0260
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $31,685
Invoiced to Date: $29,438.70
Project Description: Eastman Jessup St - 9th Ave to 4th Ave
PI No: 0012000
Regional Project Id: HG-0332
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $5,965
Invoiced to Date: $5,542.23
Project Description: Eastman Park Way - 5th Ave to Main
PI No: 0012006
Regional Project Id: HG-0317
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $44,015
Invoiced to Date: $4,348.02
Project Description: Eastman 9th Ave - Oak to Page
PI No: 0012008
Regional Project Id: HG-0302
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $7,689
Invoiced to Date: $7,145.02
Project Description: Eastman Oak Ct - Pine Haven to Dead End
PI No: 0012009
Regional Project Id: HG-0301
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $61,647
Invoiced to Date: $60,013.34
Project Description: Eastman 5th Ave - Odgen to Forest Lake Rd
PI No: 0012010
Regional Project Id: HG-0321
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $17,632
Invoiced to Date: $16,420.56
Project Description: Eastman Odgen Lane - 2nd to 5th
PI No: 0012014
Regional Project Id: HG-0281
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,391
Invoiced to Date: $10,583.31
Project Description: Eastman Clements St - 4th to 7th
PI No: 0012016
Regional Project Id: HG-0397
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $26,939
Invoiced to Date: $26,698.00
Project Description: Eastman Harrison St - 1st Ave to Nanacy
PI No: 0012017
Regional Project Id: HG-0409
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,931
Invoiced to Date: $10,916.33
Project Description: Eastman 1st Ave - 5th Ave to South Carolina
PI No: 0012020
Regional Project Id: HG-0376
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $17,500
Invoiced to Date: $16,259.64
Project Description: Eastman Locust Lane - Hawkinsville Rd to Dead End
PI No: 0012021
Regional Project Id: HG-0375
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $14,715
Invoiced to Date: $13,671.65
Project Description: Eastman Laurel Lane - Dead End to Dead End
PI No: 0012033
Regional Project Id: HG-0364
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $6,363
Invoiced to Date: $6,219.84
Project Description: Eastman Medical Center Dr - Legion to Griffin
PI No: 0012036
Regional Project Id: HG-0361
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $9,280
Invoiced to Date: $8,622.02
Project Description: Eastman 17th Ave - Main to Oak
PI No: 0012037
Regional Project Id: HG-0325
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $14,185
Invoiced to Date: $13,179.06
Project Description: Eastman Oak Forest Rd - Plaza to Dead End
PI No: 0012038
Regional Project Id: HG-0322
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $17,897
Invoiced to Date: $17,737.00
Project Description: Eastman Wright Dr - 2nd to 5th
PI No: 0012039
Regional Project Id: HG-0329
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $30,890
Invoiced to Date: $28,700.46
Project Description: Eastman 4th Ave - 5th to Main
PI No: 0012040
Regional Project Id: HG-0405
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $17,977
Invoiced to Date: $16,702.42
Project Description: Eastman Wendy Way - Nancy St to Russell St
PI No: 0012041
Regional Project Id: HG-0425
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $25,587
Invoiced to Date: $23,772.49
Project Description: Eastman Pine Dr - 9th to 12th
PI No: 0012042
Regional Project Id: HG-0292
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $53,030
Invoiced to Date: $49,259.15
Project Description: Eastman Sheldon St - Anson Ave to Dead End
PI No: 0012043
Regional Project Id: HG-0507
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $507,823
Invoiced to Date: $507,823.00
Project Description: Emanuel Extension Fairground Rd
PI No: 0012044
Regional Project Id: HG-0443
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $840,000
Invoiced to Date: $814,500.25
Project Description: Emanuel Canoochee Rd
PI No: 0012045
Regional Project Id: HG-0493
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $210,000
Invoiced to Date: $345,437.43
Project Description: Emanuel Odomville Church Rd
PI No: 0012046
Regional Project Id: HG-0464
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $490,000
Invoiced to Date: $373,569.27
Project Description: Emanuel Meeks Rd
PI No: 0012047
Regional Project Id: HG-0473
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $350,000
Invoiced to Date: $406,306.36
Project Description: Emanuel Quick Road
PI No: 0012048
Regional Project Id: HG-0482
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $840,000
Invoiced to Date: $786,851.81
Project Description: Emanuel Old Kenfield Rd
PI No: 0012049
Regional Project Id: HG-0430
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $924,000
Invoiced to Date: $895,121.62
Project Description: Emanuel Old Savannah Rd
PI No: 0012050
Regional Project Id: HG-0479
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $490,000
Invoiced to Date: $664,132.63
Project Description: Emanuel Pendleton Springs Rd
PI No: 0012051
Regional Project Id: HG-0467
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Minor Widen & Resurfacing
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $378,000
Invoiced to Date: $222,312.12
Project Description: Emanuel Parrish Pond Rd
PI No: 0012052
Regional Project Id: HG-0516
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $42,000
Invoiced to Date: $23,596.08
Project Description: Garfield Old Augusta Rd
PI No: 0012053
Regional Project Id: HG-0522
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $27,128
Invoiced to Date: $16,059.07
Project Description: Garfield Sybil Street
PI No: 0012054
Regional Project Id: HG-0524
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $86,800
Invoiced to Date: $85,977.15
Project Description: Swainsboro North Green Street
PI No: 0012055
Regional Project Id: HG-0525
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $168,000
Invoiced to Date: $166,498.00
Project Description: Swainsboro Lambs Bridge Road
PI No: 0012056
Regional Project Id: HG-0526
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $122,080
Invoiced to Date: $113,396.59
Project Description: Swainsboro North Coleman St
PI No: 0012057
Regional Project Id: HG-0530
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $224,000
Invoiced to Date: $224,000.00
Project Description: Swainsboro Meadow Lake East
PI No: 0012058
Regional Project Id: HG-0531
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $184,800
Invoiced to Date: $184,800.00
Project Description: Swainsboro King Circle Dr
PI No: 0012059
Regional Project Id: HG-0552
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $42,000
Invoiced to Date: $42,000.00
Project Description: Swainsboro Braswell Blvd
PI No: 0012060
Regional Project Id: HG-0553
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $13,623.72
Project Description: Swainsboro Short Street
PI No: 0012061
Regional Project Id: HG-0529
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $299,864
Invoiced to Date: $297,183.00
Project Description: Swainsboro Downtown Sidewalk and Streetscape (Part)
PI No: 0012062
Regional Project Id: HG-0532
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $154,000
Invoiced to Date: $145,729.65
Project Description: Swainsboro Industrial Way
PI No: 0012063
Regional Project Id: HG-0537
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $32,476.03
Project Description: Swainsboro Fortune Loop
PI No: 0012064
Regional Project Id: HG-0539
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $30,886.50
Project Description: Swainsboro Hill St
PI No: 0012065
Regional Project Id: HG-0546
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $156,800
Invoiced to Date: $138,845.14
Project Description: Swainsboro Thigpen Dr
PI No: 0012066
Regional Project Id: HG-0551
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $112,000
Invoiced to Date: $76,856.02
Project Description: Swainsboro Oaklawn Dr
PI No: 0012067
Regional Project Id: HG-0554
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $50,806.61
Project Description: Swainsboro William Rountree St
PI No: 0012068
Regional Project Id: HG-0555
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $32,160.36
Project Description: Swainsboro Howard St
PI No: 0012069
Regional Project Id: HG-0536
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $84,000
Invoiced to Date: $54,447.96
Project Description: Swainsboro Prosperity Dr
PI No: 0012070
Regional Project Id: HG-0538
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $224,000
Invoiced to Date: $221,997.00
Project Description: Swainsboro West Meadow Lake
PI No: 0012071
Regional Project Id: HG-0540
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $112,000
Invoiced to Date: $86,125.42
Project Description: Swainsboro Arden Dr
PI No: 0012072
Regional Project Id: HG-0533
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $196,000
Invoiced to Date: $164,135.82
Project Description: Swainsboro Race Track St
PI No: 0012073
Regional Project Id: HG-0534
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $147,000
Invoiced to Date: $68,054.54
Project Description: Swainsboro Martin Luther King Jr
PI No: 0012074
Regional Project Id: HG-0543
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $126,000
Invoiced to Date: $118,740.56
Project Description: Swainsboro Mcleod Bridge Rd
PI No: 0012075
Regional Project Id: HG-0544
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $210,000
Invoiced to Date: $176,907.65
Project Description: Swainsboro Old Nunez Rd
PI No: 0012076
Regional Project Id: HG-0545
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $13,875.00
Project Description: Swainsboro East Moring St
PI No: 0012077
Regional Project Id: HG-0547
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $63,000
Invoiced to Date: $62,437.00
Project Description: Swainsboro Lake Luck Dr
PI No: 0012078
Regional Project Id: HG-0549
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $289,800
Invoiced to Date: $263,497.67
Project Description: Swainsboro Kite Rd
PI No: 0012079
Regional Project Id: HG-0550
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $32,517.13
Project Description: Swainsboro Moreland Ave
PI No: 0012080
Regional Project Id: HG-0570
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $985,000
Invoiced to Date: $969,849.96
Project Description: Evans Reg Replace Bridge over Bull Creek on Sunbury R
PI No: 0012081
Regional Project Id: HG-0571
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $580,000
Invoiced to Date: $568,477.42
Project Description: Evans Reg Replace Bridge over Scotts Creek on Daisy N
PI No: 0012082
Regional Project Id: HG-0564
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $434,000
Invoiced to Date: $364,650.83
Project Description: Evans Reg Bill Hodges Rd Resurfacing
PI No: 0012083
Regional Project Id: HG-0565
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $54,850.47
Project Description: EvansReg Commercial Blvd Resurfacing
PI No: 0012084
Regional Project Id: HG-0572
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $154,000
Invoiced to Date: $152,623.00
Project Description: Evans FE Beasly Rd
PI No: 0012085
Regional Project Id: HG-0574
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $504,000
Invoiced to Date: $391,755.16
Project Description: Evans Bowen Rd
PI No: 0012086
Regional Project Id: HG-0566
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $252,000
Invoiced to Date: $209,526.62
Project Description: EvansReg John W. Tippins Rd Resurfacing
PI No: 0012087
Regional Project Id: HG-0575
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $266,000
Invoiced to Date: $262,010.00
Project Description: Evans Stafford Rd
PI No: 0012088
Regional Project Id: HG-0577
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $154,000
Invoiced to Date: $151,690.00
Project Description: Evans Lex Strickland Rd
PI No: 0012089
Regional Project Id: HG-0578
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $55,160.00
Project Description: Evans Melissa Circle
PI No: 0012090
Regional Project Id: HG-0593
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $17,898
Invoiced to Date: $17,559.00
Project Description: Bellville Hugh Brewton St - (Part) (East City Limits West 675 ft)
PI No: 0012091
Regional Project Id: HG-0595
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $42,969
Invoiced to Date: $37,150.84
Project Description: Bellville Henry Street - Buckcravey Dr
PI No: 0012092
Regional Project Id: HG-0596
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $27,708
Invoiced to Date: $23,947.96
Project Description: Claxton Perry Lee Deloach
PI No: 0012093
Regional Project Id: HG-0597
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $15,297
Invoiced to Date: $12,035.37
Project Description: Claxton West Liberty Street Seg 1
PI No: 0012094
Regional Project Id: HG-0598
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $47,980
Invoiced to Date: $33,487.53
Project Description: Claxton West Liberty Street Seg 2
PI No: 0012095
Regional Project Id: HG-0599
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $22,323
Invoiced to Date: $20,404.94
Project Description: Claxton West Liberty Street Seg 3
PI No: 0012096
Regional Project Id: HG-0600
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $61,994
Invoiced to Date: $40,168.45
Project Description: Claxton West Liberty Street Seg 4
PI No: 0012097
Regional Project Id: HG-0601
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $29,531
Invoiced to Date: $20,655.80
Project Description: Claxton West Liberty Street Seg 5
PI No: 0012098
Regional Project Id: HG-0602
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $29,942
Invoiced to Date: $19,471.74
Project Description: Claxton Courthouse St
PI No: 0012099
Regional Project Id: HG-0603
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $7,772
Invoiced to Date: $9,384.34
Project Description: Claxton Turnpike Rd
PI No: 0012100
Regional Project Id: HG-0604
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $48,374
Invoiced to Date: $24,055.83
Project Description: Claxton North Peters St
PI No: 0012101
Regional Project Id: HG-0605
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $28,613
Invoiced to Date: $26,744.98
Project Description: Claxton North College St Seg 1
PI No: 0012102
Regional Project Id: HG-0606
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $20,565
Invoiced to Date: $22,909.12
Project Description: Claxton North College Street Seg 2
PI No: 0012103
Regional Project Id: HG-0607
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $11,287
Invoiced to Date: $12,113.45
Project Description: Claxton North Clark St
PI No: 0012104
Regional Project Id: HG-0608
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $21,329
Invoiced to Date: $21,461.90
Project Description: Claxton South Clark St
PI No: 0012105
Regional Project Id: HG-0609
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $21,371
Invoiced to Date: $17,026.79
Project Description: Claxton South Clark Street
PI No: 0012106
Regional Project Id: HG-0610
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $112,673
Invoiced to Date: $108,793.41
Project Description: Claxton Church St
PI No: 0012107
Regional Project Id: HG-0611
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $85,800
Invoiced to Date: $92,228.91
Project Description: Claxton S College St
PI No: 0012108
Regional Project Id: HG-0612
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $22,629
Invoiced to Date: $21,724.72
Project Description: Claxton S Ralph St
PI No: 0012109
Regional Project Id: HG-0613
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,989
Invoiced to Date: $10,661.92
Project Description: Claxton City Hall Alley
PI No: 0012110
Regional Project Id: HG-0614
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $40,600
Invoiced to Date: $37,667.60
Project Description: Claxton Barnes St
PI No: 0012111
Regional Project Id: HG-0615
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $13,881
Invoiced to Date: $14,561.95
Project Description: Claxton Freeman St
PI No: 0012112
Regional Project Id: HG-0616
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $63,169
Invoiced to Date: $59,268.19
Project Description: Claxton S Claxton Ave
PI No: 0012113
Regional Project Id: HG-0617
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $29,617
Invoiced to Date: $30,220.93
Project Description: Claxton Ridge Street
PI No: 0012114
Regional Project Id: HG-0618
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $120,733
Invoiced to Date: $79,531.06
Project Description: Claxton E Long St
PI No: 0012115
Regional Project Id: HG-0619
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $10,642
Invoiced to Date: $9,595.92
Project Description: Claxton Bowen Lane
PI No: 0012116
Regional Project Id: HG-0621
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $82,197
Invoiced to Date: $72,468.90
Project Description: Claxton S Peters St
PI No: 0012117
Regional Project Id: HG-0623
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $34,035
Invoiced to Date: $66,727.62
Project Description: Claxton E Smith St - (Part) (S. Newton St. to Anderson Ave.)
PI No: 0012118
Regional Project Id: HG-0629
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $15,900
Invoiced to Date: $14,097.65
Project Description: Daisy East Main St.
PI No: 0012119
Regional Project Id: HG-0628
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $18,200
Invoiced to Date: $36,380.88
Project Description: Daisy East Railroad St
PI No: 0012120
Regional Project Id: HG-0627
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $25,189
Invoiced to Date: $27,836.27
Project Description: Daisy West Railroad St
PI No: 0012121
Regional Project Id: HG-0631
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $68,800
Invoiced to Date: $61,402.04
Project Description: Hagan Cedar Ave - Tattnall St to City Limits
PI No: 0012122
Regional Project Id: HG-0632
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $93,800
Invoiced to Date: $63,971.91
Project Description: Hagan Turnpike Rd - Hodges St to City Limts
PI No: 0012123
Regional Project Id: HG-0633
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $39,200
Invoiced to Date: $25,582.11
Project Description: Hagan Hodges St - Hwy 280 to City Limits
PI No: 0012124
Regional Project Id: HG-0634
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $74,200
Invoiced to Date: $57,947.12
Project Description: Hagan Old Dublin Rd - Cemetery to Old Metter Hwy
PI No: 0012125
Regional Project Id: HG-0635
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $19,600
Invoiced to Date: $17,317.53
Project Description: Hagan Pine Ave - Brewton to Hodges
PI No: 0012126
Regional Project Id: HG-0636
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $30,800
Invoiced to Date: $26,135.97
Project Description: Hagan Cemetery Rd - Turnpike to Old Dublin
PI No: 0012127
Regional Project Id: HG-0637
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $7,000
Invoiced to Date: $5,146.83
Project Description: Hagan Calhoun Street
PI No: 0012128
Regional Project Id: HG-0630
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $68,600
Invoiced to Date: $46,371.23
Project Description: Hagan South Railroad Ave -Perkins Mill to Calhoun St
PI No: 0012129
Regional Project Id: HG-0638
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $37,800
Invoiced to Date: $32,581.44
Project Description: Hagan Hodges St - Hwy 280 to Cedar
PI No: 0012130
Regional Project Id: HG-0657
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $9,800
Invoiced to Date: $9,712.00
Project Description: Hagan Smith St - Hwy 280 to Turnpike
PI No: 0012131
Regional Project Id: HG-0664
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $99,400
Invoiced to Date: $97,517.00
Project Description: Jeff Davis CA Holmes Rd
PI No: 0012132
Regional Project Id: HG-0681
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $143,800
Invoiced to Date: $141,076.00
Project Description: Jeff Davis John Long Rd
PI No: 0012133
Regional Project Id: HG-0677
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $938,980
Invoiced to Date: $930,585.00
Project Description: Jeff Davis Bridgeford Church Rd - CR 296
PI No: 0012134
Regional Project Id: HG-0675
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $537,600
Invoiced to Date: $532,794.00
Project Description: Jeff Davis Pat Dixon Rd
PI No: 0012135
Regional Project Id: HG-0670
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $75,600
Invoiced to Date: $74,168.00
Project Description: Jeff Davis Buford Rd - CR 280
PI No: 0012136
Regional Project Id: HG-0676
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $80,080
Invoiced to Date: $78,563.00
Project Description: Jeff Davis John Osburne Rd
PI No: 0012137
Regional Project Id: HG-0669
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $323,120
Invoiced to Date: $317,000.00
Project Description: Jeff Davis JA Yawn Rd - CR 245
PI No: 0012138
Regional Project Id: HG-0666
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $637,420
Invoiced to Date: $631,721.00
Project Description: Jeff Davis WH Smith Rd - CR 38 and 297
PI No: 0012139
Regional Project Id: HG-0671
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $78,680
Invoiced to Date: $77,190.00
Project Description: Jeff Davis McDaniel Rd - CR 249
PI No: 0012140
Regional Project Id: HG-0667
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $547,200
Invoiced to Date: $564,540.00
Project Description: Jeff Davis Philadelphia Church Rd - CR 294
PI No: 0012141
Regional Project Id: HG-0672
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $245,000
Invoiced to Date: $253,109.00
Project Description: Jeff Davis Satilla Church Rd
PI No: 0012142
Regional Project Id: HG-0691
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $412,975
Invoiced to Date: $415,855.10
Project Description: Jeff Davis Elizabeth Church Rd
PI No: 0012143
Regional Project Id: HG-0695
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $84,000
Invoiced to Date: $82,409.00
Project Description: Hazlehurst North Miller St
PI No: 0012144
Regional Project Id: HG-0696
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $112,000
Invoiced to Date: $109,879.00
Project Description: Hazlehurst Latimer St
PI No: 0012145
Regional Project Id: HG-0697
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $98,000
Invoiced to Date: $96,112.94
Project Description: Hazlehurst West Odum St
PI No: 0012146
Regional Project Id: HG-0698
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $42,000
Invoiced to Date: $40,913.63
Project Description: Hazlehurst Pat Dixon Rd
PI No: 0012147
Regional Project Id: HG-0699
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $245,000
Invoiced to Date: $193,546.34
Project Description: Hazlehurst Hatten Still Rd
PI No: 0012148
Regional Project Id: HG-0700
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $54,824.93
Project Description: Hazlehurst Pine St
PI No: 0012149
Regional Project Id: HG-0701
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $33,254.19
Project Description: Hazlehurst Hester St
PI No: 0012150
Regional Project Id: HG-0702
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $98,000
Invoiced to Date: $74,889.97
Project Description: Hazlehurst Girtman St
PI No: 0012151
Regional Project Id: HG-0703
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $168,000
Invoiced to Date: $166,498.00
Project Description: Hazlehurst Williams St
PI No: 0012152
Regional Project Id: HG-0704
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $105,000
Invoiced to Date: $91,923.03
Project Description: Hazlehurst Martin Luther King Jr Dr
PI No: 0012153
Regional Project Id: HG-0705
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $7,500
Invoiced to Date: $7,432.50
Project Description: Hazlehurst South Tallahassee St - sidewalk
PI No: 0012154
Regional Project Id: HG-0706
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $45,000
Invoiced to Date: $41,497.29
Project Description: Hazlehurst Burketts Ferry Sidewalk
PI No: 0012155
Regional Project Id: HG-0707
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $125,000
Invoiced to Date: $122,169.43
Project Description: Hazlehurst Collins St Sidewalk
PI No: 0012156
Regional Project Id: HG-0708
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $98,000
Invoiced to Date: $50,723.00
Project Description: Hazlehurst Kersey St
PI No: 0012157
Regional Project Id: HG-0709
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $21,000
Invoiced to Date: $22,400.00
Project Description: Hazlehurst Sycamore St
PI No: 0012158
Regional Project Id: HG-0710
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $84,000
Invoiced to Date: $84,424.00
Project Description: Hazlehurst East Plum St
PI No: 0012159
Regional Project Id: HG-0711
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $98,000
Invoiced to Date: $95,412.00
Project Description: Hazlehurst Collins St
PI No: 0012160
Regional Project Id: HG-0712
County: Jeff Davis
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $140,000
Invoiced to Date: $93,882.38
Project Description: Hazlehurst Wilson St
PI No: 0012161
Regional Project Id: HG-0736
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $148,000
Invoiced to Date: $119,030.01
Project Description: Johnson Glen Donaldson Rd
PI No: 0012162
Regional Project Id: HG-0734
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $48,000
Invoiced to Date: $36,769.52
Project Description: Johnson Faith Tabernacle Rd
PI No: 0012163
Regional Project Id: HG-0733
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $168,000
Invoiced to Date: $145,921.50
Project Description: Johnson Calvary Church Rd
PI No: 0012164
Regional Project Id: HG-0745
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $284,000
Invoiced to Date: $224,776.00
Project Description: Johnson Snells Bridge Rd
PI No: 0012165
Regional Project Id: HG-0735
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $92,000
Invoiced to Date: $89,466.92
Project Description: Johnson Trinity Church Rd
PI No: 0012166
Regional Project Id: HG-0739
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $144,000
Invoiced to Date: $119,765.02
Project Description: Johnson James Grove Church Rd
PI No: 0012167
Regional Project Id: HG-0737
County: Johnson
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $320,000
Invoiced to Date: $241,161.50
Project Description: Johnson Cross Cedar Rd Seg 1
PI No: 0012168
Regional Project Id: HG-0738
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $212,000
Invoiced to Date: $160,707.50
Project Description: Johnson Cross Cedar Rd Seg 2
PI No: 0012169
Regional Project Id: HG-0747
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $574,000
Invoiced to Date: $1,323,000.00
Project Description: Johnson Tuckers Grove Church Rd Ph 1
PI No: 0012170
Regional Project Id: HG-0741
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $200,000
Invoiced to Date: $185,316.40
Project Description: Johnson Pringle Rd
PI No: 0012171
Regional Project Id: HG-0750
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $42,000
Invoiced to Date: $25,351.89
Project Description: Kite College St Priority 1
PI No: 0012172
Regional Project Id: HG-0751
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $17,500
Invoiced to Date: $15,629.00
Project Description: Kite Ohoopee St Pr 2
PI No: 0012173
Regional Project Id: HG-0752
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $9,350
Invoiced to Date: $10,386.00
Project Description: Kite Claxton Blvd
PI No: 0012174
Regional Project Id: HG-0753
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $26,220.89
Project Description: Kite Hatcher St
PI No: 0012175
Regional Project Id: HG-0766
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $245,000
Invoiced to Date: $208,644.05
Project Description: Wrightsville Idylwild Dr
PI No: 0012176
Regional Project Id: HG-0765
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $250,000
Invoiced to Date: $249,912.54
Project Description: Wrightsville Sidewalk Repair (Rapid Response)
PI No: 0012177
Regional Project Id: HG-0764
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $290,000
Invoiced to Date: $287,407.00
Project Description: Wrightsville Flanders Lynn Jan and Helen Sts
PI No: 0012178
Regional Project Id: HG-0763
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $172,000
Invoiced to Date: $169,502.75
Project Description: Wrightsville Lakeview Dr
PI No: 0012179
Regional Project Id: HG-0762
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $65,500
Invoiced to Date: $53,766.54
Project Description: Wrightsville Lee St
PI No: 0012180
Regional Project Id: HG-0761
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $185,000
Invoiced to Date: $144,674.99
Project Description: Wrightsville Myrtle Ave
PI No: 0012181
Regional Project Id: HG-0767
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $263,000
Invoiced to Date: $184,540.67
Project Description: Wrightsville Court St
PI No: 0012182
Regional Project Id: HG-0768
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $46,000
Invoiced to Date: $41,666.14
Project Description: Wrightsville Georgia Ave
PI No: 0012183
Regional Project Id: HG-0770
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $47,000
Invoiced to Date: $46,283.85
Project Description: Wrightsville Bradford St
PI No: 0012184
Regional Project Id: HG-0775
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $162,500
Invoiced to Date: $160,163.00
Project Description: Laurens Springhaven Bridge
PI No: 0012185
Regional Project Id: HG-0774
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $725,000
Invoiced to Date: $714,574.00
Project Description: Laurens Springhaven Rd
PI No: 0012186
Regional Project Id: HG-0776
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $487,500
Invoiced to Date: $480,489.00
Project Description: Laurens Walke Dairy Bridge
PI No: 0012188
Regional Project Id: HG-0781
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,040,000
Invoiced to Date: $472,434.80
Project Description: Old Hawkinsville Rd
PI No: 0012189
Regional Project Id: HG-0780
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $637,800
Invoiced to Date: $632,098.00
Project Description: Laurens Country Club Rd
PI No: 0012190
Regional Project Id: HG-0779
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $565,600
Invoiced to Date: $316,072.42
Project Description: Laurens Valambrosia Arthur Wolf Rd
PI No: 0012191
Regional Project Id: HG-0786
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $933,000
Invoiced to Date: $932,560.00
Project Description: Laurens Butler Rd
PI No: 0012192
Regional Project Id: HG-0798
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $630,000
Invoiced to Date: $233,557.69
Project Description: Laurens Watkins Hall Rd
PI No: 0012193
Regional Project Id: HG-0787
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $600,000
Invoiced to Date: $253,004.28
Project Description: Laurens Thairdell Rd
PI No: 0012194
Regional Project Id: HG-0788
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $831,000
Invoiced to Date: $823,570.00
Project Description: Laurens Stanley Cemetery Rd
PI No: 0012195
Regional Project Id: HG-0789
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $543,000
Invoiced to Date: $534,855.00
Project Description: Laurens Anderson Rd
PI No: 0012196
Regional Project Id: HG-0793
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $600,600
Invoiced to Date: $595,230.00
Project Description: Laurens Dublin Eastman Rd
PI No: 0012197
Regional Project Id: HG-0802
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $637,000
Invoiced to Date: $339,797.63
Project Description: Laurens Mark Wood Rd
PI No: 0012198
Regional Project Id: HG-0807
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $1,117,200
Invoiced to Date: $901,246.88
Project Description: Laurens Old Toomsboro Rd
PI No: 0012199
Regional Project Id: HG-0792
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $1,173,200
Invoiced to Date: $773,557.65
Project Description: Laurens Rock Springs Rd
PI No: 0012200
Regional Project Id: HG-0805
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $162,292
Invoiced to Date: $160,841.00
Project Description: Laurens Ed Becham Rd
PI No: 0012201
Regional Project Id: HG-0812
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $17,712
Invoiced to Date: $20,136.71
Project Description: Cadwell Coleman St Seg 1
PI No: 0012202
Regional Project Id: HG-0813
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $16,837
Invoiced to Date: $16,913.73
Project Description: Cadwell Coleman St Seg 2
PI No: 0012203
Regional Project Id: HG-0808
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $13,151
Invoiced to Date: $15,639.07
Project Description: Cadwell Colter St
PI No: 0012204
Regional Project Id: HG-0809
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $12,833
Invoiced to Date: $12,225.28
Project Description: Cadwell Snowhill St - Hwy 117 to Railroad
PI No: 0012205
Regional Project Id: HG-0814
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $12,674
Invoiced to Date: $24,770.00
Project Description: Cadwell Coleman St Seg 3
PI No: 0012206
Regional Project Id: HG-0811
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $12,249
Invoiced to Date: $13,215.25
Project Description: Cadwell Walnut St - Hwy 126 to Snowhill
PI No: 0012207
Regional Project Id: HG-0815
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $25,162
Invoiced to Date: $23,923.00
Project Description: Cadwell Coleman St Seg 4
PI No: 0012208
Regional Project Id: HG-0810
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $25,321
Invoiced to Date: $26,927.00
Project Description: Cadwell Walnut McCook St
PI No: 0012209
Regional Project Id: HG-0816
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $30,014
Invoiced to Date: $27,395.76
Project Description: Cadwell Coleman St Seg 5
PI No: 0012210
Regional Project Id: HG-0818
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $46,339
Invoiced to Date: $31,813.07
Project Description: Dexter Shy St - Hwy 339 to Cemetery
PI No: 0012211
Regional Project Id: HG-0819
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $59,005
Invoiced to Date: $35,043.27
Project Description: Dexter Railroad St
PI No: 0012212
Regional Project Id: HG-0821
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $50,024
Invoiced to Date: $48,456.13
Project Description: Dexter Harvey St Seg 1
PI No: 0012213
Regional Project Id: HG-0825
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $30,182
Invoiced to Date: $32,986.88
Project Description: Dexter Harvey St Seg 2
PI No: 0012214
Regional Project Id: HG-0822
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $40,752
Invoiced to Date: $25,169.13
Project Description: Dexter Bryant St Seg 1
PI No: 0012215
Regional Project Id: HG-0826
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $13,255
Invoiced to Date: $19,384.53
Project Description: Dexter Bryant St Seg 2
PI No: 0012216
Regional Project Id: HG-0831
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,130,000
Invoiced to Date: $1,135,867.42
Project Description: Dublin Hodges St
PI No: 0012217
Regional Project Id: HG-0830
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $575,000
Invoiced to Date: $271,051.48
Project Description: Dublin Springdale Rd
PI No: 0012218
Regional Project Id: HG-0832
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $3,530,000
Invoiced to Date: $3,725,660.90
Project Description: Dublin Stubbs Park Rd
PI No: 0012219
Regional Project Id: HG-0834
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $24,287
Invoiced to Date: $22,653.01
Project Description: Dudley Seventh St
PI No: 0012220
Regional Project Id: HG-0838
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $22,617
Invoiced to Date: $13,202.19
Project Description: Dudley Caroll Dr
PI No: 0012221
Regional Project Id: HG-0837
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $15,352
Invoiced to Date: $11,087.78
Project Description: Dudley Chestnut Dr
PI No: 0012222
Regional Project Id: HG-0833
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $12,462
Invoiced to Date: $7,673.26
Project Description: Dudley Carroll St
PI No: 0012223
Regional Project Id: HG-0840
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $36,882
Invoiced to Date: $30,282.88
Project Description: Dudley West St
PI No: 0012224
Regional Project Id: HG-0835
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $34,920
Invoiced to Date: $31,652.00
Project Description: Dudley Pecan St
PI No: 0012225
Regional Project Id: HG-0839
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $77,820
Invoiced to Date: $68,238.31
Project Description: Dudley Oak St
PI No: 0012226
Regional Project Id: HG-0873
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $61,992
Invoiced to Date: $35,888.78
Project Description: East Dublin Circle Dr
PI No: 0012227
Regional Project Id: HG-0842
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $41,231
Invoiced to Date: $24,218.21
Project Description: East Dublin Celia St
PI No: 0012228
Regional Project Id: HG-0843
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $22,246
Invoiced to Date: $10,431.15
Project Description: East Dublin Dwayne Dr
PI No: 0012229
Regional Project Id: HG-0845
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $17,023
Invoiced to Date: $11,892.31
Project Description: East Dublin Price St
PI No: 0012230
Regional Project Id: HG-0846
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $26,780
Invoiced to Date: $25,343.10
Project Description: East Dublin South Elm St
PI No: 0012231
Regional Project Id: HG-0844
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $46,269
Invoiced to Date: $29,493.28
Project Description: East Dublin Rice St
PI No: 0012232
Regional Project Id: HG-0847
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $31,182
Invoiced to Date: $20,978.00
Project Description: East Dublin Keen St
PI No: 0012233
Regional Project Id: HG-0848
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $7,955
Invoiced to Date: $10,371.00
Project Description: East Dublin Stanley St
PI No: 0012234
Regional Project Id: HG-0849
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $28,159
Invoiced to Date: $20,934.00
Project Description: East Dublin Virginia St
PI No: 0012235
Regional Project Id: HG-0850
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $32,640
Invoiced to Date: $26,149.00
Project Description: East Dublin Daley St
PI No: 0012236
Regional Project Id: HG-0851
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $25,905
Invoiced to Date: $26,051.00
Project Description: East Dublin Joiner St
PI No: 0012237
Regional Project Id: HG-0852
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $28,239
Invoiced to Date: $22,985.00
Project Description: East Dublin Derriso Ln
PI No: 0012238
Regional Project Id: HG-0853
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $39,189
Invoiced to Date: $31,369.00
Project Description: East Dublin North Elm St
PI No: 0012239
Regional Project Id: HG-0856
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $20,417
Invoiced to Date: $16,007.36
Project Description: East Dublin Piedmont Dr
PI No: 0012240
Regional Project Id: HG-0857
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $11,136
Invoiced to Date: $10,424.50
Project Description: East Dublin Torino Dr
PI No: 0012241
Regional Project Id: HG-0858
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $8,670
Invoiced to Date: $10,401.00
Project Description: East Dublin Falcon Dr
PI No: 0012242
Regional Project Id: HG-0874
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $31,845
Invoiced to Date: $26,113.00
Project Description: East Dublin Glen Dr
PI No: 0012243
Regional Project Id: HG-0872
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $11,375
Invoiced to Date: $10,477.50
Project Description: East Dublin Lewis St
PI No: 0012244
Regional Project Id: HG-0876
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $72,678
Invoiced to Date: $57,481.00
Project Description: East Dublin Attaway
PI No: 0012245
Regional Project Id: HG-0877
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $32,905
Invoiced to Date: $26,138.00
Project Description: East Dublin West Drive
PI No: 0012246
Regional Project Id: HG-0859
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $28,371
Invoiced to Date: $26,087.00
Project Description: East Dublin Atwood Dr
PI No: 0012247
Regional Project Id: HG-0860
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $23,227
Invoiced to Date: $29,332.00
Project Description: East Dublin Jordan St
PI No: 0012248
Regional Project Id: HG-0861
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $58,811
Invoiced to Date: $46,209.00
Project Description: East Dublin Marion St
PI No: 0012249
Regional Project Id: HG-0862
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $37,121
Invoiced to Date: $30,228.00
Project Description: East Dublin Braham St
PI No: 0012250
Regional Project Id: HG-0863
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $18,905
Invoiced to Date: $15,218.45
Project Description: East Dublin Rosewood Dr
PI No: 0012251
Regional Project Id: HG-0864
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $38,420
Invoiced to Date: $19,099.00
Project Description: East Dublin Larsen St
PI No: 0012252
Regional Project Id: HG-0865
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $18,110
Invoiced to Date: $13,730.00
Project Description: East Dublin South Dr
PI No: 0012253
Regional Project Id: HG-0866
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $109,269
Invoiced to Date: $93,922.70
Project Description: East Dublin Buckingham
PI No: 0012254
Regional Project Id: HG-0895
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $34,894
Invoiced to Date: $24,781.25
Project Description: East Dublin Powell Dr
PI No: 0012255
Regional Project Id: HG-0867
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $35,901
Invoiced to Date: $24,867.68
Project Description: East Dublin Ferry St Seg 1
PI No: 0012256
Regional Project Id: HG-0868
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $34,523
Invoiced to Date: $27,144.41
Project Description: East Dublin Getty St
PI No: 0012257
Regional Project Id: HG-0869
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $12,144
Invoiced to Date: $4,321.94
Project Description: East Dublin Taylor Ln
PI No: 0012258
Regional Project Id: HG-0870
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $62,008
Invoiced to Date: $44,119.19
Project Description: East Dublin Poplar St
PI No: 0012259
Regional Project Id: HG-0871
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $33,303
Invoiced to Date: $26,376.07
Project Description: East Dublin Stewart St
PI No: 0012260
Regional Project Id: HG-0875
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $20,549
Invoiced to Date: $18,774.00
Project Description: East Dublin Dorsey St
PI No: 0012261
Regional Project Id: HG-0878
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $25,826
Invoiced to Date: $17,466.20
Project Description: East Dublin Jackson St
PI No: 0012262
Regional Project Id: HG-0879
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $28,769
Invoiced to Date: $57,781.15
Project Description: East Dublin Ferry St Seg 2 - Part (Circle Dr to Johnson St)
PI No: 0012263
Regional Project Id: HG-0899
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $42,000
Invoiced to Date: $30,574.90
Project Description: Montrose Spur One
PI No: 0012264
Regional Project Id: HG-0896
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $30,606
Invoiced to Date: $26,604.38
Project Description: Montrose Railroad St - Part (.22 mile)
PI No: 0012265
Regional Project Id: HG-0909
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $16,465
Invoiced to Date: $15,709.29
Project Description: Rentz Pughsley Ave
PI No: 0012266
Regional Project Id: HG-0902
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $16,121
Invoiced to Date: $14,684.86
Project Description: Rentz Bedingfield St
PI No: 0012267
Regional Project Id: HG-0900
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $21,901
Invoiced to Date: $20,892.87
Project Description: Rentz Bates Ave Seg 1
PI No: 0012268
Regional Project Id: HG-0910
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $24,791
Invoiced to Date: $34,709.08
Project Description: Rentz West Railroad St
PI No: 0012269
Regional Project Id: HG-0911
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $27,973
Invoiced to Date: $21,397.68
Project Description: Rentz Simpson Ave
PI No: 0012270
Regional Project Id: HG-0904
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $34,946
Invoiced to Date: $22,026.90
Project Description: Rentz Circle Dr
PI No: 0012271
Regional Project Id: HG-0912
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $338,997
Invoiced to Date: $206,897.13
Project Description: Montgomery Thompson Pond Rd Ph 1
PI No: 0012272
Regional Project Id: HG-0913
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $443,520
Invoiced to Date: $316,285.02
Project Description: Montgomery Thompson Pond Rd Ph 2
PI No: 0012273
Regional Project Id: HG-0914
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $525,000
Invoiced to Date: $421,417.69
Project Description: Montgomery Thompson Pond Rd Ph 3
PI No: 0012274
Regional Project Id: HG-0915
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $525,000
Invoiced to Date: $471,777.35
Project Description: Montgomery Thompson Pond Rd Ph 4
PI No: 0012275
Regional Project Id: HG-0916
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $316,538
Invoiced to Date: $336,207.20
Project Description: Montgomery Taylor Springs Rd
PI No: 0012276
Regional Project Id: HG-0935
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $10,000
Invoiced to Date: $8,914.65
Project Description: Ailey West MLK Jr St Sidewalk (Rapid Response)
PI No: 0012277
Regional Project Id: HG-0934
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $10,000
Invoiced to Date: $8,009.85
Project Description: Ailey East MLK Jr Sidewalks (Rapid Response)
PI No: 0012278
Regional Project Id: HG-0933
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $20,000
Invoiced to Date: $18,197.77
Project Description: Ailey South Broad St sidewalk (Rapid Response)
PI No: 0012279
Regional Project Id: HG-0931
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $32,000
Invoiced to Date: $29,443.08
Project Description: Ailey East Gum St
PI No: 0012280
Regional Project Id: HG-0932
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $16,000
Invoiced to Date: $15,857.00
Project Description: Ailey S Lee St
PI No: 0012281
Regional Project Id: HG-0930
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $16,000
Invoiced to Date: $12,177.00
Project Description: Ailey East Peachtree St
PI No: 0012282
Regional Project Id: HG-0929
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $64,000
Invoiced to Date: $42,011.75
Project Description: Ailey North Broad St
PI No: 0012283
Regional Project Id: HG-0928
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $40,000
Invoiced to Date: $51,990.60
Project Description: Ailey West Old Ailey Lothair Rd
PI No: 0012284
Regional Project Id: HG-0927
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Pavement Markings
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $18,480
Invoiced to Date: $16,817.80
Project Description: Ailey City Street Striping
PI No: 0012285
Regional Project Id: HG-0936
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $30,000
Invoiced to Date: $29,380.85
Project Description: Alston Outler St
PI No: 0012286
Regional Project Id: HG-0937
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $8,000
Invoiced to Date: $7,928.00
Project Description: Alston Church St
PI No: 0012287
Regional Project Id: HG-0938
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $33,302
Invoiced to Date: $46,646.50
Project Description: Alston Wilkes Circle - Part (From Carrie Drive North approximately .11 miles)
PI No: 0012288
Regional Project Id: HG-0953
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $98,000
Invoiced to Date: $75,911.04
Project Description: Mt Vernon Church St
PI No: 0012289
Regional Project Id: HG-0956
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $54,221.88
Project Description: Mt Vernon Johnson St
PI No: 0012290
Regional Project Id: HG-0954
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $21,689.15
Project Description: Mt Vernon Dobbins St
PI No: 0012291
Regional Project Id: HG-0955
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $10,844.58
Project Description: Mt Vernon Faye D Brewer St
PI No: 0012292
Regional Project Id: HG-0965
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $36,284.00
Project Description: Mt Vernon Alston Rd
PI No: 0012293
Regional Project Id: HG-0952
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $67,200
Invoiced to Date: $54,368.00
Project Description: Mt Vernon W. Broad St
PI No: 0012294
Regional Project Id: HG-0959
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $109,200
Invoiced to Date: $103,622.60
Project Description: Mt Vernon MLK JR Dr
PI No: 0012295
Regional Project Id: HG-0957
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $41,079.00
Project Description: Mt Vernon Lester Robinson
PI No: 0012296
Regional Project Id: HG-0950
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $168,000
Invoiced to Date: $112,658.20
Project Description: Mt Vernon Old Ailey Lothair Rd
PI No: 0012297
Regional Project Id: HG-0946
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $105,000
Invoiced to Date: $90,864.30
Project Description: Mt Vernon Robinson St
PI No: 0012298
Regional Project Id: HG-0942
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $109,200
Invoiced to Date: $120,943.30
Project Description: Mt Vernon North Washington St
PI No: 0012299
Regional Project Id: HG-0941
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $27,976
Invoiced to Date: $22,676.00
Project Description: Mt Vernon South Washington St
PI No: 0012300
Regional Project Id: HG-1370
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $44,100
Invoiced to Date: $26,507.66
Project Description: Hamilton-Tarrytown Road (resurfacing) - Part (Begin at SR 15/29 and go .315 miles)
PI No: 0012301
Regional Project Id: HG-0968
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $60,865
Invoiced to Date: $53,325.84
Project Description: Vidalia Miracle Lane
PI No: 0012302
Regional Project Id: HG-0972
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $467,500
Invoiced to Date: $467,500.00
Project Description: Tattnall Dennis Oliver Rd
PI No: 0012303
Regional Project Id: HG-0975
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $570,150
Invoiced to Date: $482,396.69
Project Description: Tattnall Raymond Bland Rd
PI No: 0012304
Regional Project Id: HG-0976
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $909,040
Invoiced to Date: $682,852.45
Project Description: Tattnall Cyril Burkhalter and Mile Field Rd (Part) (Begin at Cyril Burkhalter RD GA 23/57 and End at US 301/73)
PI No: 0012305
Regional Project Id: HG-0977
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $2,052,400
Invoiced to Date: $1,730,127.29
Project Description: Tattnall Lynntown Rd
PI No: 0012306
Regional Project Id: HG-0978
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $966,000
Invoiced to Date: $825,961.26
Project Description: Tattnall Bubba Kennedy Rd
PI No: 0012307
Regional Project Id: HG-0980
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $1,132,500
Invoiced to Date: $1,078,994.80
Project Description: Tattnall Hillview Rd
PI No: 0012308
Regional Project Id: HG-0987
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $610,000
Invoiced to Date: $1,220,000.00
Project Description: Tattnall Airport Rd
PI No: 0012309
Regional Project Id: HG-1008
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $13,710
Invoiced to Date: $12,813.42
Project Description: Collins Broad St
PI No: 0012310
Regional Project Id: HG-1001
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $2,800
Invoiced to Date: $5,427.83
Project Description: Collins Plant St
PI No: 0012311
Regional Project Id: HG-1007
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $10,267
Invoiced to Date: $15,288.20
Project Description: Collins Pine St
PI No: 0012312
Regional Project Id: HG-1005
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $42,337.69
Project Description: Collins Pearl St
PI No: 0012313
Regional Project Id: HG-1006
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,550
Invoiced to Date: $13,712.70
Project Description: Collins Jones St
PI No: 0012314
Regional Project Id: HG-1004
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,867
Invoiced to Date: $12,314.79
Project Description: Collins Church St
PI No: 0012315
Regional Project Id: HG-1003
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $4,375
Invoiced to Date: $6,538.50
Project Description: Collins Williams St
PI No: 0012316
Regional Project Id: HG-1002
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $7,000
Invoiced to Date: $7,615.46
Project Description: Collins Railroad St
PI No: 0012317
Regional Project Id: HG-1036
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $154,420
Invoiced to Date: $152,200.00
Project Description: Glennville Hilltop Rd
PI No: 0012318
Regional Project Id: HG-1023
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $12,740
Invoiced to Date: $12,557.00
Project Description: Glennville Durrence St
PI No: 0012319
Regional Project Id: HG-1012
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $25,760
Invoiced to Date: $25,389.00
Project Description: Glennville Bonnie St
PI No: 0012320
Regional Project Id: HG-1048
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $23,100
Invoiced to Date: $22,768.00
Project Description: Glennville Mendel Ave East
PI No: 0012321
Regional Project Id: HG-1013
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $140,560
Invoiced to Date: $138,539.00
Project Description: Glennville Caswell St
PI No: 0012322
Regional Project Id: HG-1051
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,960
Invoiced to Date: $12,561.75
Project Description: Glennville Park Ave
PI No: 0012323
Regional Project Id: HG-1042
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $67,340
Invoiced to Date: $63,269.74
Project Description: Glennville Laura St
PI No: 0012324
Regional Project Id: HG-1021
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $42,700
Invoiced to Date: $36,091.22
Project Description: Glennville Cowart Ave
PI No: 0012325
Regional Project Id: HG-1059
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $98,560
Invoiced to Date: $91,791.79
Project Description: Glennville Sylvester Ashford Dr
PI No: 0012326
Regional Project Id: HG-1031
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $12,040
Invoiced to Date: $10,884.81
Project Description: Glennville Hal St
PI No: 0012327
Regional Project Id: HG-1024
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $49,980
Invoiced to Date: $41,541.12
Project Description: Glennville Gordon St
PI No: 0012328
Regional Project Id: HG-1020
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $14,700
Invoiced to Date: $12,470.26
Project Description: Glennville Corene Ave
PI No: 0012329
Regional Project Id: HG-1046
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $72,520
Invoiced to Date: $66,530.54
Project Description: Glennville Mann St
PI No: 0012330
Regional Project Id: HG-1043
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $29,400
Invoiced to Date: $24,064.91
Project Description: Glennville Lewis St
PI No: 0012331
Regional Project Id: HG-1025
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $24,920
Invoiced to Date: $21,077.08
Project Description: Glennville Adamson Ave
PI No: 0012332
Regional Project Id: HG-1037
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,540
Invoiced to Date: $12,562.46
Project Description: Glennville Institute St
PI No: 0012333
Regional Project Id: HG-1015
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $42,840
Invoiced to Date: $34,348.38
Project Description: Glennville Charlton St
PI No: 0012334
Regional Project Id: HG-1049
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $20,440
Invoiced to Date: $17,388.01
Project Description: Glennville Oakdale Dr
PI No: 0012335
Regional Project Id: HG-1055
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $14,560
Invoiced to Date: $12,382.07
Project Description: Glennville Rowland Ave
PI No: 0012336
Regional Project Id: HG-1017
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $85,120
Invoiced to Date: $70,182.41
Project Description: Glennville Church St
PI No: 0012337
Regional Project Id: HG-1032
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $113,960
Invoiced to Date: $105,555.31
Project Description: Glennville Hencart Rd (East)
PI No: 0012338
Regional Project Id: HG-1041
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $63,980
Invoiced to Date: $55,299.71
Project Description: Glennville Lakeview Dr
PI No: 0012339
Regional Project Id: HG-1009
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $39,620
Invoiced to Date: $33,634.54
Project Description: Glennville Azalea Rd
PI No: 0012340
Regional Project Id: HG-1035
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $119,700
Invoiced to Date: $102,652.45
Project Description: Glennville Herrington St
PI No: 0012341
Regional Project Id: HG-1038
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $31,780
Invoiced to Date: $31,058.97
Project Description: Glennville Irvin St
PI No: 0012342
Regional Project Id: HG-1030
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $46,480
Invoiced to Date: $39,574.48
Project Description: Glennville Greenwood Dr
PI No: 0012343
Regional Project Id: HG-1039
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $12,040
Invoiced to Date: $10,274.46
Project Description: Glennville Kelley St
PI No: 0012344
Regional Project Id: HG-1022
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $42,140
Invoiced to Date: $35,480.57
Project Description: Glennville-DeLoach Lane
PI No: 0012345
Regional Project Id: HG-1058
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $86,660
Invoiced to Date: $73,591.89
Project Description: Glennville Simon St
PI No: 0012346
Regional Project Id: HG-1063
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $39,760
Invoiced to Date: $35,989.72
Project Description: Glennville Water St
PI No: 0012347
Regional Project Id: HG-1019
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $37,660
Invoiced to Date: $24,182.78
Project Description: Glennville Continental Dr
PI No: 0012348
Regional Project Id: HG-1057
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $24,220
Invoiced to Date: $20,852.65
Project Description: Glennville Sharon Rd
PI No: 0012349
Regional Project Id: HG-1060
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $24,500
Invoiced to Date: $22,515.26
Project Description: Glennville Taylor Lane
PI No: 0012350
Regional Project Id: HG-1053
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $33,460
Invoiced to Date: $30,196.60
Project Description: Glennville Queen Dr
PI No: 0012351
Regional Project Id: HG-1010
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $69,020
Invoiced to Date: $58,780.20
Project Description: Glennville Baker St
PI No: 0012352
Regional Project Id: HG-1054
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $135,520
Invoiced to Date: $114,519.72
Project Description: Glennville Railroad St
PI No: 0012353
Regional Project Id: HG-1040
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $40,180
Invoiced to Date: $34,444.69
Project Description: Glennville Kicklighter St
PI No: 0012354
Regional Project Id: HG-1050
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $68,180
Invoiced to Date: $59,110.23
Project Description: Glennville Oliver Ln
PI No: 0012355
Regional Project Id: HG-1014
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $61,460
Invoiced to Date: $58,868.46
Project Description: Glennville Cedar St
PI No: 0012356
Regional Project Id: HG-1056
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $51,380
Invoiced to Date: $34,859.65
Project Description: Glennville Rustin St
PI No: 0012357
Regional Project Id: HG-1016
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $70,280
Invoiced to Date: $46,380.16
Project Description: Glennville China St
PI No: 0012358
Regional Project Id: HG-1011
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $106,680
Invoiced to Date: $86,055.19
Project Description: Glennville Banks St
PI No: 0012359
Regional Project Id: HG-1045
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $140,700
Invoiced to Date: $113,350.43
Project Description: Glennville Loves Chapel Rd
PI No: 0012360
Regional Project Id: HG-1070
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $105,000
Invoiced to Date: $104,449.38
Project Description: Reidsville Brumby Ave
PI No: 0012361
Regional Project Id: HG-1077
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $174,528
Invoiced to Date: $172,651.10
Project Description: Reidsville Lloyd St
PI No: 0012362
Regional Project Id: HG-1081
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $129,418
Invoiced to Date: $118,058.87
Project Description: Reidsville Ohoopee St
PI No: 0012363
Regional Project Id: HG-1086
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $57,681
Invoiced to Date: $51,158.83
Project Description: Reidsville Woodlawn Terrace
PI No: 0012364
Regional Project Id: HG-1085
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $110,827
Invoiced to Date: $92,841.52
Project Description: Reidsville Smith St
PI No: 0012365
Regional Project Id: HG-1065
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $24,223
Invoiced to Date: $24,007.00
Project Description: Reidsville Memorial Drive Sidewalk
PI No: 0012366
Regional Project Id: HG-1080
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $21,587
Invoiced to Date: $20,841.23
Project Description: Reidsville Nelson St
PI No: 0012367
Regional Project Id: HG-1079
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $23,179
Invoiced to Date: $20,865.31
Project Description: Reidsville McLeod St
PI No: 0012368
Regional Project Id: HG-1069
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $104,621
Invoiced to Date: $103,052.00
Project Description: Reidsville Blount St
PI No: 0012369
Regional Project Id: HG-1067
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $112,100
Invoiced to Date: $110,419.00
Project Description: Reidsville Anderson St
PI No: 0012370
Regional Project Id: HG-1071
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $148,883
Invoiced to Date: $145,388.34
Project Description: Reidsville Chandler Ave
PI No: 0012371
Regional Project Id: HG-1072
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $36,651
Invoiced to Date: $36,101.00
Project Description: Reidsville Church St
PI No: 0012372
Regional Project Id: HG-1074
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $24,743
Invoiced to Date: $24,372.00
Project Description: Reidsville Glenview Dr
PI No: 0012373
Regional Project Id: HG-1094
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Transit
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $19,820
Invoiced to Date: $14,720.50
Project Description: Telfair 5311 Capitial
PI No: 0012374
Regional Project Id: HG-1087
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $216,000
Invoiced to Date: $211,909.00
Project Description: Telfair McRae Milan Rd
PI No: 0012375
Regional Project Id: HG-1089
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $64,000
Invoiced to Date: $62,788.00
Project Description: Telfair Owens Rd
PI No: 0012376
Regional Project Id: HG-1090
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $808,000
Invoiced to Date: $734,280.92
Project Description: Telfair Tom Haley Rd
PI No: 0012377
Regional Project Id: HG-1092
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $352,000
Invoiced to Date: $348,853.00
Project Description: Telfair Fishing Creek Rd
PI No: 0012378
Regional Project Id: HG-1093
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $28,263
Invoiced to Date: $28,010.00
Project Description: Telfair Kinnett and Friendship Connector - Yawn Rd
PI No: 0012379
Regional Project Id: HG-1095
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Transit
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $178,380
Invoiced to Date: $175,815.00
Project Description: Telfair 5311 Operations (Part)
PI No: 0012380
Regional Project Id: HG-1097
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $50,400
Invoiced to Date: $43,305.22
Project Description: Lumber City River St
PI No: 0012381
Regional Project Id: HG-1108
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $12,636.00
Project Description: Lumber City Randall St
PI No: 0012382
Regional Project Id: HG-1100
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $58,800
Invoiced to Date: $58,274.00
Project Description: Lumber City Johnson St
PI No: 0012383
Regional Project Id: HG-1101
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $37,800
Invoiced to Date: $29,047.00
Project Description: Lumber City West Ave
PI No: 0012384
Regional Project Id: HG-1103
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $49,000
Invoiced to Date: $48,562.00
Project Description: Lumber City Broad St
PI No: 0012385
Regional Project Id: HG-1096
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $60,200
Invoiced to Date: $59,662.00
Project Description: Lumber City Central Ave
PI No: 0012386
Regional Project Id: HG-1098
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $63,000
Invoiced to Date: $69,613.00
Project Description: Lumber City Church St
PI No: 0012387
Regional Project Id: HG-1099
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $46,200
Invoiced to Date: $45,787.00
Project Description: Lumber City Virginia Ave
PI No: 0012388
Regional Project Id: HG-1102
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $50,400
Invoiced to Date: $49,948.70
Project Description: Lumber City Pond Rd
PI No: 0012389
Regional Project Id: HG-1107
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $21,000
Invoiced to Date: $19,231.39
Project Description: Lumber City Burns St
PI No: 0012390
Regional Project Id: HG-1105
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $91,000
Invoiced to Date: $84,340.00
Project Description: Lumber City Sand Pit Rd
PI No: 0012391
Regional Project Id: HG-1106
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $84,000
Invoiced to Date: $81,120.50
Project Description: Lumber City E. Railroad St
PI No: 0012392
Regional Project Id: HG-1104
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $21,000
Invoiced to Date: $15,792.00
Project Description: Lumber City Pine St
PI No: 0012393
Regional Project Id: HG-1110
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $11,900
Invoiced to Date: $11,674.00
Project Description: McRae Central Ave
PI No: 0012394
Regional Project Id: HG-1111
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $11,900
Invoiced to Date: $11,674.00
Project Description: McRae Langley Ave
PI No: 0012395
Regional Project Id: HG-1112
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $4,200
Invoiced to Date: $4,120.00
Project Description: McRae Spring Ave
PI No: 0012396
Regional Project Id: HG-1113
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $9,800
Invoiced to Date: $9,614.00
Project Description: McRae Railroad St
PI No: 0012397
Regional Project Id: HG-1114
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $74,200
Invoiced to Date: $72,795.00
Project Description: HG-1135 (Part) McRae Bruce St (West Willow Creek to First Avenue) - (-$8,400)
PI No: 0012398
Regional Project Id: HG-1129
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $5,600
Invoiced to Date: $4,436.40
Project Description: (Part) McRae 2nd Ave Andrew St to Oak St
PI No: 0012399
Regional Project Id: HG-1120
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $63,000
Invoiced to Date: $61,807.00
Project Description: McRae First Ave
PI No: 0012400
Regional Project Id: HG-1121
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $40,600
Invoiced to Date: $39,831.00
Project Description: (Part) McRae 8th Ave (Oak St to Graham St)
PI No: 0012401
Regional Project Id: HG-1122
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $54,939.00
Project Description: McRae Lakeside Ave
PI No: 0012402
Regional Project Id: HG-1123
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $69,374.00
Project Description: McRae Spring Ave
PI No: 0012403
Regional Project Id: HG-1124
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $150,000
Invoiced to Date: $148,659.00
Project Description: McRae Industrial Blvd
PI No: 0012404
Regional Project Id: HG-1125
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $68,600
Invoiced to Date: $67,987.00
Project Description: (Part) McRae Magnolia St (West City Limits to Ellison Ave)
PI No: 0012405
Regional Project Id: HG-1126
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $55,499.00
Project Description: McRae East Ave
PI No: 0012406
Regional Project Id: HG-1127
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $23,800
Invoiced to Date: $23,587.00
Project Description: (Part) McRae Telfair Ave (MLK Blvd to Parsonage St)
PI No: 0012407
Regional Project Id: HG-1128
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $69,374.00
Project Description: McRae College St
PI No: 0012408
Regional Project Id: HG-1129
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $86,800
Invoiced to Date: $86,024.00
Project Description: (Part) McRae 2nd Ave Huckabee St to Willow Creek Lane
PI No: 0012409
Regional Project Id: HG-1131
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $119,000
Invoiced to Date: $117,936.00
Project Description: McRae 1st Ave
PI No: 0012410
Regional Project Id: HG-1132
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $98,000
Invoiced to Date: $85,857.04
Project Description: McRae 5th Ave
PI No: 0012411
Regional Project Id: HG-1133
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $126,000
Invoiced to Date: $157,982.00
Project Description: McRae Graham St
PI No: 0012412
Regional Project Id: HG-1134
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $182,000
Invoiced to Date: $228,197.00
Project Description: McRae Brewton
PI No: 0012413
Regional Project Id: HG-1135
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $5,040
Invoiced to Date: $3,903.27
Project Description: (Part) McRae Bruce (Macville Ave to East Willow Creek Lane)
PI No: 0012414
Regional Project Id: HG-1136
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $154,000
Invoiced to Date: $193,089.00
Project Description: McRae 4th Ave
PI No: 0012415
Regional Project Id: HG-1121
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $22,400
Invoiced to Date: $18,864.40
Project Description: (Part) McRae 8th Ave (Liberty St to Willow Creek Lane)
PI No: 0012416
Regional Project Id: HG-1127
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $104,918
Invoiced to Date: $88,473.47
Project Description: (Part) McRae Telfair Ave (Smith to Willow Creek Lane)
PI No: 0012417
Regional Project Id: HG-1116
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $42,000
Invoiced to Date: $34,654.55
Project Description: McRae Strozier Street
PI No: 0012418
Regional Project Id: HG-1137
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $98,000
Invoiced to Date: $47,919.18
Project Description: Scotland Resurface 4th Ave to 4th Ave Ext
PI No: 0012419
Regional Project Id: HG-1141
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $628,600
Invoiced to Date: $622,980.00
Project Description: Toombs Lyons Center Rd
PI No: 0012420
Regional Project Id: HG-1140
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Pavement Markings
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $279,900
Invoiced to Date: $275,702.00
Project Description: Toombs County wide Striping
PI No: 0012421
Regional Project Id: HG-1147
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Accel / Decel Lanes
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $165,974
Invoiced to Date: $161,901.69
Project Description: Toombs 130 Accel-Decel Lane
PI No: 0012422
Regional Project Id: HG-1145
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $511,000
Invoiced to Date: $506,431.00
Project Description: Toombs Providence Church Rd
PI No: 0012423
Regional Project Id: HG-1146
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $319,200
Invoiced to Date: $316,346.00
Project Description: Toombs Donald Anderson
PI No: 0012424
Regional Project Id: HG-1148
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $214,200
Invoiced to Date: $212,285.00
Project Description: Toombs Five Point Resurfacing
PI No: 0012425
Regional Project Id: HG-1143
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $548,800
Invoiced to Date: $543,893.00
Project Description: Toombs Mt Moriah Church Rd
PI No: 0012426
Regional Project Id: HG-1142
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $845,600
Invoiced to Date: $838,040.00
Project Description: Toombs Marvin Church Rd
PI No: 0012427
Regional Project Id: HG-1149
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,140,000
Invoiced to Date: $963,930.23
Project Description: Toombs Ezra Taylor Rd
PI No: 0012428
Regional Project Id: HG-1144
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $631,929
Invoiced to Date: $626,279.00
Project Description: Toombs New Normantown Rd
PI No: 0012429
Regional Project Id: HG-1150
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $200,000
Invoiced to Date: $196,212.00
Project Description: Lyons South Victory Dr
PI No: 0012430
Regional Project Id: HG-1151
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $200,000
Invoiced to Date: $221,020.11
Project Description: Lyons West Oglethorpe Ave
PI No: 0012431
Regional Project Id: HG-1152
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $201,316
Invoiced to Date: $221,020.06
Project Description: Lyons North Lanier and North Lexington
PI No: 0012432
Regional Project Id: HG-1154
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $1,059,000
Invoiced to Date: $2,048,489.44
Project Description: Lyons SR 292 and Oxley Dr
PI No: 0012433
Regional Project Id: HG-1157
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $1,136,567
Invoiced to Date: $925,560.81
Project Description: Vidalia Mose Coleman Rd
PI No: 0012434
Regional Project Id: HG-1156
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $125,000
Invoiced to Date: $124,941.00
Project Description: Vidalia Michael Collins Dr
PI No: 0012435
Regional Project Id: HG-1159
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $891,445
Invoiced to Date: $891,024.00
Project Description: Vidalia Airport Rd
PI No: 0012436
Regional Project Id: HG-1155
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $1,624,052
Invoiced to Date: $1,624,052.00
Project Description: Vidalia Adams Street
PI No: 0012437
Regional Project Id: HG-1158
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $218,029
Invoiced to Date: $275,392.81
Project Description: Vidalia Pete Phillips Rd
PI No: 0012438
Regional Project Id: HG-1160
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $221,010
Invoiced to Date: $267,778.21
Project Description: Vidalia Brinson Rd
PI No: 0012439
Regional Project Id: HG-1161
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $62,755
Invoiced to Date: $80,488.63
Project Description: Vidalia Lowery Place
PI No: 0012440
Regional Project Id: HG-1162
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $50,120
Invoiced to Date: $64,383.71
Project Description: Vidalia Curry St
PI No: 0012441
Regional Project Id: HG-1163
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $64,002
Invoiced to Date: $59,584.93
Project Description: Vidalia Truman St
PI No: 0012442
Regional Project Id: HG-1164
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $114,975
Invoiced to Date: $146,557.44
Project Description: Vidalia Rudell Rd
PI No: 0012443
Regional Project Id: HG-1165
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $114,975
Invoiced to Date: $145,229.33
Project Description: Vidalia Semco Rd
PI No: 0012444
Regional Project Id: HG-1167
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Railroad Crossings
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $157,500
Invoiced to Date: $148,310.00
Project Description: Vidalia Upgrade Railroad Crossing (Part) (8 crossings)
PI No: 0012445
Regional Project Id: HG-1170
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $157,160
Invoiced to Date: $162,035.07
Project Description: Treutlen Miller Pond Rd (Part - 1.96 miles) (From Soperton City Limits to .4 miles beyond John Deere Rd)
PI No: 0012446
Regional Project Id: HG-1174
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $136,000
Invoiced to Date: $154,510.23
Project Description: Treutlen Lonesome Pine Rd
PI No: 0012447
Regional Project Id: HG-1187
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $312,000
Invoiced to Date: $309,211.00
Project Description: Treutlen Anderson Pond Rd
PI No: 0012448
Regional Project Id: HG-1180
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $224,000
Invoiced to Date: $186,288.70
Project Description: Treutlen Holton Chapel Rd (Part - 2.8 miles) (From SR 56 to Ohoopee Bend Circle)
PI No: 0012449
Regional Project Id: HG-1169
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $80,000
Invoiced to Date: $79,285.00
Project Description: Treutlen Old Dair Rd - Wommack Rd
PI No: 0012450
Regional Project Id: HG-1186
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $188,000
Invoiced to Date: $186,319.00
Project Description: Treutlen Rosemont Church Rd (Part - 2.35 miles) (From SR 199 and go 2.35 miles)
PI No: 0012451
Regional Project Id: HG-1177
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $168,000
Invoiced to Date: $192,242.01
Project Description: Treutlen Ohoopee Bend Rd (2.1 miles) (From SR 86 to Ohoopee Bend Rd. Dead End)
PI No: 0012452
Regional Project Id: HG-1176
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $64,000
Invoiced to Date: $56,270.00
Project Description: Treutlen Deer Run Rd (Part - 0.8 miles) (From Oglethorpe Rd to Holton Chapel Rd)
PI No: 0012453
Regional Project Id: HG-1182
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $112,000
Invoiced to Date: $92,717.00
Project Description: Treutlen Tobacco Trail
PI No: 0012454
Regional Project Id: HG-1178
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $24,000
Invoiced to Date: $45,404.10
Project Description: Treutlen Norristown Rd (Part - 0.3 miles) (3 bad spots of 0.1 mile each from Crooked Run Rd. to SR 171/US 221 at County Line)
PI No: 0012455
Regional Project Id: HG-1181
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $100,000
Invoiced to Date: $74,026.26
Project Description: Treutlen Crooked Run Rd (Part - 1.25 miles, Segment 2) (From begin at Twin Pond Rd and go 1.25 miles)
PI No: 0012456
Regional Project Id: HG-1173
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $80,000
Invoiced to Date: $119,162.00
Project Description: Treutlen Secret Forest Rd
PI No: 0012457
Regional Project Id: HG-1216
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $87,648
Invoiced to Date: $85,988.00
Project Description: Soperton Center Dr
PI No: 0012458
Regional Project Id: HG-1191
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $16,720.98
Project Description: Soperton Varnedo St
PI No: 0012459
Regional Project Id: HG-1232
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $87,648
Invoiced to Date: $85,988.00
Project Description: Soperton Parkway Dr
PI No: 0012460
Regional Project Id: HG-1222
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $91,000
Invoiced to Date: $87,663.30
Project Description: Soperton Belk St
PI No: 0012461
Regional Project Id: HG-1200
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $6,069.68
Project Description: Soperton Robby Lane
PI No: 0012462
Regional Project Id: HG-1217
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $38,552
Invoiced to Date: $41,466.42
Project Description: Soperton Varnedo St
PI No: 0012463
Regional Project Id: HG-1211
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $10,604.45
Project Description: Soperton Roydon Dr
PI No: 0012464
Regional Project Id: HG-1189
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $21,000
Invoiced to Date: $7,344.71
Project Description: Soperton Railroad Avenue Overlay
PI No: 0012465
Regional Project Id: HG-1227
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $38,552
Invoiced to Date: $38,208.00
Project Description: Soperton Westend Dr
PI No: 0012466
Regional Project Id: HG-1225
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $87,648
Invoiced to Date: $86,864.00
Project Description: Soperton Omega St
PI No: 0012467
Regional Project Id: HG-1228
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $38,552
Invoiced to Date: $38,208.00
Project Description: Soperton Straight St
PI No: 0012468
Regional Project Id: HG-1210
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $72,800
Invoiced to Date: $42,406.78
Project Description: Soperton Sessions St
PI No: 0012469
Regional Project Id: HG-1214
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $91,000
Invoiced to Date: $49,431.47
Project Description: Soperton Woodland Dr
PI No: 0012470
Regional Project Id: HG-1223
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $10,004.56
Project Description: Soperton Texas Ave
PI No: 0012471
Regional Project Id: HG-1193
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $25,328.41
Project Description: Soperton Edwin St
PI No: 0012472
Regional Project Id: HG-1208
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $119,000
Invoiced to Date: $100,140.11
Project Description: Soperton Florida Ave
PI No: 0012473
Regional Project Id: HG-1197
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $24,459.80
Project Description: Soperton Canady Ave
PI No: 0012474
Regional Project Id: HG-1192
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $34,687.00
Project Description: Soperton Arch St
PI No: 0012475
Regional Project Id: HG-1226
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $87,648
Invoiced to Date: $116,555.00
Project Description: Soperton Pitus Rd
PI No: 0012476
Regional Project Id: HG-1230
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $38,552
Invoiced to Date: $51,268.00
Project Description: Soperton Alpha Rd
PI No: 0012477
Regional Project Id: HG-1229
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $38,552
Invoiced to Date: $51,268.00
Project Description: Soperton Faith Circle
PI No: 0012478
Regional Project Id: HG-1231
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $59,670
Invoiced to Date: $79,351.00
Project Description: Soperton Flordia Ave Ext
PI No: 0012479
Regional Project Id: HG-1198
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $15,262.00
Project Description: Soperton Kelly St
PI No: 0012480
Regional Project Id: HG-1224
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $87,648
Invoiced to Date: $86,980.29
Project Description: Soperton Highland Dr
PI No: 0012481
Regional Project Id: HG-1196
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $34,687.00
Project Description: Soperton Ivy Circle
PI No: 0012482
Regional Project Id: HG-1199
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $15,262.00
Project Description: Soperton Maple St
PI No: 0012483
Regional Project Id: HG-1219
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $13,216.12
Project Description: Soperton Clover St
PI No: 0012484
Regional Project Id: HG-1194
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $34,687.00
Project Description: Soperton Berry St
PI No: 0012485
Regional Project Id: HG-1195
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $30,407.78
Project Description: Soperton Norman St
PI No: 0012486
Regional Project Id: HG-1245
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $1,000,000
Invoiced to Date: $976,019.90
Project Description: Wayne Widen Rayonier Rd
PI No: 0012487
Regional Project Id: HG-1248
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Raise the Grade
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $275,000
Invoiced to Date: $274,427.86
Project Description: Wayne Gardi-Broadhurst Rd
PI No: 0012488
Regional Project Id: HG-1243
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $900,000
Invoiced to Date: $361,002.50
Project Description: Wayne Replace Bridge on Walter Griffis at Goose Creek
PI No: 0012489
Regional Project Id: HG-1234
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $2,500,000
Invoiced to Date: $2,746,704.61
Project Description: WayneReg Reclamation and Widening Broadhurst Rd West
PI No: 0012490
Regional Project Id: HG-1255
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Railroad Crossings
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $33,000
Invoiced to Date: $32,704.20
Project Description: Wayne Railroad Crossing at Louisiana Rd
PI No: 0012491
Regional Project Id: HG-1256
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Railroad Crossings
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $33,000
Invoiced to Date: $10,531.96
Project Description: Wayne Railroad Crossing at Ed Harrell Rd
PI No: 0012492
Regional Project Id: HG-1254
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Railroad Crossings
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $33,000
Invoiced to Date: $24,718.52
Project Description: Wayne Railroad Crossing at Slover Rd
PI No: 0012493
Regional Project Id: HG-1258
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $103,400
Invoiced to Date: $102,476.00
Project Description: Wayne Whaley Rd
PI No: 0012494
Regional Project Id: HG-1246
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $409,400
Invoiced to Date: $301,515.09
Project Description: Wayne Collins Loop Rd
PI No: 0012495
Regional Project Id: HG-1241
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $600,000
Invoiced to Date: $344,743.38
Project Description: Wayne Replace Bridge on Holmesville Rd
PI No: 0012496
Regional Project Id: HG-1242
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $533,000
Invoiced to Date: $528,235.00
Project Description: Wayne US 341 Industrial Pk Rd
PI No: 0012497
Regional Project Id: HG-1251
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $49,529
Invoiced to Date: $60,259.76
Project Description: Wayne Linden Bluff Rd
PI No: 0012498
Regional Project Id: HG-1252
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $92,000
Invoiced to Date: $115,352.00
Project Description: Wayne Killingsworth Road
PI No: 0012499
Regional Project Id: HG-1253
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $330,000
Invoiced to Date: $413,764.00
Project Description: Wayne Holmesville Rd Resurfacing
PI No: 0012500
Regional Project Id: HG-1240
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $828,400
Invoiced to Date: $795,459.05
Project Description: Wayne Holmesville Rd Construction (from Odum Rd South 2.5 miles)
PI No: 0012501
Regional Project Id: HG-1280
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $59,250
Invoiced to Date: $32,631.76
Project Description: Jesup Cedar St
PI No: 0012502
Regional Project Id: HG-1279
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $239,250
Invoiced to Date: $205,398.36
Project Description: Jesup West Orange St Mill/Resurface
PI No: 0012503
Regional Project Id: HG-1267
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $900,000
Invoiced to Date: $932,920.82
Project Description: Jesup West Orange St/US 84 Intersection
PI No: 0012504
Regional Project Id: HG-1281
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $900,000
Invoiced to Date: $406,374.00
Project Description: Jesup South Macon St
PI No: 0012505
Regional Project Id: HG-1266
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $900,000
Invoiced to Date: $1,302,745.95
Project Description: Jesup West Cherry St
PI No: 0012506
Regional Project Id: HG-1282
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $154,200
Invoiced to Date: $116,259.96
Project Description: Jesup East Plum St
PI No: 0012507
Regional Project Id: HG-1274
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $148,600
Invoiced to Date: $136,289.50
Project Description: Jesup Eleventh St
PI No: 0012508
Regional Project Id: HG-1278
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $60,000
Invoiced to Date: $35,152.00
Project Description: Jesup Robert Hunter Circle
PI No: 0012509
Regional Project Id: HG-1276
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $16,400
Invoiced to Date: $14,014.00
Project Description: Jesup Hunter St
PI No: 0012510
Regional Project Id: HG-1265
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $900,000
Invoiced to Date: $921,707.70
Project Description: Jesup West Pine St
PI No: 0012511
Regional Project Id: HG-1271
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $136,000
Invoiced to Date: $74,782.50
Project Description: Jesup Bay Acres Rd Sidewalk
PI No: 0012512
Regional Project Id: HG-1270
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $41,500
Invoiced to Date: $41,128.00
Project Description: Jesup New East Plum St Sidewalk
PI No: 0012513
Regional Project Id: HG-1268
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $52,000
Invoiced to Date: $50,909.00
Project Description: Jesup New US 301 S Sidewalk
PI No: 0012514
Regional Project Id: HG-1284
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $95,200
Invoiced to Date: $68,338.41
Project Description: Odum North Church St
PI No: 0012515
Regional Project Id: HG-1285
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,400
Invoiced to Date: $10,647.05
Project Description: Odum Ivey St
PI No: 0012516
Regional Project Id: HG-1290
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $17,920
Invoiced to Date: $11,573.97
Project Description: Odum Tillman St - Railroad to Hires
PI No: 0012517
Regional Project Id: HG-1286
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $74,082
Invoiced to Date: $73,062.18
Project Description: Odum Tillman St - (Part) (Main St. to Roberson Rd.)
PI No: 0012518
Regional Project Id: HG-1292
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: SrfTrt
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $376,000
Invoiced to Date: $315,724.13
Project Description: Wheeler Snowhill Baptist Church Rd - CR 178 (Part - 4.7 miles) (Begin at CR 40 and end at SR 46)
PI No: 0012520
Regional Project Id: HG-1294
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $277,500
Invoiced to Date: $701,028.00
Project Description: Wheeler Mt Olivet Church Rd Bridge
PI No: 0012522
Regional Project Id: HG-1296
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $154,000
Invoiced to Date: $136,560.30
Project Description: Alamo Broad St
PI No: 0012523
Regional Project Id: HG-1297
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $316,800
Invoiced to Date: $210,815.39
Project Description: Alamo Lucille Ave Sidewalk
PI No: 0012524
Regional Project Id: HG-1298
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $84,000
Invoiced to Date: $93,658.80
Project Description: Alamo Railroad St
PI No: 0012525
Regional Project Id: HG-1299
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $28,000
Invoiced to Date: $28,182.30
Project Description: Alamo Kent St
PI No: 0012526
Regional Project Id: HG-1300
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $39,534.76
Project Description: Alamo Second St
PI No: 0012527
Regional Project Id: HG-1301
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $61,060.00
Project Description: Alamo West Railroad
PI No: 0012528
Regional Project Id: HG-1302
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $14,000
Invoiced to Date: $23,848.00
Project Description: Alamo Snowhill Rd
PI No: 0012529
Regional Project Id: HG-1303
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $56,000
Invoiced to Date: $41,243.13
Project Description: Glenwood SW Third Ave
PI No: 0012530
Regional Project Id: HG-1304
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $63,000
Invoiced to Date: $46,399.16
Project Description: Glenwood N 5th St
PI No: 0012531
Regional Project Id: HG-1312
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $41,464.00
Project Description: Glenwood N 5th St
PI No: 0012532
Regional Project Id: HG-1310
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $72,000
Invoiced to Date: $70,661.00
Project Description: Glenwood N First St
PI No: 0012533
Regional Project Id: HG-1306
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $27,166.00
Project Description: Glenwood West 4th Ave and West 1st Ave (Part) (Only West 4th Ave)
PI No: 0012534
Regional Project Id: HG-1305
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $56,417.00
Project Description: Glenwood West 6th and 5th Ave
PI No: 0012535
Regional Project Id: HG-1308
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $29,638
Invoiced to Date: $14,560.00
Project Description: Glenwood S 4th St and N 4th St
PI No: 0012536
Regional Project Id: HG-1313
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $177,216
Invoiced to Date: $165,193.15
Project Description: Wilcox Mount Olive Rd
PI No: 0012537
Regional Project Id: HG-1314
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $32,216
Invoiced to Date: $31,928.00
Project Description: Wilcox Troutman Rd
PI No: 0012538
Regional Project Id: HG-1315
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $150,000
Invoiced to Date: $147,817.20
Project Description: Wilcox Thistle Rd
PI No: 0012539
Regional Project Id: HG-1321
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $390,000
Invoiced to Date: $386,473.44
Project Description: Wilcox Statham Shoals Rd
PI No: 0012540
Regional Project Id: HG-1322
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $450,000
Invoiced to Date: $445,943.74
Project Description: Wilcox Walker Rd
PI No: 0012541
Regional Project Id: HG-1320
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $154,000
Invoiced to Date: $152,623.00
Project Description: Wilcox Lebanon Rd
PI No: 0012542
Regional Project Id: HG-1348
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $39,879
Invoiced to Date: $29,552.18
Project Description: Abbeville E Neapolis St
PI No: 0012543
Regional Project Id: HG-1337
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $70,511
Invoiced to Date: $69,880.00
Project Description: Abbeville Palm Dr
PI No: 0012544
Regional Project Id: HG-1327
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $29,830
Invoiced to Date: $26,214.29
Project Description: Abbeville Bowen St
PI No: 0012545
Regional Project Id: HG-1341
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $43,193
Invoiced to Date: $31,595.28
Project Description: Abbeville Bell St
PI No: 0012546
Regional Project Id: HG-1331
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $20,947
Invoiced to Date: $15,851.97
Project Description: Abbeville Isabella St
PI No: 0012547
Regional Project Id: HG-1330
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $9,148
Invoiced to Date: $13,544.97
Project Description: Abbeville W Ocmulgee St
PI No: 0012548
Regional Project Id: HG-1329
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $50,856
Invoiced to Date: $67,321.00
Project Description: Abbeville Wilson Rd
PI No: 0012549
Regional Project Id: HG-1338
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $36,061
Invoiced to Date: $47,736.00
Project Description: Abbeville West Neopolis
PI No: 0012550
Regional Project Id: HG-1336
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $11,826
Invoiced to Date: $11,721.00
Project Description: Abbeville East Monroe
PI No: 0012551
Regional Project Id: HG-1345
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $30,652
Invoiced to Date: $30,378.00
Project Description: Abbeville Reid St
PI No: 0012552
Regional Project Id: HG-1342
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $15,485
Invoiced to Date: $15,347.00
Project Description: Abbeville Riverside Dr
PI No: 0012553
Regional Project Id: HG-1343
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $26,886
Invoiced to Date: $26,646.00
Project Description: Abbeville Barnes St
PI No: 0012554
Regional Project Id: HG-1346
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $39,110
Invoiced to Date: $52,009.00
Project Description: Abbeville W Neapolis St
PI No: 0012555
Regional Project Id: HG-1339
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $32,945
Invoiced to Date: $32,651.00
Project Description: Abbeville West Monroe
PI No: 0012556
Regional Project Id: HG-1334
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $43,591
Invoiced to Date: $57,704.00
Project Description: Abbeville Depot St
PI No: 0012557
Regional Project Id: HG-1340
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,455
Invoiced to Date: $16,000.00
Project Description: Abbeville Church St
PI No: 0012558
Regional Project Id: HG-1328
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $59,527
Invoiced to Date: $58,995.00
Project Description: Abbeville Simon Keen Rd
PI No: 0012559
Regional Project Id: HG-1326
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $6,841
Invoiced to Date: $11,800.00
Project Description: Abbeville College St
PI No: 0012560
Regional Project Id: HG-1335
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $59,792
Invoiced to Date: $79,150.00
Project Description: Abbeville College St Seg 2
PI No: 0012561
Regional Project Id: HG-1347
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $13,098
Invoiced to Date: $20,700.00
Project Description: Abbeville Sibbie Rd
PI No: 0012562
Regional Project Id: HG-1344
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $11,402
Invoiced to Date: $19,100.00
Project Description: Abbeville Burkett St
PI No: 0012563
Regional Project Id: HG-1333
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $7,822
Invoiced to Date: $19,100.00
Project Description: Abbeville West Park Ave
PI No: 0012564
Regional Project Id: HG-1332
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $12,913
Invoiced to Date: $18,100.00
Project Description: Abbeville East Park Ave
PI No: 0012565
Regional Project Id: HG-1351
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $110,000
Invoiced to Date: $28,485.84
Project Description: Rochelle Bessie Ave
PI No: 0012566
Regional Project Id: HG-1352
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $70,000
Invoiced to Date: $32,558.75
Project Description: Rochelle Ruben St
PI No: 0012567
Regional Project Id: HG-1353
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $110,000
Invoiced to Date: $25,782.88
Project Description: Rochelle Jessie St
PI No: 0012568
Regional Project Id: HG-1355
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $110,000
Invoiced to Date: $37,849.90
Project Description: Rochelle Ginhouse St
PI No: 0012569
Regional Project Id: HG-1356
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $36,101.13
Project Description: Rochelle Pine St
PI No: 0012570
Regional Project Id: HG-1357
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $35,000
Invoiced to Date: $18,533.62
Project Description: Rochelle Mill St
PI No: 0014178
Regional Project Id: HG-1295
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $200,000
Invoiced to Date: $200,000.00
Project Description: Wheeler Ochwalkee Creek Bridge
PI No: 221975-
Regional Project Id: RC09-000013
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $8,515,626
Invoiced to Date: $1,703,125.00
Project Description: SR 341/Northwest Eastman Bypass from SR 27/US 341 Northeast to SR 87/US 23
PI No: 222410-
Regional Project Id: RC09-000014
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $33,640,954
Invoiced to Date: $5,189,233.70
Project Description: SR 87/US 23 Widening from CR 8/Log Cabin Rd to South of SR 257
PI No: 270724-
Regional Project Id: HG-0777
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $400,000
Invoiced to Date: $396,424.00
Project Description: Laurens Chappel Mill Bridge
PI No: 522220-
Regional Project Id: RC09-000077
County: Toombs
Congressional District:
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $101,927,957
Invoiced to Date: $32,811,807.64
Project Description: Widening of U.S. 1/SR 4 from North of Williams Creek (near Appling line) to Green Oak Road, 522190, 522180
PI No: 532342-
Regional Project Id: HG-1291
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Bridge
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $562,500
Invoiced to Date: $516,180.63
Project Description: Wheeler Alligator Creek Bridge
PI No: 0001812
Regional Project Id: RC08-000060
County: Muscogee
Congressional District: 3
Regional Commission: River Valley
Project Type: Passing Lanes
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $17,690,438
Invoiced to Date: $10,362,032.72
Project Description: SR 219 Passing Lanes from Luther Land Bridge to Happy Hollow Road Improvements
PI No: 0006446
Regional Project Id: RC08-000021
County: Harris
Congressional District: 3
Regional Commission: River Valley
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $40,000,000
Invoiced to Date: $14,020,999.34
Project Description: SR 1/US 27 Widening from Turnberry Lane/Muscogee to SR 315
PI No: 0007042
Regional Project Id: RC08-000035
County: Macon
Congressional District: 2
Regional Commission: River Valley
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $5,500,000
Invoiced to Date: $2,190,806.71
Project Description: Replace the State Route 128 Bridge over Whitewater Creek
PI No: 0011428
Regional Project Id: RC08-000017
County: Dooly
Congressional District: 2
Regional Commission: River Valley
Project Type: Passing Lanes
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $6,930,000
Invoiced to Date: $4,261,316.04
Project Description: US 41 - Passing Lanes and Traffic Signals
PI No: 0011429
Regional Project Id: RC08-000019
County: Harris
Congressional District: 3
Regional Commission: River Valley
Project Type: Passing Lanes
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $2,950,973
Invoiced to Date: $2,809,906.92
Project Description: SR 1/US 27 Northbound Passing Lane
PI No: 0011430
Regional Project Id: RC08-000022
County: Harris
Congressional District: 3
Regional Commission: River Valley
Project Type: Passing Lanes
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $4,479,598
Invoiced to Date: $4,586,098.46
Project Description: SR 103 passing lane from MP 11.8 to Troup County Line
PI No: 0011431
Regional Project Id: RC08-000032
County: Macon
Congressional District: 2
Regional Commission: River Valley
Project Type: Passing Lanes
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $6,875,000
Invoiced to Date: $5,337,715.39
Project Description: Passing Lanes for State Route 224
PI No: 0011432
Regional Project Id: RC08-000045
County: Macon
Congressional District: 2
Regional Commission: River Valley
Project Type: Resurfacing & Maintenance
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $209,424
Invoiced to Date: $191,874.00
Project Description: Widening of East Railroad Street
PI No: 0011433
Regional Project Id: RC08-000054
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Bike-Ped Facility
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $10,000,000
Invoiced to Date: $10,002,605.18
Project Description: Columbus River Walk
PI No: 0011434
Regional Project Id: RC08-000055
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Roadway Project
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $58,269,412
Invoiced to Date: $41,775,198.16
Project Description: Cusseta and Old Cusseta Road Improvements
PI No: 0011435
Regional Project Id: RC08-000056
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Transit
Band: Multi- (TIA 1)
Original Project Budgeted: $22,400,000
Invoiced to Date: $19,219,056.86
Project Description: Intercity Express Bus Park-N-Ride Service
PI No: 0011436
Regional Project Id: RC08-000057
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Realignment
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $40,000,000
Invoiced to Date: $19,543,341.09
Project Description: Intersection Improvements along Buena Vista Road (Columbus Spider Web Network)
PI No: 0011437
Regional Project Id: RC08-000062
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Interchange
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $20,000,000
Invoiced to Date: $17,613,393.12
Project Description: US 27/Custer Road Interchange Reconstruction/Modification at Fort Benning
PI No: 0011438
Regional Project Id: RC08-000084
County: Sumter
Congressional District: 2
Regional Commission: River Valley
Project Type: Roadway Project
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $15,000,000
Invoiced to Date: $10,474,418.83
Project Description: Improvements to South Georgia Tech Parkway
PI No: 0011439
Regional Project Id: RC08-000091
County: Sumter
Congressional District: 2
Regional Commission: River Valley
Project Type: Roadway Project
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $10,000,000
Invoiced to Date: $9,736,488.59
Project Description: District Line Road Improvements
PI No: 0011440
Regional Project Id: RC08-000097
County: Talbot
Congressional District: 2
Regional Commission: River Valley
Project Type: Roadway Project
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $3,325,000
Invoiced to Date: $2,184,435.47
Project Description: Pobiddy Rd Resurfacing and Improvements
PI No: 0011441
Regional Project Id: RC08-000102
County: Taylor
Congressional District: 2
Regional Commission: River Valley
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $500,000
Invoiced to Date: $291,662.00
Project Description: Bickley Rd. at Patsiligia Creek Tributary Bridge Replacement
PI No: 0012577
Regional Project Id: RC08-000052
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Interchange
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $47,670,000
Invoiced to Date: $42,513,736.31
Project Description: Buena Vista Road Interchange
PI No: 0012578
Regional Project Id: RC08-000012
County: Crisp
Congressional District: 2
Regional Commission: River Valley
Project Type: Bridge
Band: 2:2016 to 2019 (TIA 1)
Original Project Budgeted: $30,000,000
Invoiced to Date: $21,644,836.96
Project Description: US Hwy 280 Bridge Reconstruction over Lake Blackshear
PI No: 0012579
Regional Project Id: RC08-000058
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Multi-use Trail
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $3,500,000
Invoiced to Date: $3,490,773.43
Project Description: South Lumpkin Multi-Use Facility
PI No: 422235-
Regional Project Id: RC08-000068
County: Randolph
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $31,742,135
Invoiced to Date: $28,939,352.56
Project Description: SR 1/US 27 Widening from CR 153/Carnegie Vilulah Rd to Cuthbert Bypass
PI No: 422470-
Regional Project Id: RC08-000010
County: Crisp
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 3:2020 to 2022 (TIA 1)
Original Project Budgeted: $32,899,573
Invoiced to Date: $27,366,027.86
Project Description: U.S. 280 Widening from Crisp County Line to SR 300 Connector
PI No: 431530-
Regional Project Id: RC08-000065
County: Randolph
Congressional District: 2
Regional Commission: River Valley
Project Type: Bridge
Band: 1:2013 to 2015 (TIA 1)
Original Project Budgeted: $813,177
Invoiced to Date: $991,568.22
Project Description: Bridge Replacement SR 1/US 27 @ Ga/Ala RR
PI No: 0000821
Regional Project Id: SGRC-040
County: Charlton
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Widening
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $8,635,000
Invoiced to Date: $546,136.80
Project Description: SR 40 from SR40 Conn to 0.36 mi east of May Bluff Rd
PI No: 0010297
Regional Project Id: SGRC-109
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Interchange
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $21,445,000
Invoiced to Date: $19,506,062.95
Project Description: I-75 @ SR 31 - Phase II (Exit 11)
PI No: 0010318
Regional Project Id: SGRC-138
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Interchange
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $20,905,000
Invoiced to Date: $1,389,675.79
Project Description: I-75 @ CR421/Chula Brookfield Rd - Phase II (Exit 69)
PI No: 0013605
Regional Project Id: SGRC-152
County: Ware
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $8,650,000
Invoiced to Date: $2,566,524.06
Project Description: US 84 Bridge over Satilla River
PI No: 0015536
Regional Project Id: SGRC-028
County: Brantley
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $5,900,000
Invoiced to Date: $200,000.00
Project Description: SR520/US82 @Satilla River Overflow 14 mi east of Hoboken
PI No: 0016170
Regional Project Id: SGRC-001
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,188,000
Invoiced to Date: $645,502.13
Project Description: US 441 Sidewalk Improvements
PI No: 0016171
Regional Project Id: SGRC-002
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,359,000
Invoiced to Date: $2,044,550.67
Project Description: Cogdell Road Widen and Resurface
PI No: 0016172
Regional Project Id: SGRC-003
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,085,000
Invoiced to Date: $664,412.65
Project Description: Springhead Road Widen and Resurface Phase 1
PI No: 0016173
Regional Project Id: SGRC-004
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,253,000
Invoiced to Date: $1,295,702.21
Project Description: Springhead Road Widen and Resurface Phase 2
PI No: 0016174
Regional Project Id: SGRC-005
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $885,000
Invoiced to Date: $354,037.46
Project Description: Springhead Road Widen and Resurface Phase 3
PI No: 0016175
Regional Project Id: SGRC-006
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $103,000
Invoiced to Date: $64,528.83
Project Description: Bostwick Street Paving
PI No: 0016176
Regional Project Id: SGRC-007
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $77,000
Invoiced to Date: $50,302.62
Project Description: McCranie Ave Paving
PI No: 0016177
Regional Project Id: SGRC-008
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $200,000
Invoiced to Date: $120,929.54
Project Description: Florida Road Paving
PI No: 0016178
Regional Project Id: SGRC-009
County: Atkinson
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $72,000
Invoiced to Date: $46,109.50
Project Description: School Road Paving
PI No: 0016179
Regional Project Id: SGRC-010
County: Bacon
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $722,000
Invoiced to Date: $535,395.02
Project Description: Industrial Park Roads Resurfacing Bundle
PI No: 0016180
Regional Project Id: SGRC-011
County: Bacon
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $292,800
Invoiced to Date: $215,671.11
Project Description: Douglas Street Resurfacing
PI No: 0016181
Regional Project Id: SGRC-012
County: Bacon
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $3,000,000
Invoiced to Date: $2,031,248.63
Project Description: Johnson Lake Road Widening and Safety Improvements
PI No: 0016182
Regional Project Id: SGRC-013
County: Bacon
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Passing Lanes
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $4,536,000
Invoiced to Date: $1,082,572.06
Project Description: SR 32 Passing Lanes Between Alma to Douglas
PI No: 0016183
Regional Project Id: SGRC-014
County: Bacon
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $620,100
Invoiced to Date: $504,004.60
Project Description: Corinth Church Road Resurfacing
PI No: 0016184
Regional Project Id: SGRC-015
County: Bacon
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $534,000
Invoiced to Date: $424,267.37
Project Description: Ten Mile Church Road Resurfacing
PI No: 0016185
Regional Project Id: SGRC-016
County: Bacon
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $389,687
Invoiced to Date: $241,340.26
Project Description: Cumberland Road Resurfacing
PI No: 0016186
Regional Project Id: SGRC-017
County: Ben Hill
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $1,500,000
Invoiced to Date: $57,960.00
Project Description: Bethlehem Church Road Bridge at House Creek Bridge Replacement
PI No: 0016187
Regional Project Id: SGRC-018
County: Ben Hill
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $1,000,000
Invoiced to Date: $44,640.00
Project Description: Bethlehem Church Road Bridge at Otter Creek Bridge Replacement
PI No: 0016188
Regional Project Id: SGRC-019
County: Ben Hill
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Realignment
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $5,913,200
Invoiced to Date: $1,371,835.46
Project Description: Peachtree Road Corridor Realigning, Widening, and Intersection Improvements
PI No: 0016189
Regional Project Id: SGRC-020
County: Ben Hill
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $688,300
Invoiced to Date: $936,082.41
Project Description: Evergreen Road Resurfacing - Ben Hill
PI No: 0016190
Regional Project Id: SGRC-021
County: Ben Hill
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $5,165,192
Invoiced to Date: $339,424.92
Project Description: Fitzgerald Perimeter Roads Improvements (Widen, Resurface, C/G)
PI No: 0016191
Regional Project Id: SGRC-022
County: Ben Hill
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $415,400
Invoiced to Date: $338,762.10
Project Description: Appomattox Road Resurfacing
PI No: 0016192
Regional Project Id: SGRC-023
County: Ben Hill
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $523,500
Invoiced to Date: $470,133.59
Project Description: Evergreen Road Resurfacing - Fitzgerald
PI No: 0016193
Regional Project Id: SGRC-024
County: Berrien
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,645,000
Invoiced to Date: $1,479,670.38
Project Description: West Lenox Road Widen and Resurface
PI No: 0016194
Regional Project Id: SGRC-025
County: Berrien
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,610,000
Invoiced to Date: $1,352,752.03
Project Description: Lenox-Alapaha Highway Widen and Resurface
PI No: 0016195
Regional Project Id: SGRC-026
County: Berrien
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $686,300
Invoiced to Date: $685,079.83
Project Description: Coy Hancock Road Resurfacing
PI No: 0016196
Regional Project Id: SGRC-027
County: Berrien
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,513,000
Invoiced to Date: $2,447,538.58
Project Description: Garner Road Widen and Resurface
PI No: 0016197
Regional Project Id: SGRC-029
County: Brantley
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $87,900
Invoiced to Date: $87,523.25
Project Description: Roberson Street Widen and Resurface
PI No: 0016198
Regional Project Id: SGRC-030
County: Brantley
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $367,317
Invoiced to Date: $319,022.35
Project Description: Cherry Street Resurfacing
PI No: 0016199
Regional Project Id: SGRC-031
County: Brantley
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $200,000
Invoiced to Date: $171,206.50
Project Description: Velie Street Paving
PI No: 0016200
Regional Project Id: SGRC-032
County: Brantley
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $52,000
Invoiced to Date: $46,487.27
Project Description: Cannon Street Resurfacing
PI No: 0016201
Regional Project Id: SGRC-033
County: Brooks
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $4,000,000
Invoiced to Date: $3,980,139.96
Project Description: DeVane Road Bridge Replacement, Widen and Resurface
PI No: 0016202
Regional Project Id: SGRC-034
County: Brooks
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,281,900
Invoiced to Date: $2,315,645.34
Project Description: Webster Road Sidewalks and Drainage Improvements
PI No: 0016203
Regional Project Id: SGRC-035
County: Brooks
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $399,800
Invoiced to Date: $569,921.75
Project Description: Barwick Road Sidewalks and Drainage Improvements
PI No: 0016204
Regional Project Id: SGRC-036
County: Brooks
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $644,500
Invoiced to Date: $811,885.94
Project Description: N. Highland Street Sidewalks and Drainage Improvements
PI No: 0016205
Regional Project Id: SGRC-037
County: Brooks
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,040,000
Invoiced to Date: $1,014,561.26
Project Description: N. MLK Street Sidewalks
PI No: 0016206
Regional Project Id: SGRC-038
County: Brooks
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $556,400
Invoiced to Date: $473,227.33
Project Description: S. Court Street Sidewalk
PI No: 0016207
Regional Project Id: SGRC-039
County: Charlton
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,947,200
Invoiced to Date: $1,910,542.22
Project Description: River Road Resurfacing
PI No: 0016208
Regional Project Id: SGRC-041
County: Charlton
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $250,000
Invoiced to Date: $249,524.46
Project Description: Tower Street Resurfacing and Drainage Improvements
PI No: 0016209
Regional Project Id: SGRC-042
County: Charlton
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $273,467
Invoiced to Date: $229,257.59
Project Description: Tower Street Paving and Drainage Improvements
PI No: 0016210
Regional Project Id: SGRC-043
County: Charlton
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $500,000
Invoiced to Date: $500,000.00
Project Description: Homeland Park Road Bridge Replacement
PI No: 0016211
Regional Project Id: SGRC-044
County: Charlton
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $150,000
Invoiced to Date: $162,213.94
Project Description: Bowery Lane Widening and Resurfacing
PI No: 0016212
Regional Project Id: SGRC-045
County: Charlton
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $161,000
Invoiced to Date: $169,577.33
Project Description: Broadway Resurfacing
PI No: 0016213
Regional Project Id: SGRC-046
County: Charlton
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $120,600
Invoiced to Date: $100,560.35
Project Description: Paxton Road Resurfacing
PI No: 0016214
Regional Project Id: SGRC-047
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $300,000
Invoiced to Date: $260,008.59
Project Description: Oak Lane Resurfacing
PI No: 0016215
Regional Project Id: SGRC-048
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $3,000,000
Invoiced to Date: $639,841.14
Project Description: Homerville Bypass Resurfacing, Bridge Replacement and Other Improvements
PI No: 0016216
Regional Project Id: SGRC-050
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,161,000
Invoiced to Date: $1,511,125.69
Project Description: Frank Sessoms Memorial Hwy/Cogdell Hwy Resurfacing
PI No: 0016217
Regional Project Id: SGRC-051
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $319,100
Invoiced to Date: $391,054.21
Project Description: Cogdell Hwy/Sandy Bottom Road Resurfacing
PI No: 0016218
Regional Project Id: SGRC-052
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $53,700
Invoiced to Date: $49,463.00
Project Description: Lightsey Street Resurfacing
PI No: 0016219
Regional Project Id: SGRC-053
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $65,400
Invoiced to Date: $56,330.00
Project Description: Mill Street Resurfacing
PI No: 0016220
Regional Project Id: SGRC-054
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $20,541
Invoiced to Date: $15,718.49
Project Description: Peach Street Resurfacing
PI No: 0016221
Regional Project Id: SGRC-055
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $94,900
Invoiced to Date: $82,677.89
Project Description: Elna Street Resurfacing
PI No: 0016222
Regional Project Id: SGRC-056
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $21,000
Invoiced to Date: $15,451.44
Project Description: Wheeler Street Resurfacing
PI No: 0016223
Regional Project Id: SGRC-057
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Airport
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $18,000
Invoiced to Date: $19,319.00
Project Description: Beacon Light Replacement at Homerville Airport
PI No: 0016224
Regional Project Id: SGRC-058
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $70,600
Invoiced to Date: $58,555.18
Project Description: Virginia Avenue Resurfacing
PI No: 0016225
Regional Project Id: SGRC-059
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $60,000
Invoiced to Date: $59,997.21
Project Description: Wiregrass Street Resurfacing
PI No: 0016226
Regional Project Id: SGRC-060
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $58,800
Invoiced to Date: $51,592.94
Project Description: Magnolia Street Resurfacing
PI No: 0016227
Regional Project Id: SGRC-061
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $19,257
Invoiced to Date: $17,499.63
Project Description: Orange Street Resurfacing
PI No: 0016228
Regional Project Id: SGRC-062
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $32,700
Invoiced to Date: $5,514.00
Project Description: Dovie Lane/Wiregrass Street Ext. Resurfacing
PI No: 0016229
Regional Project Id: SGRC-063
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $100,900
Invoiced to Date: $60,579.85
Project Description: Reddick Street Resurfacing
PI No: 0016230
Regional Project Id: SGRC-064
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $68,900
Invoiced to Date: $45,250.47
Project Description: Brown Street Resurfacing
PI No: 0016231
Regional Project Id: SGRC-065
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $57,700
Invoiced to Date: $39,190.55
Project Description: Tomlinson Street Resurfacing
PI No: 0016232
Regional Project Id: SGRC-066
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $76,000
Invoiced to Date: $75,919.02
Project Description: Old Pearson Road Resurfacing
PI No: 0016233
Regional Project Id: SGRC-067
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $18,100
Invoiced to Date: $17,903.16
Project Description: Battle Street Resurfacing
PI No: 0016234
Regional Project Id: SGRC-070
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $18,100
Invoiced to Date: $11,095.37
Project Description: Gaskins Street Resurfacing
PI No: 0016235
Regional Project Id: SGRC-071
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,798,000
Invoiced to Date: $586,994.80
Project Description: Bud Hutcheson Road Paving
PI No: 0016236
Regional Project Id: SGRC-073
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $900,000
Invoiced to Date: $488,796.14
Project Description: Harvey Vickers Road Widening and Resurface
PI No: 0016237
Regional Project Id: SGRC-074
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,687,000
Invoiced to Date: $1,288,006.95
Project Description: Rebecca S Waldron Road Widen and Resurface
PI No: 0016238
Regional Project Id: SGRC-075
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $350,000
Invoiced to Date: $334,273.98
Project Description: Wendell Sears Road Widen and Resurface
PI No: 0016239
Regional Project Id: SGRC-076
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $615,313
Invoiced to Date: $531,302.69
Project Description: Wray Road Widen and Resurface
PI No: 0016240
Regional Project Id: SGRC-077
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Passing Lanes
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $8,428,000
Invoiced to Date: $1,379,301.55
Project Description: SR 158 Passing Lanes in Coffee County
PI No: 0016241
Regional Project Id: SGRC-078
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $3,850,000
Invoiced to Date: $1,645,977.23
Project Description: Hwy 149/Youngie Fussell Road/Bridgetown Road Widen and Resurface
PI No: 0016242
Regional Project Id: SGRC-079
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,456,000
Invoiced to Date: $1,038,251.49
Project Description: Sinkhole Road Widen and Resurface
PI No: 0016243
Regional Project Id: SGRC-080
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $950,000
Invoiced to Date: $605,188.04
Project Description: Warren Carter Road/Hillcrest Road Widen and Resurface
PI No: 0016244
Regional Project Id: SGRC-081
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $1,341,800
Invoiced to Date: $45,176.32
Project Description: McDonald Road Sidewalk and Drainage Improvements
PI No: 0016245
Regional Project Id: SGRC-082
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $657,100
Invoiced to Date: $957,396.27
Project Description: S. Gaskin Avenue Sidewalk and Drainage Improvements
PI No: 0016246
Regional Project Id: SGRC-083
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $2,846,200
Invoiced to Date: $53,014.40
Project Description: Chester Avenue Sidewalk and Drainage (Culvert) Improvements
PI No: 0016247
Regional Project Id: SGRC-084
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $560,200
Invoiced to Date: $17,037.00
Project Description: West Green Hwy (SR 135/US 221) Sidewalk Improvements
PI No: 0016248
Regional Project Id: SGRC-086
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $674,400
Invoiced to Date: $592,483.87
Project Description: Lupo Lane Sidewalk and Drainage Improvements
PI No: 0016249
Regional Project Id: SGRC-087
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $694,600
Invoiced to Date: $632,977.11
Project Description: Baker Hwy, East (SR 158) Sidewalk Improvements
PI No: 0016250
Regional Project Id: SGRC-088
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Sidewalks
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $433,900
Invoiced to Date: $38,614.80
Project Description: West Walker Street Sidewalk Improvements
PI No: 0016251
Regional Project Id: SGRC-089
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $150,000
Invoiced to Date: $21,134.70
Project Description: Road Improvements at Douglas Municipal Airport
PI No: 0016252
Regional Project Id: SGRC-090
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $231,500
Invoiced to Date: $268,417.47
Project Description: N. Liberty Street Resurfacing
PI No: 0016253
Regional Project Id: SGRC-091
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $3,312,000
Invoiced to Date: $4,251,408.31
Project Description: Alabama Road Truck Route Improvements
PI No: 0016254
Regional Project Id: SGRC-092
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $4,900,000
Invoiced to Date: $0.00
Project Description: Tillman Road Bypass Phase 3 Improvements
PI No: 0016255
Regional Project Id: SGRC-093
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Turn Lanes
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $500,000
Invoiced to Date: $129,268.78
Project Description: Turn Lanes at New Recreation Facility on SR 37
PI No: 0016256
Regional Project Id: SGRC-094
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,949,300
Invoiced to Date: $1,621,329.35
Project Description: Antioch Road Resurfacing
PI No: 0016257
Regional Project Id: SGRC-095
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,007,500
Invoiced to Date: $2,401,234.38
Project Description: Valdel Road Resurfacing
PI No: 0016258
Regional Project Id: SGRC-096
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $276,900
Invoiced to Date: $48,933.21
Project Description: Taylor Street Paving
PI No: 0016259
Regional Project Id: SGRC-097
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $450,000
Invoiced to Date: $237,107.54
Project Description: E. Revels Street Paving
PI No: 0016260
Regional Project Id: SGRC-098
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $588,000
Invoiced to Date: $234,433.98
Project Description: Lovett Street Sidewalks and Resurfacing
PI No: 0016261
Regional Project Id: SGRC-099
County: Cook
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $715,000
Invoiced to Date: $496,581.98
Project Description: Elm Street Sidewalks and Resurfacing
PI No: 0016262
Regional Project Id: SGRC-100
County: Echols
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $400,000
Invoiced to Date: $364,139.68
Project Description: John Hampton Road Paving
PI No: 0016263
Regional Project Id: SGRC-101
County: Irwin
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,967,000
Invoiced to Date: $1,347,562.33
Project Description: Osierfield Drive Widen and Resurface
PI No: 0016264
Regional Project Id: SGRC-102
County: Irwin
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,596,000
Invoiced to Date: $1,067,955.12
Project Description: Evergreen Road Widen and Resurface
PI No: 0016265
Regional Project Id: SGRC-103
County: Irwin
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $500,000
Invoiced to Date: $341,121.46
Project Description: Cherry Street Resurfacing and Drainage Improvements
PI No: 0016266
Regional Project Id: SGRC-104
County: Irwin
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $500,000
Invoiced to Date: $542,099.03
Project Description: Fifth Street Ext. Paving
PI No: 0016267
Regional Project Id: SGRC-105
County: Lanier
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $3,250,000
Invoiced to Date: $1,603,058.52
Project Description: River Road Widen and Resurface
PI No: 0016268
Regional Project Id: SGRC-106
County: Lanier
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,700,000
Invoiced to Date: $976,943.85
Project Description: Boyette Road Widen and Resurface
PI No: 0016269
Regional Project Id: SGRC-107
County: Lanier
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $770,000
Invoiced to Date: $606,377.93
Project Description: Giddens Road/Royals Road Resurface
PI No: 0016270
Regional Project Id: SGRC-108
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Widening
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $21,200,000
Invoiced to Date: $804,350.00
Project Description: Old Clyattville Road Widening - Lowndes
PI No: 0016271
Regional Project Id: SGRC-110
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Widening
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $6,516,800
Invoiced to Date: $6,029,271.07
Project Description: Old 41 N. Widening
PI No: 0016272
Regional Project Id: SGRC-111
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $5,600,000
Invoiced to Date: $358,769.45
Project Description: Shiloh Road Resurfacing and Bridge Replacement
PI No: 0016273
Regional Project Id: SGRC-112
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Roadway Project
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $1,175,000
Invoiced to Date: $0.00
Project Description: Orr Road Extension
PI No: 0016274
Regional Project Id: SGRC-113
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,300,000
Invoiced to Date: $2,400,000.00
Project Description: Clyattstone Road/Simpson Lane Paving and Drainage Improvements
PI No: 0016275
Regional Project Id: SGRC-114
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,525,000
Invoiced to Date: $3,592,144.27
Project Description: Briggston Road Paving and Drainage Improvements
PI No: 0016276
Regional Project Id: SGRC-115
County: Lowndes
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $3,750,000
Invoiced to Date: $3,852,417.03
Project Description: Hightower Road/Cooper Road NE Paving and Drainage Improvements
PI No: 0016277
Regional Project Id: SGRC-116
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,700,000
Invoiced to Date: $2,699,434.00
Project Description: Hickory Grove Road Bridge Replacement
PI No: 0016278
Regional Project Id: SGRC-117
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $3,450,000
Invoiced to Date: $626,779.00
Project Description: Kinderlou Clyattville Road Paving and Drainage Improvements
PI No: 0016279
Regional Project Id: SGRC-118
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,300,000
Invoiced to Date: $495,620.42
Project Description: Coleman Road NW Paving and Drainage Improvements
PI No: 0016280
Regional Project Id: SGRC-119
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $2,100,000
Invoiced to Date: $117,952.61
Project Description: Twin Lakes Road Paving and Drainage Improvements
PI No: 0016281
Regional Project Id: SGRC-120
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $3,700,000
Invoiced to Date: $0.00
Project Description: Hall Road Paving, Drainage and Other Improvements
PI No: 0016282
Regional Project Id: SGRC-121
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Widening
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $8,800,800
Invoiced to Date: $835,944.10
Project Description: Country Club Drive Widening
PI No: 0016283
Regional Project Id: SGRC-122
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $18,900,000
Invoiced to Date: $1,149,658.07
Project Description: St. Augustine Road RR Grade Separation
PI No: 0016284
Regional Project Id: SGRC-123
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Airport
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,705,000
Invoiced to Date: $2,143,277.77
Project Description: New Air Traffic Control Tower at Valdosta Regional Airport
PI No: 0016285
Regional Project Id: SGRC-124
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Widening
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $6,217,514
Invoiced to Date: $485,300.14
Project Description: Old Clyattville Road Widening - Valdosta
PI No: 0016286
Regional Project Id: SGRC-125
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Intersection Improvements
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $3,988,700
Invoiced to Date: $1,177,563.64
Project Description: St Augustine Road at Norman Drive Intersection, Drainage and Signal Improvements
PI No: 0016287
Regional Project Id: SGRC-126
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Intersection Improvements
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $1,258,000
Invoiced to Date: $838,857.10
Project Description: S Patterson Street at Griffin Avenue Intersection and Drainage Improvements
PI No: 0016288
Regional Project Id: SGRC-127
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Intersection Improvements
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,510,100
Invoiced to Date: $919,063.13
Project Description: St Augustine Road at Gornto Road Intersection and Drainage Improvements
PI No: 0016289
Regional Project Id: SGRC-128
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Widening
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $20,301,700
Invoiced to Date: $1,665,804.26
Project Description: Forrest Street Widening
PI No: 0016290
Regional Project Id: SGRC-129
County: Lowndes
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Intersection Improvements
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,734,000
Invoiced to Date: $151,780.00
Project Description: Baytree Road at Gornto Road Intersection and Signal Improvements
PI No: 0016291
Regional Project Id: SGRC-130
County: Pierce
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,750,000
Invoiced to Date: $1,097,754.47
Project Description: City of Patterson Resurfacing Bundle Phase 1
PI No: 0016292
Regional Project Id: SGRC-131
County: Pierce
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,500,324
Invoiced to Date: $1,200,330.37
Project Description: City of Blackshear Session Hill Resurfacing Bundle
PI No: 0016293
Regional Project Id: SGRC-132
County: Pierce
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $1,681,890
Invoiced to Date: $868,742.97
Project Description: Pierce County Horseshoe Road/Fletcher Road Area Resurfacing Bundle
PI No: 0016294
Regional Project Id: SGRC-133
County: Pierce
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,600,000
Invoiced to Date: $1,853,437.91
Project Description: Ware Street Widen and Resurface
PI No: 0016295
Regional Project Id: SGRC-134
County: Pierce
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $2,440,300
Invoiced to Date: $1,422,577.72
Project Description: St. Johns Church Road Widen and Resurface
PI No: 0016296
Regional Project Id: SGRC-135
County: Pierce
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $3,408,000
Invoiced to Date: $2,511,854.08
Project Description: Golf Course Road Alignment, Drainage and Resurfacing
PI No: 0016297
Regional Project Id: SGRC-136
County: Pierce
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Intersection Improvements
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $8,500,000
Invoiced to Date: $1,999,213.42
Project Description: US 84 Intersection and Signal Improvements from County Farm Road to New School Road
PI No: 0016298
Regional Project Id: SGRC-137
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,710,000
Invoiced to Date: $100,148.87
Project Description: Upper Ty Ty Road Bridge Replacement over Little River
PI No: 0016299
Regional Project Id: SGRC-139
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $1,410,000
Invoiced to Date: $1,108,135.00
Project Description: Scooterville Road Bridge Replacement over Little Creek
PI No: 0016300
Regional Project Id: SGRC-140
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $1,911,000
Invoiced to Date: $1,524,151.74
Project Description: Omega-Eldorado Road Bridge Replacement over Arnold Creek
PI No: 0016301
Regional Project Id: SGRC-141
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,582,250
Invoiced to Date: $165,257.58
Project Description: Omega-Eldorado Road Bridge Replacement over Little River
PI No: 0016302
Regional Project Id: SGRC-142
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Turn Lanes
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $941,600
Invoiced to Date: $1,556,864.19
Project Description: 8th Street Widening for Turn Lane
PI No: 0016303
Regional Project Id: SGRC-143
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,081,600
Invoiced to Date: $847,785.97
Project Description: 2nd Street Resurfacing
PI No: 0016304
Regional Project Id: SGRC-144
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Realignment
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $3,500,000
Invoiced to Date: $46,900.00
Project Description: McCormick Drive Widening and Realignment
PI No: 0016305
Regional Project Id: SGRC-145
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Airport
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $5,600,000
Invoiced to Date: $5,599,961.15
Project Description: Taxiway Improvements at Henry Tift Myers Airport
PI No: 0016306
Regional Project Id: SGRC-146
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Intersection Improvements
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,285,500
Invoiced to Date: $0.00
Project Description: 12th Street at Prince Avenue Intersection Improvements
PI No: 0016307
Regional Project Id: SGRC-147
County: Tift
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Bridge
Band: 3:2025 to 2028 (TIA 1)
Original Project Budgeted: $1,869,400
Invoiced to Date: $148,750.00
Project Description: 18th Street Ditch Bridge Replacements (5 Culverts)
PI No: 0016308
Regional Project Id: SGRC-148
County: Turner
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,000,000
Invoiced to Date: $940,430.73
Project Description: City of Ashburn Resurfacing Bundle and Sidewalk Improvements
PI No: 0016309
Regional Project Id: SGRC-149
County: Turner
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $1,400,000
Invoiced to Date: $59,887.50
Project Description: Hobby Road Paving
PI No: 0016310
Regional Project Id: SGRC-150
County: Turner
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $620,000
Invoiced to Date: $20,298.40
Project Description: Glynn Cook Road Paving
PI No: 0016311
Regional Project Id: SGRC-151
County: Turner
Congressional District: 8
Regional Commission: Southern Georgia
Project Type: Grade Drain Base and Pave
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $2,400,000
Invoiced to Date: $151,071.80
Project Description: Reid Road Paving
PI No: 0016312
Regional Project Id: SGRC-153
County: Ware
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Minor Widen & Resurfacing
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $1,600,000
Invoiced to Date: $1,843,143.00
Project Description: Albany Avenue Widen and Resurfacing
PI No: 0016313
Regional Project Id: SGRC-154
County: Ware
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Resurfacing & Maintenance
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $650,000
Invoiced to Date: $591,060.64
Project Description: Knight Avenue Resurfacing
PI No: 421345-
Regional Project Id: SGRC-072
County: Coffee
Congressional District: 12
Regional Commission: Southern Georgia
Project Type: Widening
Band: 1:2018 to 2022 (TIA 1)
Original Project Budgeted: $24,780,000
Invoiced to Date: $21,830,511.42
Project Description: SR 32 from west of CR 296 east to the West City Limits of Douglas
PI No: 422390-
Regional Project Id: SGRC-049
County: Clinch
Congressional District: 1
Regional Commission: Southern Georgia
Project Type: Widening
Band: 2:2022 to 2025 (TIA 1)
Original Project Budgeted: $26,625,000
Invoiced to Date: $1,155,225.99
Project Description: SR 89/US441 from Orange St in Homerville to CR 101/Cowart Rd
PI No: PI-0008020
Regional Project Id: RC07-0184
County: Washington
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $71,900,000
Invoiced to Date: $2,641,619.05
Project Description: Widening the existing 2-lane SR 15 to a 4-lane highway from Channell Rd to NW Wrightsville Bypass
PI No: PI-0012865
Regional Project Id: RC07-0015
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $54,700,000
Invoiced to Date: $0.00
Project Description: Widening for additional through lane capacity and turn lanes, conversion from ditch to curb & gutter - storm drain system, shared use path and sidewalk, and roadway lighting at select intersections.
PI No: PI-0013703
Regional Project Id: RC07-0160
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $23,000,000
Invoiced to Date: $0.00
Project Description: Widening, resurfacing, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system on Willis Foreman Road from Deans Bridge to Peach Orchard.
PI No: PI-0013704
Regional Project Id: RC07-0013
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $32,321,191
Invoiced to Date: $1,605,109.34
Project Description: Widening for two-way left turn lane and right turn lanes, roundabouts at various intersections, conversion from ditch to curb & gutter - storm drain system, shared use path and sidewalk, pedestrian corridor lighting and roadway lighting at select intersections
PI No: PI-0013927
Regional Project Id: RC07-0166
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $34,600,000
Invoiced to Date: $0.00
Project Description: SR4-US25 bridge pedestrian enhancements
PI No: PI-0017520
Regional Project Id: RC07-0002
County: Burke
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,350,000
Invoiced to Date: $26,197.91
Project Description: Add lighting and realign intersection
PI No: PI-0017521
Regional Project Id: RC07-0003
County: Burke
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,400,000
Invoiced to Date: $106,531.52
Project Description: Replaces narrow bridge on agriculture and forestry corridor
PI No: PI-0017522
Regional Project Id: RC07-0006
County: Burke
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Roadway
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $30,981,900
Invoiced to Date: $323,051.60
Project Description: Intersection realignments and new road construction to connect Plant Vogtle to Waynesboro. 4.2 miles of new construction and using 7.3 miles of existing roadway. 11.84 miles total project length connecting SR 56 at Cates Mead Road to Plant Vogtle entrance on River Road.
PI No: PI-0017523
Regional Project Id: RC07-0009
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,700,000
Invoiced to Date: $0.00
Project Description: Traffic signal and associated road improvements at the intersection of Old Berzelia Road, Harlem-Grovetown Road and Lake Forest Drive
PI No: PI-0017524
Regional Project Id: RC07-0011
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $2,300,000
Invoiced to Date: $286,640.92
Project Description: Road reconstruction of Whiskey Road from the Guy Drive intersection south to the constructed Wrightsboro Road improvements (approx. distance is 2,625 feet).
PI No: PI-0017525
Regional Project Id: RC07-0012
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Roadway
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $300,000
Invoiced to Date: $0.00
Project Description: Road extension of Whiskey Road from the Guy Drive intersection north to intersection with Butternut Drive (Brighton Landing) and the constructed Whiskey Road (approx. distance is 385 feet).
PI No: PI-0017526
Regional Project Id: RC07-0014
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $3,000,000
Invoiced to Date: $0.00
Project Description: Roundabout at Evans to Locks Road, conversion from ditch to curb & gutter - storm drain system, shared use path, pedestrian bridge, pedestrian corridor lighting and roadway lighting.
PI No: PI-0017527
Regional Project Id: RC07-0025
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Minor Widen
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $9,170,000
Invoiced to Date: $86,816.59
Project Description: Improves Clanton Road from dirt to asphalt from William Few Pkwy to Old Washington Rd, including realignment of Old Washington Rd at Washington Rd. Total project length is approximately 11,000 ft.
PI No: PI-0017528
Regional Project Id: RC07-0030
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Realignment
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $6,442,800
Invoiced to Date: $0.00
Project Description: Aligns Old Union Road with Clary Cut Road intersection at Appling Harlem Rd (SR 221). A roundabout will be considered as an option for intersection control.
PI No: PI-0017529
Regional Project Id: RC07-0040
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Multi-use Trail
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $12,900,000
Invoiced to Date: $0.00
Project Description: This project is to construct a 10ft wide paved shared-use path in multiple phases of the adopted Implementation Plan. Project includes a portion of Phase 4 following William Few Pkwy from Hardy McManus Rd-Grace Baptist Church to Riverwood Pkwy. Also includes the north section of Phase 1 from Riverwood Pkwy to Blanchard Woods Park. Includes Phase 2B and 3 following William Few Pkwy from Washington Rd (SR 104) to Euchee Creek-Baker Place Landfill site. Includes an unfunded section following Euchee Creek from existing Grovetown greenway terminus to Canterbury Farms subdivision. The project includes two ped-bike bridges over Euchee Creek and multiple raised boardwalks. The project includes up to two new public parking trail heads. Existing public parking trail head is available at the Grovetown trail terminus.
PI No: PI-0017530
Regional Project Id: RC07-0041
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,995,000
Invoiced to Date: $2,245,390.08
Project Description: Resurfacing and rehabilitation of White Oak Road, a major east-west corridor linking Appling GA to McDuffie County Line.
PI No: PI-0017531
Regional Project Id: RC07-0043
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,819,440
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Evans to Locks Road, between Columbia Industrial Dr and Stevens Creek Rd.
PI No: PI-0017532
Regional Project Id: RC07-0044
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $621,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Blackstone Camp Road, between SR 28 and Point Comfort Rd
PI No: PI-0017533
Regional Project Id: RC07-0046
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,260,000
Invoiced to Date: $0.00
Project Description: Sidewalk, resurfacing and rehabilitation of Blue Ridge Drive, between Evans to Locks Rd and Riverwatch Pkwy
PI No: PI-0017534
Regional Project Id: RC07-0047
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,600,000
Invoiced to Date: $2,841,090.00
Project Description: Resurfacing and rehabilitation of William Few Pkwy, between Lewiston Rd and Washington Rd
PI No: PI-0017535
Regional Project Id: RC07-0048
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,230,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Harlem Grovetown Road, between SR 47 and Appling-Harlem Rd
PI No: PI-0017536
Regional Project Id: RC07-0049
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $1,970,000
Invoiced to Date: $0.00
Project Description: Remove and replace the existing bridge and add 2-20' approach slabs on Dozier Road due to limited weight bridge deficiencies. The bridge will be 120' long, 2-20' approach slabs added and will be 47' 3" wide. Includes 2-12' travel lanes and 2-10' shoulders with barrier walls and fills build to accommodate guardrail.
PI No: PI-0017537
Regional Project Id: RC07-0208
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Realignment
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $9,550,000
Invoiced to Date: $461,458.49
Project Description: Realign Old Wrightsboro Road and Newmantown Road to align at W. Robinson Avenue in order to provide a traffic signalized intersection and pedestrian safety improvements.
PI No: PI-0017538
Regional Project Id: RC07-0400
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $397,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Baker Place Road, between William Few Pkwy and I-20 Bridge
PI No: PI-0017539
Regional Project Id: RC07-0401
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $101,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Bennet Road, between Ray Owens Rd and Washington Rd
PI No: PI-0017540
Regional Project Id: RC07-0402
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $630,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Blanchard Road, between Washington Rd and Hereford Farm Rd
PI No: PI-0017541
Regional Project Id: RC07-0403
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $256,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Browns Circle, between Harlem Grovetown Rd and Harlem Grovetown Rd
PI No: PI-0017542
Regional Project Id: RC07-0404
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $97,000
Invoiced to Date: $137,195.68
Project Description: Resurfacing and rehabilitation of CDP Industrial Boulevard, between Park West Drive and Point Wrightsboro Rd
PI No: PI-0017543
Regional Project Id: RC07-0405
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $290,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Columbia Industrial Boulevard, from Riverwatch Pkwy tie in to Evans to Locks Rd
PI No: PI-0017544
Regional Project Id: RC07-0406
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,105,000
Invoiced to Date: $1,943,490.84
Project Description: Resurfacing and rehabilitation of Countyline Road, between East White oak Rd to Harlem City Limits
PI No: PI-0017545
Regional Project Id: RC07-0407
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $118,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Dent Street, between Desoto Dr and Old Evans Rd
PI No: PI-0017546
Regional Project Id: RC07-0408
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $141,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Desoto Drive, between Dent St and Old Evans Rd
PI No: PI-0017547
Regional Project Id: RC07-0409
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $393,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Eubanks Drive, between Ray Owens Rd and Washington Rd
PI No: PI-0017548
Regional Project Id: RC07-0410
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $162,000
Invoiced to Date: $191,290.01
Project Description: Resurfacing and rehabilitation of Faircloth Drive-Library Drive, between Washington Rd and Evans Town Center Blvd
PI No: PI-0017549
Regional Project Id: RC07-0411
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $38,000
Invoiced to Date: $67,465.84
Project Description: Resurfacing and rehabilitation of Government Center Way, between Faircloth Dr and Ronald Reagan Dr
PI No: PI-0017550
Regional Project Id: RC07-0412
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $610,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of GR Tucker Road, between Leitner Mill Rd and Old Blythe Rd
PI No: PI-0017551
Regional Project Id: RC07-0413
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $455,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Halali Farm Road, between Hardy McManus Rd and Washington Rd
PI No: PI-0017552
Regional Project Id: RC07-0414
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $94,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Haley Drive, between Hightower Dr and Old Evans Rd
PI No: PI-0017553
Regional Project Id: RC07-0416
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $293,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Hardy McManus Road, between William Few Pkwy and Washington Rd
PI No: PI-0017554
Regional Project Id: RC07-0417
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $617,917
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Industrial Park Drive, between N Belair Rd and Southern Pines Dr
PI No: PI-0017555
Regional Project Id: RC07-0418
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $477,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Lonergan Hulme Road, between Nature's Way and New Cul de Sac
PI No: PI-0017556
Regional Project Id: RC07-0419
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $882,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Louisville Road, between Harlem Grovetown Rd and Wrightsboro Rd
PI No: PI-0017557
Regional Project Id: RC07-0420
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $384,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Martinez Boulevard, between Old Evans Rd and Baston Rd
PI No: PI-0017558
Regional Project Id: RC07-0421
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $543,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Mullikin Road, between Furys Ferry Rd and Dead End
PI No: PI-0017559
Regional Project Id: RC07-0422
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $107,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Oak Street North, between Washington Rd and Rose Ln
PI No: PI-0017560
Regional Project Id: RC07-0423
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $590,000
Invoiced to Date: $441,325.72
Project Description: Resurfacing and rehabilitation of Oakley Pirkle Road, between Belair Rd and S Old Belair Rd
PI No: PI-0017561
Regional Project Id: RC07-0424
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $327,969
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Old Evans Road, between Riverwatch Pkwy and Washington Rd
PI No: PI-0017562
Regional Project Id: RC07-0425
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $189,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Stevens Creek Road, between Evans to Locks Rd and Stevens Creek Rd
PI No: PI-0017563
Regional Project Id: RC07-0426
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $98,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Old Trail Road East, between Maywood Dr and Richmond County Line
PI No: PI-0017564
Regional Project Id: RC07-0428
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $141,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Old Trail Road West, between Maywood Dr and Flowing Wells Rd
PI No: PI-0017565
Regional Project Id: RC07-0429
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $754,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Old Union Road, between Appling Harlem Rd and Harlem Grovetown Rd
PI No: PI-0017566
Regional Project Id: RC07-0430
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $118,863
Invoiced to Date: $152,332.11
Project Description: Resurfacing and rehabilitation of Old Wheeler Road, between Wrightsboro Rd and Dead End
PI No: PI-0017567
Regional Project Id: RC07-0431
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $274,338
Invoiced to Date: $212,942.61
Project Description: Resurfacing and rehabilitation of Park West Drive, between Belair Rd and Old Wheeler Rd
PI No: PI-0017568
Regional Project Id: RC07-0432
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $161,438
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Pleasant Home Road, between County Line and Flowing Wells Rd
PI No: PI-0017569
Regional Project Id: RC07-0433
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $222,605
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Point Comfort Road, between Blackstone Camp Rd and Old Stevens Creek Rd
PI No: PI-0017570
Regional Project Id: RC07-0434
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,430,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Ray Owens Road, between Scotts Ferry Road and SR 150
PI No: PI-0017571
Regional Project Id: RC07-0435
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,104,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Ridge Road, between Washington Rd and Dead End
PI No: PI-0017572
Regional Project Id: RC07-0436
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $108,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Roberts Road, between Old Evans Rd and Hightower Dr
PI No: PI-0017573
Regional Project Id: RC07-0437
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $41,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Rose Street, between Camilla Rd and Chalker Rd
PI No: PI-0017574
Regional Project Id: RC07-0438
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $174,000
Invoiced to Date: $108.73
Project Description: Resurfacing and rehabilitation of Roswell Drive, between Ashbyrne Dr and Owens Rd
PI No: PI-0017575
Regional Project Id: RC07-0439
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $328,000
Invoiced to Date: $369,166.89
Project Description: Resurfacing and rehabilitation of Sawdust Road, between N Fairview Dr and Harlem City Limits
PI No: PI-0017576
Regional Project Id: RC07-0440
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,166,970
Invoiced to Date: $1,263,789.17
Project Description: Resurfacing and rehabilitation of South Old Belair Road, between Belair Rd and Columbia Rd
PI No: PI-0017577
Regional Project Id: RC07-0441
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $471,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Shucraft Road, between Dozier Rd and Appling Harlem Rd
PI No: PI-0017578
Regional Project Id: RC07-0442
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $216,438
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Southern Pines Drive, between Furys Ferry Rd and Industrial Park Dr
PI No: PI-0017579
Regional Project Id: RC07-0443
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $164,533
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Stevens Creek Road, between Island Overlook and Evans to Locks Rd
PI No: PI-0017580
Regional Project Id: RC07-0444
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $199,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Stevens Creek North, between Island Overlook and Old Stevens Creek Rd
PI No: PI-0017581
Regional Project Id: RC07-0445
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $795,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Sugar Creek Drive, between Lewiston Rd and Dead End
PI No: PI-0017582
Regional Project Id: RC07-0446
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $165,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Town Center Drive, between Washington Rd and N Belair Rd
PI No: PI-0017583
Regional Project Id: RC07-0447
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $690,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Tubman Road, between Old Washington Rd and Washington Rd
PI No: PI-0017584
Regional Project Id: RC07-0448
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $54,700
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Vaughn Road, between Parliament Rd and Furys Ferry Rd
PI No: PI-0017585
Regional Project Id: RC07-0449
County: Columbia
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,000,000
Invoiced to Date: $1,580,292.96
Project Description: Resurfacing and rehabilitation of Wrightsboro Road, between Belair Rd and City of Grovetown
PI No: PI-0017586
Regional Project Id: RC07-0450
County: Columbia
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $285,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Yelton Road, between Ray Owens Rd and Scotts Ferry Rd
PI No: PI-0017587
Regional Project Id: RC07-0053
County: Glascock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Turn Lanes
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $797,000
Invoiced to Date: $111,672.11
Project Description: Left-turn lanes and auxiliary lanes into the future Industrial Park on S.R. 102 1.3 miles West of the City of Gibson
PI No: PI-0017588
Regional Project Id: RC07-0054
County: Glascock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Roadway
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,724,000
Invoiced to Date: $51,963.31
Project Description: Additional rear entrances to the newly constructed Glascock County High School for service vehicles as well as high volume traffic generated during events occurring at the school to access additional parking.
PI No: PI-0017589
Regional Project Id: RC07-0058
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Minor Widen
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,396,000
Invoiced to Date: $0.00
Project Description: Surfacing from Old Eatonton Road to GA Hwy 16. Approximately 0.68 miles.
PI No: PI-0017590
Regional Project Id: RC07-0061
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $586,460
Invoiced to Date: $692,663.54
Project Description: Project involves repaving and restriping Friendship Nebo Road from Baldwin County Line to Linton Road.
PI No: PI-0017591
Regional Project Id: RC07-0214
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $95,080
Invoiced to Date: $108,100.00
Project Description: Resurfacing and rehabilitation and drainage improvements on Adams Street (.54 miles), between Maiden Ln and SR 15
PI No: PI-0017592
Regional Project Id: RC07-0215
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $100,000
Invoiced to Date: $113,000.00
Project Description: Resurfacing and rehabilitation of Maiden Lane-Rabun Street, between Hancock St and Hamilton St
PI No: PI-0017593
Regional Project Id: RC07-0060
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Roadway
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $7,178,000
Invoiced to Date: $634,354.71
Project Description: New alignment to extend Lake Crest from pavement ending to Lake Sinclair Drive. Approx. 3.9 miles.
PI No: PI-0017594
Regional Project Id: RC07-0210
County: Hancock
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $409,820
Invoiced to Date: $40,091.26
Project Description: Drainage, sidewalks, resurfacing from East Hamilton Street to SR 16
PI No: PI-0017595
Regional Project Id: RC07-0080
County: Jenkins
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,100,000
Invoiced to Date: $220,755.04
Project Description: Streetscape of approximately 1200 LF of West Winthrope Avenue, approximately 1025 LF of Cotton Avenue, approximately 625 LF of North Hendrix Street, and approximately 560 LF of North Gray Street to include new curb and gutter, sidewalks with paver strips, and associated landscaping.
PI No: PI-0017596
Regional Project Id: RC07-0089
County: Jenkins
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Turn Lanes
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $990,000
Invoiced to Date: $0.00
Project Description: Construction of an approximately 450 LF right-turn deceleration lane and a 475’ long industrial park entrance north of Planters EMC off Hwy 25.
PI No: PI-0017597
Regional Project Id: RC07-0074
County: Jenkins
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,440,000
Invoiced to Date: $192,373.49
Project Description: Intersection Improvements at Hwy17-Old Louisville Rd; N Hwy 23-Hiltonia Road; and a right turn lane at East Hwy 67
PI No: PI-0017598
Regional Project Id: RC07-0086
County: Jenkins
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $3,608,000
Invoiced to Date: $248,838.48
Project Description: Construction of a 150’ circumscribed roundabout.
PI No: PI-0017599
Regional Project Id: RC07-0090
County: Jenkins
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Passing Lanes
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $4,645,000
Invoiced to Date: $242.51
Project Description: Construction of approximately one mile of an east-bound and west-bound passing lane, two approximately 1100’ left turn deceleration lanes, and two approximately 450’ right turn deceleration lanes and associated resurfacing, shoulder dressing, and re-striping on GA-17 near US Silicate..
PI No: PI-0017600
Regional Project Id: RC07-0091
County: Jenkins
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $2,915,000
Invoiced to Date: $273,562.31
Project Description: Construction of turn lanes on GA-17, approximately 4500 LF of concrete sidewalks, three roadway realignments, a main recreation park entrance, curb and gutter along GA-17, pavement resurfacing, flashing pedestrian beacons, highway lighting, striping, grading, drainage, and erosion control.
PI No: PI-0017601
Regional Project Id: RC07-0093
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,000,000
Invoiced to Date: $82,150.45
Project Description: Construction of a roundabout at the intersection of SR 220 and SR 47- Cliatts
PI No: PI-0017602
Regional Project Id: RC07-0308
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,228,000
Invoiced to Date: $0.00
Project Description: Resurfacing 6.14 miles of roadway, dressing shoulders and re-striping a deteriorating roadway.
PI No: PI-0017603
Regional Project Id: RC07-0310
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $222,000
Invoiced to Date: $0.00
Project Description: Resurfacing 1.12 miles of roadway, dressing shoulders and re-striping a deteriorating roadway.
PI No: PI-0017604
Regional Project Id: RC07-0313
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $728,000
Invoiced to Date: $0.00
Project Description: Resurfacing 1.26 miles of roadway, dressing shoulders and re-striping a deteriorating roadway.
PI No: PI-0017605
Regional Project Id: RC07-0314
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $486,000
Invoiced to Date: $0.00
Project Description: Resurfacing 2.43 miles of roadway, dressing shoulders and re-striping a deteriorating roadway.
PI No: PI-0017606
Regional Project Id: RC07-0315
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,470,000
Invoiced to Date: $0.00
Project Description: Resurfacing 7.95 miles of roadway, dressing shoulders and re-striping a deteriorating roadway.
PI No: PI-0017607
Regional Project Id: RC07-0212
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,856,000
Invoiced to Date: $0.00
Project Description: Grading Drainage and Paving 1.06 miles of roadway, dressing shoulders and re-striping a dirt roadway.
PI No: PI-0017608
Regional Project Id: RC07-0311
County: Lincoln
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,800,000
Invoiced to Date: $0.00
Project Description: Grading Drainage and Paving 2.13 miles of roadway, dressing shoulders and re-striping a dirt roadway.
PI No: PI-0017609
Regional Project Id: RC07-0099
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Median
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,893,000
Invoiced to Date: $170,520.16
Project Description: Reconfiguration of existing striping to one 12-ft lane in each direction with a 12-ft.flush median from S.R. 12 to S.R. 150 in the City of Thomson. This project will also widen the existing sidewalks and shorten the lengths of cross-walks.
PI No: PI-0017610
Regional Project Id: RC07-0219
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,500,000
Invoiced to Date: $0.00
Project Description: Multiple Resurfacing and rehabilitation, including grading, drainage and guardrails. Includes Rock House Rd, Roy Reeves Rd, Groves Rd, Radford Culberth Rd & Culberth Rd
PI No: PI-0017611
Regional Project Id: RC07-0095
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Frontage Roads
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $5,622,000
Invoiced to Date: $0.00
Project Description: New road construction to provide connectivity between Dallas Drive and Scuffle Road allowing local traffic to access both the S.R. 17 - I-20 ramps as well as the Scuffle Road - I-20 ramps.
PI No: PI-0017612
Regional Project Id: RC07-0096
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Roadway
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $3,409,000
Invoiced to Date: $0.00
Project Description: Widening of Samuels Road and providing logical termini on S. R. 150. The existing acute intersection of Sterling Wells Rd @ SR 150 to be eliminated.
PI No: PI-0017613
Regional Project Id: RC07-0097
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $2,665,000
Invoiced to Date: $117,257.63
Project Description: Construction of a roundabout at the intersection of SR 150 and Stagecoach Road located near the City of Thomson.
PI No: PI-0017614
Regional Project Id: RC07-0217
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $4,672,000
Invoiced to Date: $0.00
Project Description: Sidewalk rehabilitation-addition and resurfacing along Harrison Rd NE from SR 17 to SR 223 in the City of Thomson
PI No: PI-0017615
Regional Project Id: RC07-0218
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $4,150,000
Invoiced to Date: $0.00
Project Description: Sidewalk rehabilitation-addition and resurfacing along SR 150 - Gordon Street from Mesena Road to Harrison Rd NE in the City of Thomson
PI No: PI-0017616
Regional Project Id: RC07-0220
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $2,975,000
Invoiced to Date: $0.00
Project Description: Multiple Resurfacing and rehabilitation, including grading, drainage and guardrails. Includes Randall Hunt Rd and Greenbrier Rd
PI No: PI-0017617
Regional Project Id: RC07-0228
County: McDuffie
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Roadway
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $1,000,000
Invoiced to Date: $0.00
Project Description: Restriping of Main Street to become one-way southbound and Green Way to become one-way north bound. Both from SR 17 to Hendricks St.
PI No: PI-0017618
Regional Project Id: RC07-0104
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $8,045,304
Invoiced to Date: $8,158.64
Project Description: Widening, resurfacing, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system on 15th Street from Walton way to Government street.
PI No: PI-0017619
Regional Project Id: RC07-0117
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Transit
Band: Multiple (TIA 2)
Original Project Budgeted: $23,000,000
Invoiced to Date: $4,600,000.00
Project Description: This project will provide mobility options for all travelers; improve access to employment; and help mitigate congestion and maximize the use of existing infrastructure by promoting high-occupancy travel.
PI No: PI-0017620
Regional Project Id: RC07-0120
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $20,304,000
Invoiced to Date: $0.00
Project Description: Widening, resurfacing, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system on Broad Street from Washington Road to Sand Bar Ferry Road.
PI No: PI-0017621
Regional Project Id: RC07-0121
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $3,174,428
Invoiced to Date: $0.00
Project Description: Repair and restoration of bridge on Broad street over Rae's creek to address spalls with exposed reinforcement and severe cracking, repairing of expansion joints, cleaning and painting the structure.
PI No: PI-0017622
Regional Project Id: RC07-0122
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Bridge
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $2,420,550
Invoiced to Date: $0.00
Project Description: Repair and restoration of bridge on Broad street over Rae's creek to address spalls with exposed reinforcement and severe cracking, repairing of expansion joints, cleaning and painting the structure.
PI No: PI-0017623
Regional Project Id: RC07-0124
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Airport
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,900,000
Invoiced to Date: $412,623.22
Project Description: Removal of old, unnecessary airfield pavements including runway and taxiway shoulders and intersection radii. Fencing replacement to enhance safety and security. Improvements to Runway 11-29.
PI No: PI-0017624
Regional Project Id: RC07-0139
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Signals
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $7,623,000
Invoiced to Date: $0.00
Project Description: County-wide implementation of the second phase of the ATMS-ITS master plan in Richmond County. This phase would install more fiber-optic infrastructure, cameras, speed-detection devices, and dynamic message boards along heavily traveled corridors.
PI No: PI-0017625
Regional Project Id: RC07-0140
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Signals
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,000,000
Invoiced to Date: $1,066,771.24
Project Description: Intelligent Transportation system (ITS) operations project provides resources needed for functioning of TMC at desired level. Project improves traffic flow and safety by managing traffic operation at TMC
PI No: PI-0017626
Regional Project Id: RC07-0151
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Transit
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $600,000
Invoiced to Date: $0.00
Project Description: Provide transit prioritization at the signalized intersections along the most congested corridors, as well as providing emergency vehicle preemption along the heavily traveled corridors to reduce the risk of crash occurrence during emergency response activities.
PI No: PI-0017627
Regional Project Id: RC07-0165
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Railroad Crossings
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $13,000,000
Invoiced to Date: $261,440.00
Project Description: Construct rail into the Augusta Corporate Park (Park is 1,792 acres) from the Norfolk Southern Mainline. The project will entail the construction of 22,324 feet of rail and a mainline spur plus all needed components such as switches and grading.
PI No: PI-0017628
Regional Project Id: RC07-0110
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Airport
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $7,000,000
Invoiced to Date: $5,489,693.33
Project Description: Construction of an additional concrete apron on the Airport's north corridor.
PI No: PI-0017629
Regional Project Id: RC07-0112
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Airport
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,600,000
Invoiced to Date: $1,600,000.00
Project Description: Rehabilitation of the Augusta Regional Airport's second runway, Runway 8-26.
PI No: PI-0017630
Regional Project Id: RC07-0118
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $20,097,176
Invoiced to Date: $0.00
Project Description: Widening, resurfacing, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system on Barton Chapel Road between Deans Bridge and Augusta West Parkway.
PI No: PI-0017631
Regional Project Id: RC07-0125
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Airport
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $2,600,000
Invoiced to Date: $0.00
Project Description: Development of a large-scale hangar complex to attract new aviation or aerospace businesses to the region.
PI No: PI-0017632
Regional Project Id: RC07-0129
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $6,395,630
Invoiced to Date: $720,251.45
Project Description: Widening, resurfacing, constructing curb and gutter, sidewalks, lighting and storm sewer system on Dennis Road.
PI No: PI-0017633
Regional Project Id: RC07-0130
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $11,882,560
Invoiced to Date: $0.00
Project Description: Widening, resurfacing, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system and landscaping.
PI No: PI-0017634
Regional Project Id: RC07-0132
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $3,164,700
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation, reconstructing existing curb and gutter, sidewalk and storm sewer system.
PI No: PI-0017635
Regional Project Id: RC07-0134
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,063,450
Invoiced to Date: $0.00
Project Description: This project is for pavement rehabilitation and resurfacing on Golden Camp Road Resurfacing.
PI No: PI-0017636
Regional Project Id: RC07-0135
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Roadway
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $15,000,000
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system on Gordon Highway between 1-520 to state line.
PI No: PI-0017637
Regional Project Id: RC07-0136
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,616,800
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation on Hephzibah McBean Road between Brothersville Road and Peach Orchard Road.
PI No: PI-0017638
Regional Project Id: RC07-0137
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $7,059,397
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation on Highland Avenue between Wrightsboro Road and Gordon Highway. Addition of turn lanes, sidewalks, improving intersections and upgrading signals.
PI No: PI-0017639
Regional Project Id: RC07-0142
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $3,719,430
Invoiced to Date: $0.00
Project Description: Intersection improvements include resurfacing, constructing sidewalks and lighting. Includes improvements along Laney Walker Blvd, R.A. Dent Blvd and Augusta Ave.
PI No: PI-0017640
Regional Project Id: RC07-0146
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $17,011,727
Invoiced to Date: $0.00
Project Description: Widening, resurfacing, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system on Milledgeville Road between Northleg and Barton Chapel.
PI No: PI-0017641
Regional Project Id: RC07-0148
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $8,938,270
Invoiced to Date: $0.00
Project Description: Widening, resurfacing, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system on Monte Sano Avenue between Wrightsboro Road to Walton Way. Intersection improvements at central Avenue and Monte Sano Avenue.
PI No: PI-0017642
Regional Project Id: RC07-0149
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Grade Adjust
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $10,000,000
Invoiced to Date: $0.00
Project Description: Restore and repair New Savannah Bluff Lock and Dam, located on the Savannah River adjacent to Bush Field Airport. Includes restoration and repair of its adjacent surrounding areas.
PI No: PI-0017643
Regional Project Id: RC07-0153
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $9,252,974
Invoiced to Date: $0.00
Project Description: Widening, resurfacing, and reconstructing existing curb and gutter, sidewalk and storm sewer system on Richmond Hill road between ( Lumpkin to Deans Bridge)
PI No: PI-0017644
Regional Project Id: RC07-0154
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $21,962,975
Invoiced to Date: $0.00
Project Description: Widening, resurfacing, intersection improvements, reconstructing the existing curb and gutter, sidewalks, lighting and storm sewer system on Skinner Mill Road between Boy Scout Rd. and Walton way Ext.
PI No: PI-0017645
Regional Project Id: RC07-0156
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,506,052
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation on Story Mill Road between Hephzibah McBean Road and Fulcher Rd.
PI No: PI-0017646
Regional Project Id: RC07-0157
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $18,629,405
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation, intersection improvements, reconstructing the existing curb and gutter, sidewalks, lighting, landscaping and storm sewer system on Tobacco Road between Deans Bridge Road to Peach Orchard Road.
PI No: PI-0017647
Regional Project Id: RC07-0162
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Intersection Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $4,924,040
Invoiced to Date: $0.00
Project Description: Intersection improvements to include resurfacing, constructing sidewalks and lightning. Intersection serves Laney Walker redevelopment zone.
PI No: PI-0017648
Regional Project Id: RC07-0164
County: Richmond
Congressional District: 12
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $6,437,824
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation on Wheeless Road between Gordon Highway and Deans Bridge. This project includes additional turn lanes, sidewalks, improving intersections and upgrading signals.
PI No: PI-0017649
Regional Project Id: RC07-0169
County: Taliaferro
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $800,000
Invoiced to Date: $32,503.00
Project Description: Patching, leveling, and resurfacing with HMA. Start at 4.18 miles north of SR 47 to 8.1 miles north of SR 47 to the County Line for a total of 4.0 miles.
PI No: PI-0017650
Regional Project Id: RC07-0170
County: Taliaferro
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $680,000
Invoiced to Date: $0.00
Project Description: Patching, leveling, and resurfacing with HMA. Start at County Line to Gullant Road for a total length of 2.9 miles.
PI No: PI-0017651
Regional Project Id: RC07-0229
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,947,000
Invoiced to Date: $1,755,418.74
Project Description: Resurfacing and rehabilitation of Mitchell Road, between Hwy 16 and Glascock County Line; Includes a 1' paved shoulder.
PI No: PI-0017652
Regional Project Id: RC07-0230
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,577,872
Invoiced to Date: $2,625,053.50
Project Description: Resurfacing and rehabilitation of Mayfield Road, Five Points Jewell Road and Mt Beullah Church Road
PI No: PI-0017653
Regional Project Id: RC07-0231
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,122,348
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Cadley Road, to Hwy 80 North
PI No: PI-0017654
Regional Project Id: RC07-0232
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $561,174
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Northwood-Camak Road, between Camak City Limits and Ridge Rd
PI No: PI-0017655
Regional Project Id: RC07-0234
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $495,153
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Little Brier Creek Church Road, between Ricketson Rd and Hwy 80
PI No: PI-0017656
Regional Project Id: RC07-0235
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $528,164
Invoiced to Date: $537,993.49
Project Description: Resurfacing and rehabilitation of Andrews Chapel Road, between Jack Ray Rd and Prospect Church
PI No: PI-0017657
Regional Project Id: RC07-0237
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $313,597
Invoiced to Date: $0.00
Project Description: Resurfacing and rehabilitation of Garthwright Road, between Hwy 80 North and Thomson Hwy (Hwy 278)
PI No: PI-0017658
Regional Project Id: RC07-0238
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $297,092
Invoiced to Date: $302,989.68
Project Description: Resurfacing and rehabilitation of Rocky Branch Church Rd, between Elam Church Rd and Sam Collins Rd
PI No: PI-0017659
Regional Project Id: RC07-0171
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Sidewalks
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $2,765,660
Invoiced to Date: $89,163.39
Project Description: Sidewalks along GA 80 in the City of Warrenton.
PI No: PI-0017660
Regional Project Id: RC07-0178
County: Warren
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $3,088,000
Invoiced to Date: $0.00
Project Description: Grade, drain, base and pave Story Road and Williams Church Rd to meet a 45mph speed design.
PI No: PI-0017661
Regional Project Id: RC07-0187
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,395,000
Invoiced to Date: $1,858,742.50
Project Description: Multiple resurfacing and rehabilitation. Locations include Centerville Rd, Philomath Rd, Columbus Grand Rd, Ann Denard Dr, Orr Rd, Denard Rd and East St
PI No: PI-0017662
Regional Project Id: RC07-0191
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $850,000
Invoiced to Date: $631,694.51
Project Description: Resurfacing of Amity Road, between Lincoln County Line and SR 47; Resurfacing of 4.99 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-0017663
Regional Project Id: RC07-0193
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $920,000
Invoiced to Date: $601,835.80
Project Description: Resurfacing of Baltram Trace Road, between Court Ground and SR 44; Resurfacing of 5.4 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-0017664
Regional Project Id: RC07-0199
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,475,000
Invoiced to Date: $1,280,545.06
Project Description: Resurfacing of Little Metasville Road, between SR 47 and Lincoln County Line; Resurfacing of 8.53 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-0017665
Regional Project Id: RC07-0200
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,425,000
Invoiced to Date: $1,188,363.81
Project Description: Resurfacing of New Town Road, between Clark Station Church Rd and SR 78; Resurfacing of 8.26 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-0017666
Regional Project Id: RC07-0201
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $610,300
Invoiced to Date: $78,445.11
Project Description: Resurfacing of Oak Grove Road, between Martin Bentley Rd and Metasville Rd; Resurfacing of 8.35 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-0017667
Regional Project Id: RC07-0204
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,356,600
Invoiced to Date: $1,333,776.92
Project Description: Resurfacing of Lundberg Road, between Andrew Dr and Taliaferro County Line; Resurfacing of 7.89 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-0017668
Regional Project Id: RC07-0205
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,021,700
Invoiced to Date: $702,079.40
Project Description: Resurfacing of Stoney Ridge Road, between SR 44 and SR 44; Resurfacing of 5.96 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-0017669
Regional Project Id: RC07-0188
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $175,000
Invoiced to Date: $0.00
Project Description: Resurfacing of Liberty Street, between Alexander Ave and SR 44
PI No: PI-0017670
Regional Project Id: RC07-0189
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $140,000
Invoiced to Date: $0.00
Project Description: Resurfacing of Gordon Street, between Spring St-SR 47 and SR 44
PI No: PI-0017671
Regional Project Id: RC07-0190
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $214,000
Invoiced to Date: $0.00
Project Description: Patching and resurfacing of Hospital Drive, between SR 47 and SR 44
PI No: PI-0017672
Regional Project Id: RC07-0192
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $710,000
Invoiced to Date: $705,063.75
Project Description: Resurfacing of Aonia Road, between SR 17 and SR 47; Resurfacing of 4.12 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-0017673
Regional Project Id: RC07-0196
County: Wilkes
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,345,000
Invoiced to Date: $1,152,744.25
Project Description: Resurfacing of Delhi Road, between SR 17 and SR 79; Resurfacing of 7.79 miles of roadway with 2” of asphalt with associated shoulder dressing and striping.
PI No: PI-222120-
Regional Project Id: RC07-0062
County: Jefferson
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $45,000,000
Invoiced to Date: $0.00
Project Description: Widening to 4 lanes from the Wadley to the Louisville on US1- SR 4.
PI No: PI-222160-
Regional Project Id: RC07-0063
County: Jefferson
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $26,100,000
Invoiced to Date: $0.00
Project Description: Widening to 4 lanes with grassed median from Clarks Mill Rd to Warrior Trail on SR 4.
PI No: PI-222170-
Regional Project Id: RC07-0064
County: Jefferson
Congressional District: 10
Regional Commission: Central Savannah River Area
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $35,300,000
Invoiced to Date: $0.00
Project Description: Widening to 4 lanes from Warrior Trail (JCHS) to HWY 88 south of Wrens on US1-SR 4.
PI No: PI-0013578
Regional Project Id: HG-Lauren-011
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $69,420,475
Invoiced to Date: $0.00
Project Description: SR 31 / US 441 Widening from SR 46 to CR 272 / David Mullis Road
PI No: PI-0018428
Regional Project Id: HG-Applin-001
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $979,303
Invoiced to Date: $1,115,077.00
Project Description: This project will improve roadway safety to the citizens of Appling County by leveling and resurfacing on this route from the Baxley City Limits and ending at Altamaha School Road. This route is a major arterial road which provides access to numerous residents, agriculture chicken houses, Businesses, an Elementary School, and provides a connection between US 1/SR 4 and Altamaha School Road.
PI No: PI-0018429
Regional Project Id: HG-Applin-002
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,606,460
Invoiced to Date: $0.00
Project Description: This project will improve roadway safety to the citizens of Appling County by leveling and resurfacing on this route from SR 15 and ending at the Bacon County Line. This route is a major arterial road which provides access to numerous residents, churches, developed sub-divisions, fire station, and provides a connection between SR 15 and SR 203 located in Bacon County.
PI No: PI-0018430
Regional Project Id: HG-Applin-003
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,741,525
Invoiced to Date: $1,982,976.00
Project Description: Ten Mile Road - This project will improve roadway safety to the citizens of Appling County by leveling and resurfacing on this route from North Main Street (Old SR 144) and ending at East River Road. This route is a major arterial road which provides access to numerous residents, agriculture chicken houses, Businesses, County Landfill, developed sub-divisions, county maintained lake, camp sites, river landings, fire station.
PI No: PI-0018431
Regional Project Id: HG-Applin-004
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,401,306
Invoiced to Date: $0.00
Project Description: Ten Mile Road PH 2 - This project will improve roadway safety to the citizens of Appling County by leveling and resurfacing on this route from East River Road and ending at SR 144. This route is a major arterial road which provides access to numerous residents, agriculture chicken houses, Businesses, County Landfill, developed sub-divisions, county maintained lake, camp sites, river landings, fire station and provides a connection between SR 144 and North Main Street (Old SR 144).
PI No: PI-0018432
Regional Project Id: HG-Baxley-001
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $67,000
Invoiced to Date: $67,000.00
Project Description: Azalea Drive - This project will improve roadway safety to the citizens of Baxley by leveling, re-striping, and resurfacing. This street is from SR 27 and ending at EOP is the main entrance way into an existing developed sub-division with numerous dwellings located within it.
PI No: PI-0018433
Regional Project Id: HG-Baxley-002
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $230,800
Invoiced to Date: $230,800.00
Project Description: Bay Street - This project will improve roadway safety to the citizens of Baxley by milling, leveling and resurfacing and re-striping on this street is from S.R. 4 and ending at the City Limits. This is a major arterial street which provides access to numerous residents, businesses, churches, developed sub-divisions, City Public Works, concrete plant and provides a connection between S.R. 4 and S.R. 19 located in Jeff Davis County.
PI No: PI-0018434
Regional Project Id: HG-Baxley-003
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $144,000
Invoiced to Date: $144,000.00
Project Description: North Brobston Street - This project will improve roadway safety to the citizens of Baxley by milling, leveling, resurfacing, and re-striping on this street is from SR 27 and ending at SR 4. This is a major arterial street which provides access to numerous residents, businesses, churches, developed sub-divisions, 2 Housing Apartments, stores, laundry wash, and restaurants. Provides a connection between SR 27 and SR 4 being used for the Northern Citizens to access Walmart.
PI No: PI-0018435
Regional Project Id: HG-Baxley-004
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $119,300
Invoiced to Date: $0.00
Project Description: W. Tollison Street - This project will improve roadway safety to the citizens of Baxley by milling, re-striping, and resurfacing on this street is from SR 4 and ending at Crowder Street. This street is a major arterial street which provides access to numerous residents, agriculture chicken houses, businesses, Recreational complex, developed sub-divisions, fire station.
PI No: PI-0018436
Regional Project Id: HG-Baxley-005
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $116,800
Invoiced to Date: $0.00
Project Description: Beach Road - This project will improve roadway safety to the citizens of Baxley by deep patching, leveling, resurfacing, and re-striping on this street is from West Tollison Street and ending at Patterson Road. This street is a major arterial street which provides access to numerous residents, businesses, developed sub-divisions, transports services, housing apartments, and new housing being built.
PI No: PI-0018437
Regional Project Id: HG-Baxley-006
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $56,100
Invoiced to Date: $0.00
Project Description: East Tollison Street - This project will improve roadway safety to the citizens of Baxley by milling, resurfacing, and re-striping on this street is from SR 4 and ending in front of our local hospital. This is a major arterial street which provides access to residents, businesses, doctor offices, Health Department, Appling Healthcare System, Pavilion Nursing Home, Public Swimming Pool, and developed sub-divisions.
PI No: PI-0018438
Regional Project Id: HG-Baxley-007
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $100,100
Invoiced to Date: $0.00
Project Description: Lucky Street - This project will improve roadway safety to the citizens of Baxley by deep patching, leveling, re-striping, and resurfacing on this route is from West Tollison Street and ending at South West Park Avenue. This route is a major arterial street which provides access to numerous Business complexes, City Water Park, Doctor Offices, and County Annex.
PI No: PI-0018439
Regional Project Id: HG-Baxley-008
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $64,000
Invoiced to Date: $0.00
Project Description: North Beach Street - This project will improve roadway safety to the citizens of Baxley by deep patching, leveling, resurfacing, and restriping on this route is from SR 27 and ending at Patterson Street. This route is a major arterial street which provides access to numerous residents, restaurant, public tennis courts, City Gym, Food Bank, and existing developed subdivisions
PI No: PI-0018440
Regional Project Id: HG-Baxley-009
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $184,300
Invoiced to Date: $0.00
Project Description: North Main Street - This project will improve roadway safety to the citizens of Baxley by milling, leveling, re-striping, and resurfacing on this route is from SR 4 and ending at City Limits. This route is a major arterial road which provides access to numerous residents, agriculture chicken houses, Businesses, developed sub-divisions, Head Start, churches, fire station and provides a connection between SR 4 and SR 144 to Tattnall County
PI No: PI-0018441
Regional Project Id: HG-Baxley-012
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $56,600
Invoiced to Date: $0.00
Project Description: Glendale Ave. - This project will improve roadway safety to the citizens of Baxley by milling resurfacing, and restriping on this street is from SR 4 and ending at Lackawanna Street. This is a major arterial street which provides access to numerous residents, business complexes, doctor offices, and insurance agents.
PI No: PI-0018442
Regional Project Id: HG-Baxley-013
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $100,800
Invoiced to Date: $0.00
Project Description: Jones Street - This project will improve roadway safety to the Citizens of Baxley by milling, leveling, resurfacing, and re-striping on this street is from Bay Street and ending at West Tollison Street. This is a major arterial street which provides access to numerous residents, 2 housing apartments, promotes economic developments, churches, and developed sub-divisions.
PI No: PI-0018443
Regional Project Id: HG-Baxley-014
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $114,300
Invoiced to Date: $0.00
Project Description: Nails Ferry Road - This project will improve roadway safety to the Citizens of Baxley by milling, resurfacing, and re-stripping on this street is from SR 4 and ending at City Limits. This is a major arterial street which provides access to numerous residents, agriculture, chicken houses, businesses, an Elementary School, and provides a connects between SR 4 and Altamaha School Road.
PI No: PI-0018444
Regional Project Id: HG-Baxley-015
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $77,700
Invoiced to Date: $0.00
Project Description: Peachtree Street - This project will improve roadway safety to the Citizens of Baxley by milling, resurfacing, leveling, and re-striping on this street is from Kent Street and ending at Blackshear Highway. This street provides access to residences, apartments, developed sub-divisions, and also promotes economic development.
PI No: PI-0018445
Regional Project Id: HG-Baxley-016
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $44,800
Invoiced to Date: $0.00
Project Description: Plier Street - This project will improve roadway safety to the Citizens of Baxley by milling, leveling, resurfacing, and re-striping on this street is from SR 4 and ending at Lackawanna Street. This street provides access to residents, businesses, churches, and developed sub-divisions.
PI No: PI-0018446
Regional Project Id: HG-Baxley-017
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $138,300
Invoiced to Date: $0.00
Project Description: Sursson Street - This project will improve roadway safety to the Citizens of Baxley by patching, leveling, resurfacing, and re-striping on this street is from SR 4 and ending at Old Ben Carter Road. This is a major arterial street which provides access to numerous residents, churches, Public Swimming Pool, public ball fields, public gym, and other businesses.
PI No: PI-0018447
Regional Project Id: HG-Baxley-018
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $77,800
Invoiced to Date: $0.00
Project Description: Cadillac Drive (Phase 2) - This project will improve roadway safety to the Citizens of Baxley by patching, leveling, resurfacing, and re-striping on this street is from City Circle Road and ending at City Limits. This is a major arterial street which provides access to numerous residents, trailer parks, pump foundry, Baler Manufacture, and developed sub-divisions.
PI No: PI-0018448
Regional Project Id: HG-Baxley-019
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $53,300
Invoiced to Date: $0.00
Project Description: Cherry Street (Phase 2) - This project will improve roadway safety to the citizens of Baxley by patching, leveling, resurfacing, and restriping on this street is from Kent Street and ending at Poor Robin Extension. This street provides access to residents, day care facility, developed subdivisions, and to public schools.
PI No: PI-0018449
Regional Project Id: HG-Baxley-020
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $59,000
Invoiced to Date: $0.00
Project Description: Jeykll Road (Phase 2) - This project will improve roadway safety to the citizens of Baxley by patching, leveling, resurfacing, and restriping on this street is from City Circle Road and ending at City Limits. This is a major arterial street which provides access to numerous residents, steel building manufacturer, baler manufacturer, pump foundry, electrical contractor, and developed subdivision.
PI No: PI-0018450
Regional Project Id: HG-Baxley-025
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Planning
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,500,000
Invoiced to Date: $58,193.57
Project Description: US 341/SR 27 One Way Pairs - This project includes a planning study for a proposed one-way pair in downtown Baxley, Georgia. Traffic on US 341 through Baxley has increased steadily and significantly over the past several years and this route can no longer effectively and efficiently handle the traffic volumes.
PI No: PI-0018451
Regional Project Id: HG-Baxley-010
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $45,700
Invoiced to Date: $0.00
Project Description: Robin Street - This project will improve roadway safety to the citizens of Baxley by deep patching, leveling, resurfacing, and restriping on this street is from Mauldin Street and ending at Beach Road. This street provides access to commercial activities along with residences also promotes economic development with improved access.
PI No: PI-0018452
Regional Project Id: HG-Surren-001
County: Appling
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $79,679
Invoiced to Date: $0.00
Project Description: Main street ditching and piping from norwood st south to burkett st
PI No: PI-0018453
Regional Project Id: HG-Bleckl-001
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,000,000
Invoiced to Date: $129,001.93
Project Description: Grade Drain Base Pave - Begin at SR 87 end at 1.0 mile east of SR 87
PI No: PI-0018454
Regional Project Id: HG-Bleckl-002
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,000,000
Invoiced to Date: $128,400.93
Project Description: Grade Drain Base Pave - Begin 1 mile east of SR 87 and end 1 mile east of beginning point including the intersection of Longstreet Church Road
PI No: PI-0018455
Regional Project Id: HG-Bleckl-003
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,140,000
Invoiced to Date: $128,995.34
Project Description: Grade Drain Base Pave - Begin 2 mile east of SR 87 and end at SR 112
PI No: PI-0018456
Regional Project Id: HG-Cochra-001
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $405,344
Invoiced to Date: $0.00
Project Description: This project is to improve road safety and drainage by reconstructing storm drainage structures that serve Peacock, Lewis and Peter Streets in southeast Cochran.
PI No: PI-0018457
Regional Project Id: HG-Cochra-004
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $293,113
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by reconstructing the road surface, installing curb and gutter, catch basins and drainage infrastructure on Ash Street between Leach Lane and N. Sixth St.
PI No: PI-0018458
Regional Project Id: HG-Cochra-005
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $475,324
Invoiced to Date: $0.00
Project Description: This project will improve the road segment surface and drainage for residents on West Railroad Avenue and improve access to the City's Animal Control Shelter and waste treatment plant.
PI No: PI-0018459
Regional Project Id: HG-Cochra-006
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $350,000
Invoiced to Date: $0.00
Project Description: This project is to resurface Mac Thompson Road from West Dykes St. to Faulk Road.
PI No: PI-0018460
Regional Project Id: HG-Cochra-002
County: Bleckley
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $397,722
Invoiced to Date: $0.00
Project Description: This project is to improve infrastructure in downtown Cochran (Ga. State Route 87) including the installation of bulb-outs, crosswalks, pavers, and the replacement of sidewalks between East Ash Street to Dykes Street.
PI No: PI-0018461
Regional Project Id: HG-Candle-001
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,697,765
Invoiced to Date: $5,000.00
Project Description: East Hiawatha ST paving provides much needed improvements to a vital corridor that connects Fire, EMS, Sheriffs DEPT, and other County services to the City of Metter. Beginning at GA HWY 121 for 1.78 miles & paving ending at existing paving at the Sheriffs DEPT & overlay ending at GA HWY 46, 0.96 mi of paving & 0.82 mi of overlay. Overlay with 90 lbs/SY of OGI & 135 lbs 12.5, paving typical section attached. Road paving to include: utility relocation, drainage improvements, grading, & paving.
PI No: PI-0018462
Regional Project Id: HG-Candle-002
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $372,113
Invoiced to Date: $0.00
Project Description: Piney Grove RD (CR #177) Paving begins at GA HWY 57 and Extends for 0.24 mi to Piney Grove Missionary Baptist Church and Cemetery. The road is currently a County maintained dirt road however some realignment will be required to move the back slope away from existing gravestones. Paving will stop 20’ beyond the existing church parking lot.
PI No: PI-0018463
Regional Project Id: HG-Candle-003
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $531,238
Invoiced to Date: $0.00
Project Description: Lake Church Road (CR #30): Resurfacing from State Route 46 pavement joint, south to Dutch Ford Road (approximately 3.3-miles). This 2-lane minor collector has several load cracking failures; with failed area cut & patch, and full leveling recommended prior to overlay.
PI No: PI-0018464
Regional Project Id: HG-Metter-001
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $50,133
Invoiced to Date: $0.00
Project Description: Resurfacing from W Hiawatha St to W. Pine St for 0.3 mile. Patch with 4" 12.5mm and Level with 60lbs/sy of 9.5mm, surface with 135 lbs/sy of 9.5mm TP2
PI No: PI-0018465
Regional Project Id: HG-Metter-002
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $45,573
Invoiced to Date: $4,450.00
Project Description: This project will improve road safety. Base and paving from Ellis St to Dead end. Install 6" of GABC and pave 165lbs/sy of 9.5mm TP2 SP.
PI No: PI-0018466
Regional Project Id: HG-Metter-003
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $37,547
Invoiced to Date: $0.00
Project Description: Resurfacing Hickory St. from Daniel St. to dead end for 0.22 mile. Patch with 4" of 12.5mm for pothole repair and Level with 60lbs/sy of 9.5mm and surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018467
Regional Project Id: HG-Metter-004
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $21,740
Invoiced to Date: $0.00
Project Description: Resurfacing Doctors St from Cedar St to Dead end for 0.10 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018468
Regional Project Id: HG-Metter-005
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $38,040
Invoiced to Date: $0.00
Project Description: Resurfacing from Cedar St to Hope St for 0.25 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018469
Regional Project Id: HG-Metter-006
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $32,330
Invoiced to Date: $0.00
Project Description: Resurfacing from Holly Dr to Holly Dr for 0.25 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018470
Regional Project Id: HG-Metter-007
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $16,306
Invoiced to Date: $0.00
Project Description: Resurfacing from Cedar St to Hickory St. for 0.063 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018471
Regional Project Id: HG-Metter-008
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $84,215
Invoiced to Date: $1,525.00
Project Description: Resurfacing from Cedar St to N. Lewis St. for 0.60 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018472
Regional Project Id: HG-Metter-011
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $98,572
Invoiced to Date: $1,860.00
Project Description: (North Kennedy St) Resurfacing from Broad St to Eldridge St 0.51 mile. Level with 60lbs/sy 9.5mm , surface with 135 lbs/sy of 9.5mm SP TP2. Repair utility patches with 4" of 12.5mm asphalt patching.
PI No: PI-0018473
Regional Project Id: HG-Metter-012
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $31,110
Invoiced to Date: $0.00
Project Description: Resurfacing from N. Lewis St. to McClean St for 0.20 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018474
Regional Project Id: HG-Metter-019
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $100,000
Invoiced to Date: $0.00
Project Description: This is a heavily traveled connector between 2 state routes. This project is to improve roadway safety by increasing turn radii at the intersection of SR 129, extending existing storm drain pipe and adding curb and gutter to improve drainage and by leveling the road with 60lbs/sy with 9.5mm and resurfacing with 135lbs/sy of 9.5mm TP 2 SP. from S Lewis St to S. Leroy St. on Lanier Street.
PI No: PI-0018475
Regional Project Id: HG-Metter-020
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $46,130
Invoiced to Date: $0.00
Project Description: (North and South Register Streets) Resurfacing from W. Pine St. to Central Ave. for 0.30 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm TP2. These are two short segmented roads that connect two heavily traveled roads and a state route.
PI No: PI-0018476
Regional Project Id: HG-Metter-021
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $53,543
Invoiced to Date: $0.00
Project Description: (W Lee St) Resurfacing from dead end (Pvt Security Gate) at High St to Cedar St for 0.30 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018477
Regional Project Id: HG-Metter-022
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $57,292
Invoiced to Date: $0.00
Project Description: This project will improve road safety on unpaved Cotton Ave. by installing 6" of GABC and pave 165lbs/sy of 9.5mm TP2 SP surfacing from Martin Luther King , Jr Blvd to N. Trapnell St.
PI No: PI-0018478
Regional Project Id: HG-Metter-023
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $39,986
Invoiced to Date: $0.00
Project Description: (Wallace Street) Resurfacing from State Route 46 to E. Lillian St.for 0.16 mile. Patch with 4" of 12.5mm for pothole repair and Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm TP2.
PI No: PI-0018479
Regional Project Id: HG-Metter-024
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $40,976
Invoiced to Date: $0.00
Project Description: (Candler Street) Resurfacing from Cedar St. to N. Lewis St. for 0.25 mile. Level with 60lbs/sy of 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018480
Regional Project Id: HG-Metter-025
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $86,144
Invoiced to Date: $0.00
Project Description: (S. Terrell St.) Resurfacing from E. Hiawatha St to E. Broad St.for 0.51 mile. Level with 60lbs/sy of 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018481
Regional Project Id: HG-Metter-009
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $100,000
Invoiced to Date: $0.00
Project Description: This is a heavily traveled connector between 2 state routes. This project is to improve roadway safety by adding curb and gutter to improve drainage and by leveling the road with 60lbs/sy with 9.5mm and resurfacing with 135lbs/sy of 9.5mm TP 2 SP. from S Lewis St to S. Leroy St.
PI No: PI-0018482
Regional Project Id: HG-Metter-010
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $175,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by adding curb and gutter to improve drainage. Safety will also be improved by leveling the road with 60lbs/sy with 9.5mm and resurfacing with 135lbs/sy of 9.5mm TP 2 SP from Washington St. to Martin Luther King, Jr Blvd.
PI No: PI-0018483
Regional Project Id: HG-Metter-013
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $68,383
Invoiced to Date: $0.00
Project Description: This project is to improve safety by extending roadway paving by installing 6in of GABC on 440 LF of unpaved section of roadway, level existing asphalt with 9.5mm and surface entire roadway with 9.5mm SP at 135lbs/sy from the dead end of McLean St to 0.2mile to Franklin St.
PI No: PI-0018484
Regional Project Id: HG-Metter-014
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $84,281
Invoiced to Date: $0.00
Project Description: This project is to improve safety by extending roadway paving by installing 6in of GABC on 385 LF of unpaved section of roadway, level existing asphalt with 9.5mm and surface entire roadway with 9.5mm SP at 135lbs/sy from N.Lewis St to 0.4 mile to Dead End of Franklin St.
PI No: PI-0018485
Regional Project Id: HG-Metter-015
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $22,932
Invoiced to Date: $0.00
Project Description: (Addlestone Dr) Resurfacing from E Lillian St. to Dead end for 0.10 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018486
Regional Project Id: HG-Metter-016
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $100,234
Invoiced to Date: $0.00
Project Description: (Aline Ave) Resurfacing from State Route 46. to South Register St for 0.60 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018487
Regional Project Id: HG-Metter-017
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $87,775
Invoiced to Date: $0.00
Project Description: (Airport Road) Resurfacing from dead end (End of pavement) to State Route 23 for 0.60 mile. Level with 60lbs/sy 9.5mm, surface with 135 lbs/sy of 9.5mm SP TP2.
PI No: PI-0018488
Regional Project Id: HG-Metter-018
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $34,193
Invoiced to Date: $0.00
Project Description: (North and South Daughtry Streets) Resurfacing from Aline Ave. to Central Ave. for 0.16 mile. Level with 60lbs/sy 9.5mm and surface with 135 lbs/sy of 9.5mm SP TP2. These are two combined short segmented roads that connect two heavily traveled roads and a state route.
PI No: PI-0018489
Regional Project Id: HG-Pulask-001
County: Candler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $102,948
Invoiced to Date: $0.00
Project Description: This project will repair and resurface approximately 0.31-miles of Rosemary Church Road, beginning at Brannen Street and running north to the Pulaski City Limits. This 2-lane major collector serves as a thoroughfare for North-South travel along the eastern side of Candler County. This roadway has extensive pavement failures with deep base reclamation recommended.
PI No: PI-0018490
Regional Project Id: HG-Dodge-002
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $393,673
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing, striping and installing rpm"s. The Road is from Hwy 117 to Airport road and is a major road to the Heart of Georgia Aviation Technical College
PI No: PI-0018491
Regional Project Id: HG-Dodge-003
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $949,881
Invoiced to Date: $0.00
Project Description: This project is to improve safety by resurfacing and installing new striping and rpm's. This is a major road from Dodge County to the City of Eastman.
PI No: PI-0018492
Regional Project Id: HG-Dodge-004
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $342,909
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing striping and installing rpm's
PI No: PI-0018493
Regional Project Id: HG-Dodge-005
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $119,351
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing striping and installing rpm's
PI No: PI-0018494
Regional Project Id: HG-Dodge-001
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,600,000
Invoiced to Date: $0.00
Project Description: This project is to widen airport road 2'on each side from Hwy 46 to the Laurens County line and resurface the entire road.
PI No: PI-0018495
Regional Project Id: HG-Dodge-006
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $560,813
Invoiced to Date: $0.00
Project Description: This project is to improve safety by resurfacing striping and installing rpm's
PI No: PI-0018496
Regional Project Id: HG-Dodge-007
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $282,616
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing, striping and installing rpm's
PI No: PI-0018497
Regional Project Id: HG-Dodge-008
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $365,640
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by repairing and resurfacing of Ross Stapleton Road from Chauncey-Rhine Road to the end of the pavement.
PI No: PI-0018498
Regional Project Id: HG-Dodge-010
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $600,000
Invoiced to Date: $0.00
Project Description: This project is to improve the roadway capacity and safety by repairing and resurfacing the existing roadway on Pleasant Grove Church Road from SR 117 to Chauncey-Milan Road.
PI No: PI-0018499
Regional Project Id: HG-Chaunc-001
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $39,600
Invoiced to Date: $0.00
Project Description: Resurface of North Railroad
PI No: PI-0018500
Regional Project Id: HG-Chaunc-002
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,300
Invoiced to Date: $0.00
Project Description: Resurface of Phillips
PI No: PI-0018501
Regional Project Id: HG-Chaunc-003
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $4,320
Invoiced to Date: $0.00
Project Description: Resurface of Cottage
PI No: PI-0018502
Regional Project Id: HG-Chaunc-004
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $19,500
Invoiced to Date: $0.00
Project Description: Resurface of North Railroad south end
PI No: PI-0018503
Regional Project Id: HG-Chaunc-005
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $16,800
Invoiced to Date: $0.00
Project Description: Resurface of Norman, George, and Bush
PI No: PI-0018504
Regional Project Id: HG-Chaunc-006
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $27,000
Invoiced to Date: $0.00
Project Description: Resurface of South Railroad
PI No: PI-0018505
Regional Project Id: HG-Eastma-018
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $100,709
Invoiced to Date: $0.00
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Griffin Ave and the termini is Hwy 23
PI No: PI-0018506
Regional Project Id: HG-Eastma-019
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $30,184
Invoiced to Date: $0.00
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Pine Dr and the termini is Fitzgerald St
PI No: PI-0018507
Regional Project Id: HG-Eastma-022
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $58,031
Invoiced to Date: $0.00
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Hawkinsville Hwy and the termini is a dead end
PI No: PI-0018508
Regional Project Id: HG-Eastma-023
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $17,828
Invoiced to Date: $0.00
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Holly Dr and the termini is Creekside Dr
PI No: PI-0018509
Regional Project Id: HG-Eastma-001
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Bike-Ped Facility
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $30,000
Invoiced to Date: $0.00
Project Description: This project involves design and construction a two new crosswalks that features Solar powered lighted pedestrian crosswalk posts, signs and striping. Similar traffic lights are used in Athens
PI No: PI-0018510
Regional Project Id: HG-Eastma-002
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $56,600
Invoiced to Date: $6,891.35
Project Description: This project involves removal, design, and construction of a failing culvert on 14th Avenue
PI No: PI-0018511
Regional Project Id: HG-Eastma-003
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $71,742
Invoiced to Date: $0.00
Project Description: This project includes the design and installation of new sidewalks. This will enhance pedestrian safety and mobility
PI No: PI-0018512
Regional Project Id: HG-Eastma-004
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $78,428
Invoiced to Date: $20,127.26
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Hwy 27 and the termini is Laryn Ln
PI No: PI-0018513
Regional Project Id: HG-Eastma-005
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $20,191
Invoiced to Date: $5,181.74
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Mary Alexander Dr and the termini is Mary Alexander Dr
PI No: PI-0018514
Regional Project Id: HG-Eastma-006
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $90,528
Invoiced to Date: $23,232.40
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Mary Alexander Dr and the termini is Mary Alexander Dr
PI No: PI-0018515
Regional Project Id: HG-Eastma-007
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $168,000
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This project also includes matching the sidewalks and brick pavers adjacent to the project area. This will enhance downtown aesthetics, pedestrian safety and mobility
PI No: PI-0018516
Regional Project Id: HG-Eastma-008
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $168,000
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This project also includes matching the sidewalks and brick pavers adjacent to the project area. This will enhance downtown aesthetics, pedestrian safety and mobility
PI No: PI-0018517
Regional Project Id: HG-Eastma-009
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $60,608
Invoiced to Date: $15,554.01
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Evergreen Cir and the termini is Evergreen Dr
PI No: PI-0018518
Regional Project Id: HG-Eastma-010
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $103,051
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This will enhance pedestrian safety and mobility
PI No: PI-0018519
Regional Project Id: HG-Eastma-011
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $206,339
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This project also includes the design and installation of new sidewalks. This will enhance pedestrian safety and mobility
PI No: PI-0018520
Regional Project Id: HG-Eastma-012
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $107,393
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This will enhance pedestrian safety and mobility
PI No: PI-0018521
Regional Project Id: HG-Eastma-013
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $136,796
Invoiced to Date: $35,106.78
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Oak St and the termini is Hawkinsville Hwy
PI No: PI-0018522
Regional Project Id: HG-Eastma-014
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $150,134
Invoiced to Date: $38,529.73
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of Eastman's Pavement Management Program. The project begins at Hwy 23 and the termini is Ag Best Rd
PI No: PI-0018523
Regional Project Id: HG-Eastma-015
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $128,123
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This will enhance pedestrian safety and mobility
PI No: PI-0018524
Regional Project Id: HG-Eastma-016
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $70,122
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This will enhance pedestrian safety and mobility
PI No: PI-0018525
Regional Project Id: HG-Eastma-017
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $104,412
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This will enhance pedestrian safety and mobility
PI No: PI-0018526
Regional Project Id: HG-Eastma-020
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $40,339
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This will enhance pedestrian safety and mobility
PI No: PI-0018527
Regional Project Id: HG-Eastma-021
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $26,691
Invoiced to Date: $0.00
Project Description: This project scope includes sidewalks that are damaged and needing repair in place. This will enhance pedestrian safety and mobility
PI No: PI-0018528
Regional Project Id: HG-Milan-004
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $32,165
Invoiced to Date: $0.00
Project Description: Leveling and resurfacing (20' wide)
PI No: PI-0018529
Regional Project Id: HG-Milan-005
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $33,500
Invoiced to Date: $0.00
Project Description: Leveling and resurfacing (20' wide)
PI No: PI-0018530
Regional Project Id: HG-Milan-006
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $26,650
Invoiced to Date: $0.00
Project Description: Leveling and resurfacing (20' wide)
PI No: PI-0018531
Regional Project Id: HG-Milan-007
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $26,650
Invoiced to Date: $0.00
Project Description: Leveling and resurfacing (20' wide)
PI No: PI-0018532
Regional Project Id: HG-Milan-001
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $80,627
Invoiced to Date: $0.00
Project Description: Mill, new sidewalk, drainage, patching, leveling & resurfacing
PI No: PI-0018533
Regional Project Id: HG-Milan-002
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $23,585
Invoiced to Date: $0.00
Project Description: Leveling and Resurfacing (20' Wide)
PI No: PI-0018534
Regional Project Id: HG-Milan-003
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $35,850
Invoiced to Date: $0.00
Project Description: Leveling and resurfacing (20' wide)
PI No: PI-0018535
Regional Project Id: HG-Rhine-001
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $44,000
Invoiced to Date: $0.00
Project Description: This project is to improve the roadway capacity and safety by resurfacing on Sycamore Street from US 280 to the dead end. This roadway carries mostly residential traffic.
PI No: PI-0018536
Regional Project Id: HG-Rhine-002
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $46,086
Invoiced to Date: $0.00
Project Description: This project is to resurface 4th Ave to improve roadway safety. This road is where the City Hall and the Police Department is located. This is a heavily traveled road and is in need of resurfacing. The entire City of Rhine will get benefit from this project.
PI No: PI-0018537
Regional Project Id: HG-Rhine-003
County: Dodge
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $91,196
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing and striping Old Milan Road from Hwy 280 to the end of pavement.
PI No: PI-0018538
Regional Project Id: HG-Emanue-006
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,525,969
Invoiced to Date: $0.00
Project Description: Cow Ford Bridge Road resurfacing will provide much needed improvements to a Major Collector road that serves as a thoroughfare for North - South travel along the Western side of Emanuel County. Beginning at US HWY 221 for 8.65 miles and Ending at GA HWY 57. A crack relief interlayer is necessary and shall be accomplished with OGI at 90 lbs/SY. A Surface Course of 12.5mm SP at 165 lbs/SY, shoulder building, grassing, restriping, and replacements of signage as needed.
PI No: PI-0018539
Regional Project Id: HG-Emanue-001
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,155,625
Invoiced to Date: $0.00
Project Description: This project will repair and preserve a vital roadway corridor that serves Swainsboro and Emanuel County Industry connecting high volume freight traffic to State Routes. Beginning at Meadowlake Parkway and Ending At Old Nunez Road. A heavy duty paving profile is required as truck count can exceed 200 per day. Resurface with 90 lbs/SY of OGI and 220 lbs/SY of 12.5mm SP, 4" deep patching with 300 TNs of 25mm asphalt current estimate.
PI No: PI-0018540
Regional Project Id: HG-Emanue-002
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,238,478
Invoiced to Date: $722,785.80
Project Description: This project will improve roadway capacity and safety by resurfacing a vital corridor that connects Stillmore in Emanuel CNTY, Candler County, and Toombs County to HWY 1 N of Lyons GA. Substantial cracking is present with high traffic volumes, resurface with 90 lbs/SY of OGI and 165 lbs/SY of 12.5mm with areas of worst damage being patched with 4" of 25mm Asphalt. The 3.3 miles through Candler County is only 22' wide so it will get 2' widening on either side with 4" of 25mm asphalt.
PI No: PI-0018541
Regional Project Id: HG-Emanue-003
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $313,000
Invoiced to Date: $0.00
Project Description: This project will improve roadway capacity and safety to a GA State Park by resurfacing George L. Smith State Park Road from US HWY 80 for 1.95 mi South 50 beyond pipe repair at park entrance. Resurface with 60lbs/SY of 9.5mm leveling, 165lbs/SY 12.5 mm SP Surface, and replacing the failing pipe crossing at park entrance with 42" RCP with precast headwalls in order to prevent section loss as the shoulder and road is failing at this location.
PI No: PI-0018542
Regional Project Id: HG-Emanue-004
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $575,508
Invoiced to Date: $0.00
Project Description: Modoc Road resurfacing will provide much needed improvements to a Major Collector road that connects the Modoc Community to the City of Swainsboro. Beginning at GA HWY 56 for 3.25 mi and Ending at the City of Swainsboro City Limits. A crack relief interlayer is necessary and shall be accomplished with OGI at 90 lbs/SY. A Surface Course of 12.5mm SP at 165 lbs/SY, shoulder building, grassing, restriping, and replacements of signage as needed.
PI No: PI-0018543
Regional Project Id: HG-Emanue-005
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $916,191
Invoiced to Date: $0.00
Project Description: Canoochee Garfield Road resurfacing will provide much needed improvements to a Major Collector road that connects the Garfield and Canoochee Community to the City of Swainsboro. Beginning at GA HWY 192 for 5.6 miles and Ending at the Garfield City Limits. A crack relief interlayer is necessary and shall be accomplished with OGI at 90 lbs/SY. A Surface Course of 12.5mm SP at 165 lbs/SY, shoulder building, grassing, restriping, and replacements of signage as needed.
PI No: PI-0018544
Regional Project Id: HG-Emanue-007
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $1,558,668
Invoiced to Date: $0.00
Project Description: Herndon Road resurfacing will provide much needed improvements to a Major Collector road that serves as a thoroughfare for North - South travel along the Eastern side of Emanuel County. Beginning at Canoochee Rd for 8.8 miles and Ending at the Jenkins County Line. A crack relief interlayer is necessary and shall be accomplished with OGI at 90 lbs/SY. A Surface Course of 12.5mm SP at 165 lbs/SY, shoulder building, grassing, restriping, and replacements of signage as needed.
PI No: PI-0018545
Regional Project Id: HG-Emanue-008
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $324,625
Invoiced to Date: $0.00
Project Description: Fairground Road resurfacing will provide much needed improvements to a Minor Collector road that serves as a thoroughfare for North Swainsboro, connecting GA HWY 57 to GA HWY 56. Beginning at US HWY 1 for 2.0 miles and Ending at the GA HWY 56. A crack relief interlayer is necessary and shall be accomplished with OGI at 90 lbs/SY. A Surface Course of 12.5mm SP at 165 lbs/SY, shoulder building, grassing, restriping, and replacements of signage as needed.
PI No: PI-0018546
Regional Project Id: HG-Garfie-001
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $40,355
Invoiced to Date: $0.00
Project Description: Resurfacing Greene Street at the crossroads Sybil Street to Hebron Road
PI No: PI-0018547
Regional Project Id: HG-Garfie-002
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $14,655
Invoiced to Date: $0.00
Project Description: Resurface Nathan Avenue. Starting at Monroe and ending at North Railroad Street.
PI No: PI-0018548
Regional Project Id: HG-Nunez-002
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $58,000
Invoiced to Date: $0.00
Project Description: Resurface Alcott Dr
PI No: PI-0018549
Regional Project Id: HG-Oak Pa-001
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $103,100
Invoiced to Date: $0.00
Project Description: Resurfacing NE railroad ST for 0.71 mi from Harrington ST around Cul-De-Sac at Cemetery. Level with 90 lbs OGI for Crack Relief, and Surface with 135 lbs/SY of 9.5 mm TP II
PI No: PI-0018550
Regional Project Id: HG-Oak Pa-002
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $29,799
Invoiced to Date: $0.00
Project Description: Resurfacing Oak Park AVE for 0.22 mi from Harrington ST to the end of pavement at Church. Level with 90 lbs OGI for Crack Relief, and Surface with 135 lbs/SY of 9.5 mm TP II
PI No: PI-0018551
Regional Project Id: HG-Oak Pa-003
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $21,836
Invoiced to Date: $0.00
Project Description: Resurfacing Thompson ST for 0.16 mi from NE Railroad AVE to Strange AVE. Level with 90 lbs OGI for Crack Relief, and Surface with 135 lbs/SY of 9.5 mm TP II
PI No: PI-0018552
Regional Project Id: HG-Oak Pa-004
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $21,836
Invoiced to Date: $0.00
Project Description: Resurfacing Williamson ST for 0.16 mi from NE Railroad AVE to Strange AVE. Level with 90 lbs OGI for Crack Relief, and Surface with 135 lbs/SY of 9.5 mm TP II
PI No: PI-0018553
Regional Project Id: HG-Stillm-001
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $122,074
Invoiced to Date: $0.00
Project Description: Resurfacing of Railroad AVE from 4th ST to Stillmore Metter Road, for 0.9 mi. Level 60lbs 9.5 LVL, and Resuface 155 lbs 12.5 mm SP
PI No: PI-0018554
Regional Project Id: HG-Stillm-002
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $75,000
Invoiced to Date: $0.00
Project Description: Resurfacing W 5th AVE from N 2nd ST to Atlana ST for a total of 0.52 miles. Curb and Gutter is present along entire route, mill existing surface, level with 90.bs of OGI and top with 135 lbs of 9.5mm
PI No: PI-0018555
Regional Project Id: HG-Summer-001
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $56,516
Invoiced to Date: $0.00
Project Description: Summertown Main St beginning at HWY 56 and ending at railroad tracks.
PI No: PI-0018556
Regional Project Id: HG-Swains-001
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $152,900
Invoiced to Date: $0.00
Project Description: Addition of New Sidewalks along North Green St to add to pedestrian safety. There are no present sidewalk at this time.
PI No: PI-0018557
Regional Project Id: HG-Swains-002
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $140,000
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018558
Regional Project Id: HG-Swains-003
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $32,200
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018559
Regional Project Id: HG-Swains-004
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $34,937
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018560
Regional Project Id: HG-Swains-005
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $70,000
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018561
Regional Project Id: HG-Swains-006
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $298,410
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018562
Regional Project Id: HG-Swains-007
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $88,370
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018563
Regional Project Id: HG-Swains-008
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $42,644
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018564
Regional Project Id: HG-Swains-009
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $77,298
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018565
Regional Project Id: HG-Swains-010
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $23,800
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018566
Regional Project Id: HG-Swains-011
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $32,200
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018567
Regional Project Id: HG-Swains-012
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $36,607
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018568
Regional Project Id: HG-Swains-013
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $39,200
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018569
Regional Project Id: HG-Swains-014
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $72,800
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018570
Regional Project Id: HG-Swains-015
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $23,800
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018571
Regional Project Id: HG-Swains-016
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $52,148
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018572
Regional Project Id: HG-Swains-017
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $47,600
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018573
Regional Project Id: HG-Swains-018
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $39,200
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018574
Regional Project Id: HG-Swains-019
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $74,200
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018575
Regional Project Id: HG-Swains-020
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $70,644
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018576
Regional Project Id: HG-Swains-021
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $102,943
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018577
Regional Project Id: HG-Swains-022
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $88,370
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018578
Regional Project Id: HG-Swains-023
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $193,961
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018579
Regional Project Id: HG-Swains-024
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $47,011
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018580
Regional Project Id: HG-Swains-025
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $28,000
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018581
Regional Project Id: HG-Swains-026
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $60,487
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018582
Regional Project Id: HG-Swains-027
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $37,891
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018583
Regional Project Id: HG-Swains-028
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $78,400
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018584
Regional Project Id: HG-Swains-029
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $177,800
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018585
Regional Project Id: HG-Swains-030
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $74,200
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018586
Regional Project Id: HG-Swains-031
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Airport
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $213,889
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of tarmac and airplane hold and parking apron asphalt surface
PI No: PI-0018587
Regional Project Id: HG-Swains-033
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $53,200
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018588
Regional Project Id: HG-Swains-034
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $44,800
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018589
Regional Project Id: HG-Swains-036
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $252,265
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018590
Regional Project Id: HG-Swains-038
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $15,400
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018591
Regional Project Id: HG-Swains-039
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $25,200
Invoiced to Date: $0.00
Project Description: Leveling, Patching, and Resurfacing of 20' wide asphalt surface
PI No: PI-0018592
Regional Project Id: HG-Twin C-001
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $286,605
Invoiced to Date: $0.00
Project Description: This project is to resurface street which is showing signs of alligator cracking which can cause pavement failure.
PI No: PI-0018593
Regional Project Id: HG-Twin C-002
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $169,797
Invoiced to Date: $0.00
Project Description: This project is to improve roadway conditions of Old Swainsboro Road, there is alligator cracking which can lead to pavement failure.
PI No: PI-0018594
Regional Project Id: HG-Twin C-003
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $130,859
Invoiced to Date: $0.00
Project Description: This project is to improve roadway cracking and potholes.
PI No: PI-0018595
Regional Project Id: HG-Twin C-004
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $45,318
Invoiced to Date: $0.00
Project Description: This project is to resurface the roadway with significant alligator cracking that could lead to pavement failure.
PI No: PI-0018596
Regional Project Id: HG-Twin C-005
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $46,990
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by Leveling, Patching, and Resurfacing of 21' wide asphalt surface.
PI No: PI-0018597
Regional Project Id: HG-Twin C-006
County: Emanuel
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $45,870
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by Leveling, Patching, and Resurfacing of 20' wide asphalt surface.
PI No: PI-0018598
Regional Project Id: HG-Evans-001
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $482,481
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by widening the existing road bed by 4 feet preventing future edge line failures. This project is to improve the roadway by resurfacing the existing road utilizing .5” of leveling and 1.5” of 12.5mm asphalt.
PI No: PI-0018599
Regional Project Id: HG-Evans-002
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $421,436
Invoiced to Date: $0.00
Project Description: This project is to improve the roadway by resurfacing the existing road utilizing .5” of leveling and 1.5” of 12.5mm asphalt.
PI No: PI-0018600
Regional Project Id: HG-Evans-003
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $106,248
Invoiced to Date: $0.00
Project Description: This project is to improve the roadway by resurfacing the existing road utilizing .5” of leveling and 1.5” of 12.5mm asphalt.
PI No: PI-0018601
Regional Project Id: HG-Evans-006
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $937,500
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by widening the existing road bed by 4 feet preventing future edge line failures. This project is to improve the roadway by resurfacing the existing road utilizing .5” of leveling and 1.5” of 12.5mm asphalt.
PI No: PI-0018602
Regional Project Id: HG-Evans-004
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $300,000
Invoiced to Date: $0.00
Project Description: This project is to improve the roadway by resurfacing the existing road utilizing .5” of leveling and 1.5” of 12.5mm asphalt.
PI No: PI-0018603
Regional Project Id: HG-Evans-005
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $797,491
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by widening the existing road bed by 4 feet preventing future edge line failures. This project is to improve the roadway by resurfacing the existing road utilizing .5” of leveling and 1.5” of 12.5mm asphalt.
PI No: PI-0018604
Regional Project Id: HG-Bellvi-002
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $73,244
Invoiced to Date: $0.00
Project Description: Project is to improve roadway capacity/safety by resurfacing Hearn St. between Hwy 292 and Hugh Brewton Rd. This road is one of the most used in the city to include access to Pinewood Academy.
PI No: PI-0018605
Regional Project Id: HG-Claxto-001
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $100,600
Invoiced to Date: $100,600.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on W James St. from Gregory St. to N Grady St.
PI No: PI-0018606
Regional Project Id: HG-Claxto-002
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $18,800
Invoiced to Date: $18,800.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on N Grady St. from W Main St. to W James St.
PI No: PI-0018607
Regional Project Id: HG-Claxto-003
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $44,200
Invoiced to Date: $44,200.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on Earl Ave. from S College St. to Hendrix St.
PI No: PI-0018608
Regional Project Id: HG-Claxto-004
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $30,100
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on E Smith St. from S Claxton St. to Dead End
PI No: PI-0018609
Regional Project Id: HG-Claxto-005
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $99,800
Invoiced to Date: $99,800.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on MLK Jr. Dr. from Church St. to N Duval
PI No: PI-0018610
Regional Project Id: HG-Claxto-006
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $19,300
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on Gilmore St. from W Main St. to W James St.
PI No: PI-0018611
Regional Project Id: HG-Claxto-007
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $15,300
Invoiced to Date: $15,300.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on S Spring St. from W Smith St. to W Liberty St.
PI No: PI-0018612
Regional Project Id: HG-Claxto-008
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $36,000
Invoiced to Date: $36,000.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on Marguerite St. from W Liberty St. to Dead End
PI No: PI-0018613
Regional Project Id: HG-Claxto-009
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $23,300
Invoiced to Date: $23,300.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on N Newton St. from W Main St. to W James St.
PI No: PI-0018614
Regional Project Id: HG-Claxto-010
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $66,300
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on N Clark St. from W James St. to Jane St.
PI No: PI-0018615
Regional Project Id: HG-Claxto-011
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $38,900
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on Park Ave. from S College St. to S Ralph St.
PI No: PI-0018616
Regional Project Id: HG-Claxto-012
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $26,200
Invoiced to Date: $26,200.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on Turnpike Rd. from 330’ west of N College St. to City Limit
PI No: PI-0018617
Regional Project Id: HG-Claxto-013
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $184,800
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on N River St. from E Main St. to City Limits
PI No: PI-0018618
Regional Project Id: HG-Claxto-014
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $78,100
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on Goodge St. from Stewart St. to N Ralph St.
PI No: PI-0018619
Regional Project Id: HG-Claxto-015
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $29,902
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on W Smith St. from McLean St. to S Newton St.
PI No: PI-0018620
Regional Project Id: HG-Claxto-016
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $40,600
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on W Smith St. from Spring St. to McLean St.
PI No: PI-0018621
Regional Project Id: HG-Claxto-017
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $37,400
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by milling and resurfacing the existing roadway on Pine St. from McLean St. to S Duval St.
PI No: PI-0018622
Regional Project Id: HG-Daisy-001
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $28,322
Invoiced to Date: $0.00
Project Description: This project aims to resurface 1,050 linear feet of paving on a local, city street. The width of Ellerbee Avenue is 21 Feet. The project would include repaving and re striping of the entire section. The City proposes to use 1.5 inches of asphalt due to the low traffic count. No right-of-way acquisition or environmental disturbances are required.
PI No: PI-0018623
Regional Project Id: HG-Daisy-002
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $17,533
Invoiced to Date: $0.00
Project Description: This project aims to resurface 650 linear feet of paving on a local, city street. The width of East Railroad Street is 21 Feet. The project would include repaving and re striping of the entire section. The City proposes to use 1.5 inches of asphalt due to the low traffic count. No right-of-way acquisition or environmental disturbances are required.
PI No: PI-0018624
Regional Project Id: HG-Daisy-003
County: Evans
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $21,579
Invoiced to Date: $0.00
Project Description: This project aims to resurface 800 linear feet of paving on a local, city street. The width of Ivey Avenue is 21 Feet. The project would include repaving and re striping of the entire section. As proposed, the project would not include modification of existing curbing or any additional curbing. The City proposes to use 1.5 inches of asphalt due to the low traffic count. No right-of-way acquisition or environmental disturbances are required.
PI No: PI-0018625
Regional Project Id: HG-Jeff D-001
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $356,690
Invoiced to Date: $290,810.51
Project Description: This project includes resurfacing the roadway to improve safety and increase PCI rating of the road.
PI No: PI-0018626
Regional Project Id: HG-Jeff D-002
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $709,690
Invoiced to Date: $578,612.47
Project Description: This project includes resurfacing the road to increase safety and PCI rating. This will allow Citizens to travel from Bell Telephone to Ira Graham to Zoar Road towards Baxley and increase connectivity.
PI No: PI-0018627
Regional Project Id: HG-Jeff D-003
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $768,625
Invoiced to Date: $626,662.22
Project Description: This project includes resurfacing the road to increase safety and PCI rating. This will allow Citizens to travel from Hwy 221 to Hwy 268 and increase connectivity.
PI No: PI-0018628
Regional Project Id: HG-Jeff D-004
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $303,578
Invoiced to Date: $247,507.87
Project Description: This project includes resurfacing the road to increase safety and PCI rating. This will allow Citizens to travel from Hwy 341 to Burketts Ferry Rd and increase connectivity.
PI No: PI-0018629
Regional Project Id: HG-Jeff D-005
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $666,536
Invoiced to Date: $0.00
Project Description: This is an existing dirt road that leads from Towns Bluff Road to a landing on the River. This is one of the most popular spots on the river to put a boat or kayak in for fishing and the road is currently dirt. This project will construct 8" of GABC or soil cement and 2" of 9,5 mm Superpave asphalt topping.
PI No: PI-0018630
Regional Project Id: HG-Jeff D-006
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $768,619
Invoiced to Date: $0.00
Project Description: This project includes resurfacing the road to increase safety and PCI rating. This will allow Citizens to travel from Hwy 221 to McEachin Landing Rd and increase connectivity to 341.
PI No: PI-0018631
Regional Project Id: HG-Jeff D-007
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $526,447
Invoiced to Date: $0.00
Project Description: Amanda Thomas is a highly populated County road that is currently partially paved and dirt. The dirt section shall be designed with earth ditches, *' treated base course, and 2" of Superpave asphalt.
PI No: PI-0018632
Regional Project Id: HG-Jeff D-008
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $288,333
Invoiced to Date: $0.00
Project Description: This project includes resurfacing the road to increase safety and PCI rating. This will allow Citizens to travel from Hwy 221 to Hwy 268 and increase connectivity.
PI No: PI-0018633
Regional Project Id: HG-Denton-001
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $9,900
Invoiced to Date: $25,000.00
Project Description: This project is to improve roadway capacity and driver and pedestrian safety by resurfacing on East Georgia Ave.
PI No: PI-0018634
Regional Project Id: HG-Denton-002
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $31,649
Invoiced to Date: $34,000.00
Project Description: This project is to improve roadway capacity and improve driver and pedestrian safety by resurfacing on E. Tennessee Ave.
PI No: PI-0018635
Regional Project Id: HG-Denton-003
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $12,151
Invoiced to Date: $16,000.00
Project Description: This project is to improve drainage, increase roadway capacity and driver and pedestrian safety by resurfacing Smith Street.
PI No: PI-0018636
Regional Project Id: HG-Denton-004
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $33,807
Invoiced to Date: $38,000.00
Project Description: This project is to improve driver and pedestrian safety, drainage, and roadway capacity by resurfacing Loop Road.
PI No: PI-0018637
Regional Project Id: HG-Denton-005
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $16,184
Invoiced to Date: $21,000.00
Project Description: This project is to improve drainage, roadway capacity, and driver and pedestrian safety by resurfacing MLK Street.
PI No: PI-0018638
Regional Project Id: HG-Hazleh-001
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $66,791
Invoiced to Date: $78,169.00
Project Description: Resurface Latimer St
PI No: PI-0018639
Regional Project Id: HG-Hazleh-002
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $82,204
Invoiced to Date: $96,208.00
Project Description: Burketts Ferry Rd Resurface
PI No: PI-0018640
Regional Project Id: HG-Hazleh-003
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $66,791
Invoiced to Date: $78,169.00
Project Description: South Williams St Resurface
PI No: PI-0018641
Regional Project Id: HG-Hazleh-004
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $172,116
Invoiced to Date: $201,436.00
Project Description: Hatten Still Rd Hazlehurst Ga Resurface
PI No: PI-0018642
Regional Project Id: HG-Hazleh-005
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $82,204
Invoiced to Date: $96,208.00
Project Description: S Miller Resurface
PI No: PI-0018643
Regional Project Id: HG-Hazleh-006
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $154,133
Invoiced to Date: $180,390.00
Project Description: Resurface North Miller Street
PI No: PI-0018644
Regional Project Id: HG-Hazleh-011
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $128,444
Invoiced to Date: $0.00
Project Description: N Gill St. Resurface
PI No: PI-0018645
Regional Project Id: HG-Hazleh-012
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $51,378
Invoiced to Date: $0.00
Project Description: Currie St Resurface
PI No: PI-0018646
Regional Project Id: HG-Hazleh-013
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $89,911
Invoiced to Date: $0.00
Project Description: S. Cromartie resurface
PI No: PI-0018647
Regional Project Id: HG-Hazleh-014
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $84,773
Invoiced to Date: $0.00
Project Description: Bell St Resurface
PI No: PI-0018648
Regional Project Id: HG-Hazleh-015
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $87,342
Invoiced to Date: $0.00
Project Description: N railraod st resurface
PI No: PI-0018649
Regional Project Id: HG-Hazleh-016
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $77,067
Invoiced to Date: $0.00
Project Description: S Railroad Resurface
PI No: PI-0018650
Regional Project Id: HG-Hazleh-018
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $92,480
Invoiced to Date: $0.00
Project Description: Red Bird resurface
PI No: PI-0018651
Regional Project Id: HG-Hazleh-007
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $102,756
Invoiced to Date: $0.00
Project Description: Resurface MLK JR Drive
PI No: PI-0018652
Regional Project Id: HG-Hazleh-008
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $32,111
Invoiced to Date: $0.00
Project Description: Resurface West Plum Street from SR 135 to N Miller St
PI No: PI-0018653
Regional Project Id: HG-Hazleh-009
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $164,409
Invoiced to Date: $0.00
Project Description: Resurface Pine Forest and Charles Rogers BLVD
PI No: PI-0018654
Regional Project Id: HG-Hazleh-010
County: Jeff Davis
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $120,224
Invoiced to Date: $0.00
Project Description: Resurface Collins street from Pat Dixon to W Jefferson
PI No: PI-0018655
Regional Project Id: HG-Johnso-001
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $859,375
Invoiced to Date: $7,500.00
Project Description: This project is the second and final phase of the paving of Tucker's Grove Church Road. The first phase, which was part of the initial TIA, consisted of construction between U.S. 319/GA 31 to Rex Jackson Road. The planned second phase will extend construction from Rex Jackson Road to its termination at Idylwild Road. This project will improve roadway capacity and safety, as it is a well-traveled road in western Johnson County.
PI No: PI-0018656
Regional Project Id: HG-Johnso-002
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $281,546
Invoiced to Date: $5,000.00
Project Description: This project will improve roadway capacity on Donovan-Harrison Road from the City Limits of Wrightsville to the Washington County Line by resurfacing the existing roadway with asphalt concrete leveling and adding double surface treatment with sand seal. This road has not been resurfaced in many years.
PI No: PI-0018657
Regional Project Id: HG-Johnso-003
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $950,000
Invoiced to Date: $0.00
Project Description: This project will improve roadway capacity on Gumlog Road between U.S. 319 and U.S. 221 by patching the existing roadway, adding a crack relief interlayer, asphalt concrete leveling, and including double surface treatment pavement with sand seal.
PI No: PI-0018658
Regional Project Id: HG-Johnso-005
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $62,666
Invoiced to Date: $1,450.00
Project Description: This project will improve roadway capacity on Price Williams Road between Minton's Chapel Road and Tom Road by resurfacing the existing roadway and including asphalt concrete leveling and double surface treatment paving with sand seal.
PI No: PI-0018659
Regional Project Id: HG-Adrian-001
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $68,332
Invoiced to Date: $0.00
Project Description: Resurfacing Mill ST from Church ST to Kelly ST for 0.5 mi. Level with 90 lbs OGI for Crack Relief, surface with 135 lbs/SY of 9.5 mm TP II
PI No: PI-0018660
Regional Project Id: HG-Adrian-002
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $85,000
Invoiced to Date: $0.00
Project Description: Resurfacing James ST from Mill ST to North AVE for 0.42 mi. Most of James St has Curb and Gutter, mill existing surface to ensure smooth tie inn - Level with 90 lbs OGI for Crack Relief, surface with 135 lbs/SY of 9.5 mm TP II
PI No: PI-0018661
Regional Project Id: HG-Adrian-003
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $40,717
Invoiced to Date: $0.00
Project Description: Resurfacing Hall ST / W College from US HWY 80 from Church ST to Kelly ST for 0.5 mi. Level with 90 lbs OGI for Crack Relief, surface with 135 lbs/SY of 9.5 mm TP II
PI No: PI-0018662
Regional Project Id: HG-Adrian-004
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $40,000
Invoiced to Date: $0.00
Project Description: Mill and Resurface Nora BLVD from HWY 80 North to Green Street for 0.15 mi. Mill the entire paved right of way in front of shops on the West Side and along all curb and Gutter, GDOT encroachment permit required to tie down clean at HWY 80. Used a 30' AVG width. Pave the entire intersection of W Green to the back of the Radius in all directions. Level with 90 lbs OGI, top with 135 lbs 9.5 TYP II.
PI No: PI-0018663
Regional Project Id: HG-Kite-001
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $35,000
Invoiced to Date: $0.00
Project Description: This project will improve the safety of pedestrians by surfacing sidewalks that connect from an existing sidewalk on Davis Street to run approx. 150 feet to Averett, Street.
PI No: PI-0018664
Regional Project Id: HG-Kite-002
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $15,000
Invoiced to Date: $0.00
Project Description: This project is to resurface the existing roadway within our city cemetery. The current road condition is very poor conditions with a lot of hazards for all pedestrians. Resurfacing this roadway would greatly improve safety for all.
PI No: PI-0018665
Regional Project Id: HG-Kite-003
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $15,000
Invoiced to Date: $0.00
Project Description: This project is to improve the safety for all pedestrians and children by resurfacing the existing roadway being used as a walking/hiking trail. The current condition of the roadway is cracked and very dangerous to elderly persons who use this as a recereational facility.
PI No: PI-0018666
Regional Project Id: HG-Wright-001
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $93,957
Invoiced to Date: $2,500.00
Project Description: Resurfacing on existing street to improve operation and safety for the City of Wrightsville system of streets and roads.
PI No: PI-0018667
Regional Project Id: HG-Wright-002
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $33,909
Invoiced to Date: $1,000.00
Project Description: Resurfacing and re-striping on existing street to improve operation and safety for the City of Wrightsville system of streets and roads.
PI No: PI-0018668
Regional Project Id: HG-Wright-003
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Turn Lanes
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $183,829
Invoiced to Date: $12,500.00
Project Description: Add 400'X12' right turn lane in the westbound direction at an existing entrance driveway into the Johnson County Elementary School. Resurface the existing street with asph conc & re-stripe with thermoplastic pvmt markings.
PI No: PI-0018669
Regional Project Id: HG-Wright-004
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $166,156
Invoiced to Date: $2,500.00
Project Description: Resurfacing & re-striping on existing street to improve operation and safety of the City of Wrightsville system of streets and roads.
PI No: PI-0018670
Regional Project Id: HG-Wright-008
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $141,247
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by making a right turn radius improvement on Hershel Walker Blvd at Lee St, and leveling, resurfacing and re-striping on Hershel Walker Boulevard from the intersection of Lee Street to the intersection of West Elm Street.
PI No: PI-0018671
Regional Project Id: HG-Wright-009
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $86,572
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by leveling, resurfacing and re-striping on Smith Street from the intersection of West Elm Street to the intersection of West Trilby Street.
PI No: PI-0018672
Regional Project Id: HG-Wright-010
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $231,959
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by leveling, resurfacing and re-striping on Industrial Blvd from the intersection of Idylwild Drive to the intersection of South Marcus Street.
PI No: PI-0018673
Regional Project Id: HG-Wright-011
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $110,205
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by leveling, resurfacing and re-striping on Valley Street from the southern most end of pavement to the northern most end of pavement at the W& T Railroad.
PI No: PI-0018674
Regional Project Id: HG-Wright-012
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $29,799
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by leveling, resurfacing and re-striping on Brookwood Street from the intersection of Idylwild Drive to the intersection of South Marcus Street.
PI No: PI-0018675
Regional Project Id: HG-Wright-013
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $19,267
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by leveling, resurfacing and re-striping on Moye Street from the intersection of Delma Street to the intersection of Cook Street.
PI No: PI-0018676
Regional Project Id: HG-Wright-014
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $48,809
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by leveling, resurfacing and re-striping on Cook Street, William Street, & Delma Street from the intersection of Moye Street to the intersection of Parker-Young Street.
PI No: PI-0018677
Regional Project Id: HG-Wright-016
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $105,000
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by grading, draining, base, and paving on Deer Street from the intersection of South Bradford Street to the intersection of South Valley St. This sgement of Deer Street is presently un-improved and serves as access for emergency medical vehicles to transfer to helicopter transport.
PI No: PI-0018678
Regional Project Id: HG-Wright-005
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $100,444
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by milling, leveling, resurfacing and re-striping on Crawford Road from the intersection of Court Street to the intersection of Shurling Drive.
PI No: PI-0018679
Regional Project Id: HG-Wright-006
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $51,635
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by leveling, resurfacing and re-striping on Shurling Drive from the intersection of MLK Drive to the intersection of North Marcus Street.
PI No: PI-0018680
Regional Project Id: HG-Wright-007
County: Johnson
Congressional District: 10
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $40,717
Invoiced to Date: $0.00
Project Description: This project to improve the operation and safety of the City of Wrightsville system of streets and roads by milling adjacent to existing concrete gutters, leveling, resurfacing and re-striping on MLK Drive from the intersection of Crawford Road to the intersection of North Myrtle Street.
PI No: PI-0018681
Regional Project Id: HG-Lauren-010
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,750,000
Invoiced to Date: $0.00
Project Description: Extend US Highway 441 By-Pass across Highway 441 and connect to Southern Pies Road to GA Highway 19. This will consist of turn lanes, widening and signalization improvements.
PI No: PI-0018682
Regional Project Id: HG-Lauren-004
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,736,250
Invoiced to Date: $0.00
Project Description: Resurface existing 4.5 miles of roadway with 165# per SY of 9.5mm asphalt. Widen and resurface remaining 5.5 miles of roadway with 2 feet on each side and resurface completed roadway with 165# per SY of 9.5mm asphalt.
PI No: PI-0018683
Regional Project Id: HG-Lauren-005
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,443,000
Invoiced to Date: $0.00
Project Description: Widen roadway with 2 feet on each side @ 440# per SY and resurface complete roadway with 165# per SY of 9.5mm asphalt.
PI No: PI-0018684
Regional Project Id: HG-Lauren-001
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,848,216
Invoiced to Date: $1,848,216.00
Project Description: Widen roadway with 2 feet on each side and resurface complete roadway with 220# per SY of 9.5mm asphalt.
PI No: PI-0018685
Regional Project Id: HG-Lauren-009
County: Laurens-Johnson-Washington
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,631,215
Invoiced to Date: $0.00
Project Description: Resurface existing 11.4 miles of roadway with 220# per SY of 9.5mm asphalt. Widen and resurface remaining 3.8 miles with 2 feet on each side and resurface completed roadway with 220# per SY of 9.5mm asphalt.
PI No: PI-0018686
Regional Project Id: HG-Lauren-002
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $375,000
Invoiced to Date: $253,344.88
Project Description: Resurface existing roadway with 220# per SY of 9.5mm asphalt
PI No: PI-0018687
Regional Project Id: HG-Lauren-003
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,482,000
Invoiced to Date: $1,472,839.17
Project Description: Widen roadway with 2 feet on each side @ 440# per SY and resurface complete roadway with 220# per SY of 9.5mm asphalt.
PI No: PI-0018688
Regional Project Id: HG-Lauren-006
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $3,010,312
Invoiced to Date: $0.00
Project Description: Resurface existing 6.8 miles of roadway with 220# per SY of 9.5mm asphalt. Widen and resurface remaining 10.6 miles with 2 feet on each side and resurface completed roadway with 165# per SY of 9.5mm asphalt.
PI No: PI-0018689
Regional Project Id: HG-Lauren-007
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $768,763
Invoiced to Date: $0.00
Project Description: Resurface roadway with 165# per SY of 9.5mm asphalt
PI No: PI-0018690
Regional Project Id: HG-Lauren-008
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $550,000
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per SY of 9.5mm asphalt.
PI No: PI-0018691
Regional Project Id: HG-Cadwel-001
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $60,992
Invoiced to Date: $0.00
Project Description: Sidewalk repair on coleman st, from hwy 117 to shirt st.
PI No: PI-0018692
Regional Project Id: HG-Cadwel-002
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $34,558
Invoiced to Date: $0.00
Project Description: Sidewalk repair on walnut st, from hwy 26 to mccook st.
PI No: PI-0018693
Regional Project Id: HG-Cadwel-003
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $15,167
Invoiced to Date: $0.00
Project Description: Sidewalk repair on snowhill st, from cadwell baptist to walnut st
PI No: PI-0018694
Regional Project Id: HG-Cadwel-004
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $99,416
Invoiced to Date: $0.00
Project Description: resurface old eastman rd begins at hwy 117 and ends at hwy 126
PI No: PI-0018695
Regional Project Id: HG-Dexter-001
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $26,896
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by resurfacing from Hwy 257 to just pass Shy street using 185 lbs asphalt per square yard.
PI No: PI-0018696
Regional Project Id: HG-Dexter-002
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $52,600
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by resurfacing from Railroad Street to Harvey Street. The street will be milled 1.5 inches and resurfaced using 185 labs asphalt per square yard.
PI No: PI-0018697
Regional Project Id: HG-Dexter-003
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $70,212
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by resurfacing from Hwy 257 to Smith Road using 185 lbs asphalt per square yard
PI No: PI-0018698
Regional Project Id: HG-Dexter-004
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $63,738
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by resurfacing from Hwy 257 to Smith Road using 185 lbs asphalt per square yard
PI No: PI-0018699
Regional Project Id: HG-Dublin-002
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $13,979,000
Invoiced to Date: $50,759.25
Project Description: Widening of Industrial from US 80 to US 441 including the creation of three lanes raised median section with auxiliary lanes at intersections. Typical section is two 11' travel lanes, 16' raised median, and a 5-8' wide sidewalk on each side of the road. A single lane roundabout will be installed at Walke Dairy to replace an existing all way stop. Existing signals will be converted to mast poles and arms.
PI No: PI-0018700
Regional Project Id: HG-Dublin-003
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roundabout
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,750,000
Invoiced to Date: $327,360.56
Project Description: Installation of a single lane roundabout at existing two way stop controlled intersection.
PI No: PI-0018701
Regional Project Id: HG-Dublin-006
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $3,450,000
Invoiced to Date: $0.00
Project Description: Installation of sidewalk along Shamrock Dr from Hillcrest to Brookwood, Brookwood from Shamrock to Brookhaven, Brookhaven from Brookwood to Hillcrest. Includes curb and gutter, resurfacing, and drainage, and pedestrian creek crossings.
PI No: PI-0018702
Regional Project Id: HG-Dudley-003
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $74,601
Invoiced to Date: $0.00
Project Description: resurfacing of First St from Railroad St to Hwy 80
PI No: PI-0018703
Regional Project Id: HG-Dudley-004
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $67,140
Invoiced to Date: $0.00
Project Description: resurfacing of Third St from Railroad St to Hwy 80
PI No: PI-0018704
Regional Project Id: HG-Dudley-001
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $104,167
Invoiced to Date: $0.00
Project Description: New paving of present dirt streets, Railroad Street from 3rd to 4th, and 4th Street from Railroad to Main.
PI No: PI-0018705
Regional Project Id: HG-East D-012
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $16,698
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018706
Regional Project Id: HG-East D-013
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $21,733
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018707
Regional Project Id: HG-East D-014
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $107,020
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018708
Regional Project Id: HG-East D-015
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $15,413
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018709
Regional Project Id: HG-East D-016
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $10,738
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018710
Regional Project Id: HG-East D-017
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $74,344
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018711
Regional Project Id: HG-East D-018
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $29,542
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018712
Regional Project Id: HG-East D-019
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $32,625
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018713
Regional Project Id: HG-East D-001
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $11,945
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018714
Regional Project Id: HG-East D-002
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $18,650
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018715
Regional Project Id: HG-East D-003
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $8,323
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018716
Regional Project Id: HG-East D-004
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $8,991
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018717
Regional Project Id: HG-East D-005
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $11,560
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018718
Regional Project Id: HG-East D-006
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $34,166
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018719
Regional Project Id: HG-East D-007
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $11,046
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018720
Regional Project Id: HG-East D-008
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $16,184
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018721
Regional Project Id: HG-East D-009
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $43,902
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018722
Regional Project Id: HG-East D-010
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $13,101
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018723
Regional Project Id: HG-East D-011
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $43,928
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018724
Regional Project Id: HG-East D-020
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $25,047
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018725
Regional Project Id: HG-East D-021
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $46,291
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018726
Regional Project Id: HG-East D-022
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $35,836
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018727
Regional Project Id: HG-East D-023
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $95,897
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018728
Regional Project Id: HG-East D-024
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $58,314
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018729
Regional Project Id: HG-East D-025
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $36,864
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018730
Regional Project Id: HG-East D-026
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $10,070
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018731
Regional Project Id: HG-East D-027
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $32,933
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018732
Regional Project Id: HG-East D-028
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $50,453
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018733
Regional Project Id: HG-East D-029
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $11,046
Invoiced to Date: $0.00
Project Description: Resurface existing roadway with 165# per square yard with 9.5mm asphalt.
PI No: PI-0018734
Regional Project Id: HG-Rentz-001
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $40,691
Invoiced to Date: $29,380.23
Project Description: showing serious wear and cracking. Resurface inside City Limits starting at 987 Rentz-Dexter Rd and going 1584 feet to 900 Rentz-Dexter Rd
PI No: PI-0018735
Regional Project Id: HG-Rentz-002
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $92,480
Invoiced to Date: $46,046.73
Project Description: This project is to resurface the .6 tenths of Church St. for safety of citizens and proper road structure.
PI No: PI-0018736
Regional Project Id: HG-Montgo-001
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $981,254
Invoiced to Date: $285,028.36
Project Description: This project is to improve the roadway by resurfacing the entire length of the road (6.46 miles). Resurfacing specifications include: Single Surface Treatment, #7; 40 LB/SY Asphalt Leveling; & 165 LB/SY 12.5MM Ashalt Paving (Cities of Ailey and Higgston will be resurfacing their city streets that join Sawmill Road at their respective city limits.)
PI No: PI-0018737
Regional Project Id: HG-Montgo-002
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $1,184,896
Invoiced to Date: $0.00
Project Description: This project is to improve the roadway by paving the entire length of Jones Road (1.91 miles). Project includes clearing 13.88 acres of the 18.5 acre right-of-way. Project also includes 6 IN Soil Cement Base; Portland Cement; & Triple Surface Treatment. The County already owns 80 FT right-of-way. No right-of-way purchase is needed.
PI No: PI-0018738
Regional Project Id: HG-Ailey-001
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $228,241
Invoiced to Date: $189,470.43
Project Description: This project is to improve the roadway by resurfacing Martin Luther King Jr. from beginning of Ailey city limits to end of Ailey city limits.
PI No: PI-0018739
Regional Project Id: HG-Alston-001
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $184,896
Invoiced to Date: $0.00
Project Description: The purpose of the Wilkes Circle project is to allow better access to homes on this street during times of heavy rain. This street becomes unusable for the home owners when it washes out. Wilkes Circle is located off of Currie Dr. and ties back in to Currie Dr.
PI No: PI-0018740
Regional Project Id: HG-Higgst-001
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $152,993
Invoiced to Date: $57,191.50
Project Description: This project is to improve the roadway by resurfacing Sawmill Road from James Street (HWY15/29) and the end of Higgston city limits.
PI No: PI-0018741
Regional Project Id: HG-Mount -001
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $49,631
Invoiced to Date: $49,578.65
Project Description: Due to the frequent traffic and extensive wear of East Broad Street and the potential safety hazard presented by the deterioration of the road condition, as well as being an access road for the Montgomery County Sheriff's Office, Montgomery County Courthouse and a health clinic, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. East Broad Street is 0.30 miles long and is located between East Church Street and South Railroad Avenue.
PI No: PI-0018742
Regional Project Id: HG-Mount -002
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $121,796
Invoiced to Date: $120,946.60
Project Description: Due to the frequent traffic and extensive wear of South Washington Street and the potential safety hazards presented by the deterioration of the road condition as well the need for South Washington to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. South Washington is 0.75 miles long and is located between Highway 280 and the city limit line.
PI No: PI-0018743
Regional Project Id: HG-Mount -003
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $28,286
Invoiced to Date: $27,941.40
Project Description: Due to the frequent traffic and extensive wear of West Underwood Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for West Underwood Street to be a cut through from South Railroad and South Washington Streets, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. West Underwood Street is 0.16 miles long ans is located between South Railroad Avenue and South Washington Street.
PI No: PI-0018744
Regional Project Id: HG-Mount -004
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $119,380
Invoiced to Date: $117,983.20
Project Description: Due to the frequent traffic and extensive wear of West McKinnon Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for West McKinnon to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. West McKinnon Street is 0.85 miles long is located off of North Washington Street.
PI No: PI-0018745
Regional Project Id: HG-Mount -005
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $71,330
Invoiced to Date: $70,453.80
Project Description: Due to the frequent traffic and extensive wear of West Wooten Street and the potential safety hazard presented by the deterioration of the road condition, as well as the need for West Wooten Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. West Wooten Street is 0.51 miles long and is located off of North Washington Street.
PI No: PI-0018746
Regional Project Id: HG-Mount -011
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $14,977
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of East Days Street and the potential safety hazards presented by the deterioration of the road condition as well as the need for east Days Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. East Days Street is 0.10 miles long and is located off Georgia Highway 221, also known as North Railroad Avenue.
PI No: PI-0018747
Regional Project Id: HG-Mount -012
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $16,340
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of East Edwards Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for East Edwards to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. East Edwards Street is 0.12 miles long and is located between North Temple Street and Old Ailey/Lothair Road.
PI No: PI-0018748
Regional Project Id: HG-Mount -013
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $26,710
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of North Minnie Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for North Minnie Street to be an access road to help to promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. North Minnie Street is 0.19 miles long and is located off of Martin Luther King Drive.
PI No: PI-0018749
Regional Project Id: HG-Mount -014
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $11,940
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of East Pearl Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for East Pearl Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. East Pearl Street is 0.09 miles long and is located Lewis Street and North Minnie Street.
PI No: PI-0018750
Regional Project Id: HG-Mount -015
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $14,800
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of Lewis Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for Lewis Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. Lewis Street is 0.11 miles long and is located between West M.L. King Drive and Old Ailey/Lothair Road.
PI No: PI-0018751
Regional Project Id: HG-Mount -016
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $71,302
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of East Folsum Street and the potential safety hazards presented by the deterioration of the road condtion, as well as the need for East Folsum Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. East Folsum Street is 0.29 miles long and is located off of GA Hwy 280 and GA Hwy 221.
PI No: PI-0018752
Regional Project Id: HG-Mount -017
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $42,690
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear on East Connell Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for East Connell Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. East Connell Street is 0.30 miles long and located between GA Hwy 221 and North Robinson Street.
PI No: PI-0018753
Regional Project Id: HG-Mount -018
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $42,690
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of East Palmer Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for East Palmer Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated.East Palmer Street is 0.30 miles long and is located of GA Hwy 221.
PI No: PI-0018754
Regional Project Id: HG-Mount -019
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $112,856
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of West McRae Drive and the potential safety hazards presented by the deterioration of the road condition, as well as the need for West McRae Drive to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. West McRae Drive is 0.79 miles long and is located between Geiger Street and GA Hwy 280.
PI No: PI-0018755
Regional Project Id: HG-Mount -006
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $41,530
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and the extensive wear of East Mount Vernon Street, and the potential safety hazards presented by the deterioration of the road condition, as well as the need for East Mount Vernon Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. East Mount Vernon Street is 0.20 miles long and is located between State Highway 280 and State Highway 221.
PI No: PI-0018756
Regional Project Id: HG-Mount -007
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $22,810
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of West Mount Vernon Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for West Mount Vernon Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. West Mount Vernon Street is 0.16 miles long and is located off of State Highway 221.
PI No: PI-0018757
Regional Project Id: HG-Mount -008
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $80,591
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of South Railroad Avenue, and the potential safety hazards presented by the deterioration of the road condition, as well as the need for South Railroad Avenue to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. South Railroad Avenue is 0.54 miles long and is located off of Georgia Highway 221.
PI No: PI-0018758
Regional Project Id: HG-Mount -009
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $14,977
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of East Jefferson Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for East Jefferson Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurfaced and rehabilitated. East Jefferson Street is 0.10 miles long and is located off of Georgia Highway 221.
PI No: PI-0018759
Regional Project Id: HG-Mount -010
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $45,778
Invoiced to Date: $0.00
Project Description: Due to the frequent traffic and extensive wear of North Walker Street and the potential safety hazards presented by the deterioration of the road condition, as well as the need for North Walker Street to be an access road to help promote future economic development, the City of Mount Vernon has chosen this road as a project to be resurface and rehabilitated. North Walker Street is 0.31 miles long and is located off of West Martin Luther King Drive.
PI No: PI-0018760
Regional Project Id: HG-Tarryt-001
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $53,430
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by resurfacing on 4th street between Cooper st and city limits.
PI No: PI-0018761
Regional Project Id: HG-Uvalda-001
County: Montgomery
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $260,417
Invoiced to Date: $0.00
Project Description: Resurface, Drainage, Cleaning, Grating, Base, Paving East Oak St, from S 1st St for 2000ft
PI No: PI-0018762
Regional Project Id: HG-Tattna-005
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,842,448
Invoiced to Date: $0.00
Project Description: This project is to improve safety and capacity of the existing dirt road by widening and paving. This road will also provide a connector route from SR178 to SR121 and eliminate some of the traffic at the intersection of these two routes.
PI No: PI-0018763
Regional Project Id: HG-Tattna-001
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,556,702
Invoiced to Date: $1,724,867.03
Project Description: This project is to improve roadway safety by leveling and resurfacing the existing roadway on Baxter Durrence Rd. between SR121 and US301.
PI No: PI-0018764
Regional Project Id: HG-Tattna-002
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $703,501
Invoiced to Date: $186,581.48
Project Description: This project is to improve roadway safety by leveling and resurfacing the existing roadway on Harmony Church Rd. between Loves Chapel Rd. and US301.
PI No: PI-0018765
Regional Project Id: HG-Tattna-003
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $671,304
Invoiced to Date: $168,805.58
Project Description: This project is to improve roadway safety by leveling and resurfacing the existing roadway on Loves Chapel Rd. between Cloverdale Rd. and Harmony Church Rd.
PI No: PI-0018766
Regional Project Id: HG-Tattna-006
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $1,673,100
Invoiced to Date: $0.00
Project Description: This project is to create a connector route from Lynntown Rd. to US280. Traffic currently traveling from north of Reidsville to west of Reidsville must go through the intersection of SR23 and US280. This route will eliminate some of the traffic through this intersection.
PI No: PI-0018767
Regional Project Id: HG-Tattna-007
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $293,160
Invoiced to Date: $0.00
Project Description: This project will increase safety by eliminating a substandard curve and providing a connector between Hencart and Beards Creek Church Roads. It will also shorten the distance between Glennville with the Birdford Community.
PI No: PI-0018768
Regional Project Id: HG-Cobbto-001
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $130,000
Invoiced to Date: $0.00
Project Description: This project is to improve citizen safety and pedestrian walking. Current sidewalks that are eroding away are not only an eye sore but a hazard to bicyclist and young walkers. Sidewalks improve community interaction and public health.
PI No: PI-0018769
Regional Project Id: HG-Cobbto-002
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $26,722
Invoiced to Date: $0.00
Project Description: This project is to improve citizen safety and pedestrian walking. Current sidewalks that are eroding away are not only an eye sore but a hazard to bicyclist and young walkers. Sidewalks improve community interaction and public health.
PI No: PI-0018770
Regional Project Id: HG-Collin-001
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $264,000
Invoiced to Date: $0.00
Project Description: This project will improve the drainage on this busy street as well as make pedestrian traffic safe. The ditch is dangerously deep.
PI No: PI-0018771
Regional Project Id: HG-Glennv-010
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $50,000
Invoiced to Date: $0.00
Project Description: To pave current dirt road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018772
Regional Project Id: HG-Glennv-014
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $15,070
Invoiced to Date: $0.00
Project Description: Church Dr.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, church, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018773
Regional Project Id: HG-Glennv-015
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $119,130
Invoiced to Date: $0.00
Project Description: Henry St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018774
Regional Project Id: HG-Glennv-016
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $16,720
Invoiced to Date: $0.00
Project Description: Holly St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018775
Regional Project Id: HG-Glennv-017
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $34,760
Invoiced to Date: $0.00
Project Description: Liberty St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, church, daycare, businesses, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018776
Regional Project Id: HG-Glennv-018
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $100,000
Invoiced to Date: $0.00
Project Description: To pave current dirt road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018777
Regional Project Id: HG-Glennv-019
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $202,840
Invoiced to Date: $0.00
Project Description: Howard St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, businesses, heavy trucks, school buses, postal carrier, and emergency service vehicles, that travel this road. This roadway connects to SR 144 & SR 25/US 301 and is used as a major thoroughfare. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018778
Regional Project Id: HG-Glennv-020
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $61,270
Invoiced to Date: $0.00
Project Description: Marietta St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018779
Regional Project Id: HG-Glennv-021
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $27,500
Invoiced to Date: $0.00
Project Description: Joe C. Dasher Rd.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, businesses, heavy trucks, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018780
Regional Project Id: HG-Glennv-001
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $105,270
Invoiced to Date: $116,405.82
Project Description: Hencart Road (West): To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, schools (7 grades), businesses, heavy trucks, school buses, postal carrier, and emergency service vehicles, that travel this road. This roadway connects to SR 144 & SR 25/US 301. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018781
Regional Project Id: HG-Glennv-002
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $11,220
Invoiced to Date: $12,364.75
Project Description: Seckinger St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018782
Regional Project Id: HG-Glennv-003
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $33,660
Invoiced to Date: $37,715.00
Project Description: Gross St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, businesses, postal carrier, and emergency service vehicles, that travel this road. This roadway connects to SR 144 in our Downtown District. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018783
Regional Project Id: HG-Glennv-004
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $109,670
Invoiced to Date: $121,119.49
Project Description: Rushing St. (N&S): To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households,business, heavy trucks, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018784
Regional Project Id: HG-Glennv-005
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $12,430
Invoiced to Date: $13,690.04
Project Description: Georgia Avenue: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018785
Regional Project Id: HG-Glennv-006
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $12,430
Invoiced to Date: $13,634.74
Project Description: Virginia Ave.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018786
Regional Project Id: HG-Glennv-007
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $13,090
Invoiced to Date: $14,467.22
Project Description: Boyd St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, church, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018787
Regional Project Id: HG-Glennv-008
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $49,361
Invoiced to Date: $55,338.15
Project Description: Bolton St. To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, businesses, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018788
Regional Project Id: HG-Glennv-009
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $26,950
Invoiced to Date: $29,748.59
Project Description: Dogwood St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018789
Regional Project Id: HG-Glennv-011
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $31,790
Invoiced to Date: $35,074.03
Project Description: Butler St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018790
Regional Project Id: HG-Glennv-012
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $70,840
Invoiced to Date: $78,187.00
Project Description: Abbie Ln.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018791
Regional Project Id: HG-Glennv-013
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $59,290
Invoiced to Date: $65,401.11
Project Description: Jay St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018792
Regional Project Id: HG-Glennv-022
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $103,620
Invoiced to Date: $0.00
Project Description: Auburn Rd.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018793
Regional Project Id: HG-Glennv-023
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $26,620
Invoiced to Date: $0.00
Project Description: Bull St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018794
Regional Project Id: HG-Glennv-024
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $30,690
Invoiced to Date: $0.00
Project Description: Christy St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018795
Regional Project Id: HG-Glennv-025
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $27,060
Invoiced to Date: $0.00
Project Description: Easterling St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018796
Regional Project Id: HG-Glennv-026
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $24,640
Invoiced to Date: $0.00
Project Description: Playland Ave.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville. NOTE: Road to select start point is incorrect. Please see attached map for accurate road.
PI No: PI-0018797
Regional Project Id: HG-Glennv-027
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $237,050
Invoiced to Date: $0.00
Project Description: Cloverdale Rd.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives especially with high truck traffic and thoroughfare. This roadway connects to SR 144 & SR 23/US 301 and is a major thoroughfare for large trucks. Therefore, enhancing the quality of life for the citizens of Glennville. NOTE: Map on app is incorrect.
PI No: PI-0018798
Regional Project Id: HG-Glennv-028
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $39,380
Invoiced to Date: $0.00
Project Description: Mallard Dr.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018799
Regional Project Id: HG-Glennv-029
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $87,450
Invoiced to Date: $0.00
Project Description: Martin Luther King Drive: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018800
Regional Project Id: HG-Glennv-030
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $9,240
Invoiced to Date: $0.00
Project Description: Jones St.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018801
Regional Project Id: HG-Glennv-031
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $10,120
Invoiced to Date: $0.00
Project Description: Kirkland Ave.: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018802
Regional Project Id: HG-Glennv-032
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $37,400
Invoiced to Date: $0.00
Project Description: Homer Waters Rd: To resurface and enhance the condition of the existing road and maintain the integrity of the flow of traffic this road receives. To make sure that this road continues to support the households, school buses, postal carrier, and emergency service vehicles, that travel this road. Therefore, enhancing the quality of life for the citizens of Glennville.
PI No: PI-0018803
Regional Project Id: HG-Glennv-033
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $45,430
Invoiced to Date: $0.00
Project Description: This project is for the resurfacing of Lincoln Street.
PI No: PI-0018804
Regional Project Id: HG-Glennv-034
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $16,500
Invoiced to Date: $0.00
Project Description: This project is for the resurfacing of Brown Lane.
PI No: PI-0018805
Regional Project Id: HG-Glennv-035
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $110,440
Invoiced to Date: $0.00
Project Description: This project is for the resurfacing of Merganser Circle.
PI No: PI-0018806
Regional Project Id: HG-Glennv-036
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $41,580
Invoiced to Date: $0.00
Project Description: This project is to resurface Oak Ridge Drive.
PI No: PI-0018807
Regional Project Id: HG-Manass-002
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $38,533
Invoiced to Date: $40,336.50
Project Description: Beginning at Hwy 292 proceeding 1/4 mile South on Henry Street
PI No: PI-0018808
Regional Project Id: HG-Reidsv-001
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $90,525
Invoiced to Date: $0.00
Project Description: Resurface Alliance St from S Main St to Chandler Ave
PI No: PI-0018809
Regional Project Id: HG-Reidsv-002
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $83,622
Invoiced to Date: $0.00
Project Description: Resurface Willis Ln from Blount St to Ohoopee St
PI No: PI-0018810
Regional Project Id: HG-Reidsv-003
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $114,989
Invoiced to Date: $0.00
Project Description: Resurface Chandler Ave from Eastside Dr for 8ooft
PI No: PI-0018811
Regional Project Id: HG-Reidsv-004
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $140,161
Invoiced to Date: $0.00
Project Description: Resurface Roberta St from E. Brazell St to Griffin Ave
PI No: PI-0018812
Regional Project Id: HG-Reidsv-005
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $317,520
Invoiced to Date: $0.00
Project Description: Resurface Harden Hill Rd from Woodlawn Trl to End
PI No: PI-0018813
Regional Project Id: HG-Reidsv-006
County: Tattnall
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $330,729
Invoiced to Date: $0.00
Project Description: Resurface Savannah Woods Rd from Lynntown Rd to Victory Rd
PI No: PI-0018814
Regional Project Id: HG-Telfai-001
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $214,842
Invoiced to Date: $0.00
Project Description: Road Resurfacing - Patching, Leveling, Asphalt Resurfacing and Pavement Marking of existing 18’ to 22’ existing paved roads. Spring Ave. includes .09 mi of full depth pavement (existing gravel section).
PI No: PI-0018815
Regional Project Id: HG-Telfai-002
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $129,630
Invoiced to Date: $0.00
Project Description: Road Resurfacing - Patching, #7 Chip Seal, Leveling, Double Surface Treatment Resurfacing and Pavement Marking of existing 20’ paved road
PI No: PI-0018816
Regional Project Id: HG-Telfai-003
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $500,000
Invoiced to Date: $0.00
Project Description: Patching, Leveling, Double Surface Treatment Resurfacing and Pavement Marking of existing 22’ paved road
PI No: PI-0018817
Regional Project Id: HG-Telfai-007
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Transit
Band: Multiple (TIA 2)
Original Project Budgeted: $10,000
Invoiced to Date: $0.00
Project Description: 5311 Transit Capital Replacement of Two Vehicles
PI No: PI-0018818
Regional Project Id: HG-Telfai-008
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Transit
Band: Multiple (TIA 2)
Original Project Budgeted: $300,000
Invoiced to Date: $16,299.00
Project Description: Telfair County Transit provides service to citizens throughout Telfair County including the cities of McRae/Helena, Milan, Lumber City and Jacksonville.
PI No: PI-0018819
Regional Project Id: HG-Telfai-004
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $400,000
Invoiced to Date: $0.00
Project Description: Patching, #7 Chip Seal, Leveling, Double Surface Treatment Resurfacing and Pavement Marking of existing 24’ paved
PI No: PI-0018820
Regional Project Id: HG-Telfai-005
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $500,000
Invoiced to Date: $0.00
Project Description: Patching, Leveling, Double Surface Treatment Resurfacing and Pavement Marking of existing 22’ paved road
PI No: PI-0018821
Regional Project Id: HG-Telfai-006
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $113,048
Invoiced to Date: $0.00
Project Description: Patching, #7 Chip Seal, Leveling, Double Surface Treatment Resurfacing and Pavement Marking of existing 20’ paved road
PI No: PI-0018822
Regional Project Id: HG-Lumber-001
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $12,276
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from 341 to Wismer St
PI No: PI-0018823
Regional Project Id: HG-Lumber-002
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $12,277
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from 341 to Wismer St
PI No: PI-0018824
Regional Project Id: HG-Lumber-003
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $10,608
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Erie St to Walnut St
PI No: PI-0018825
Regional Project Id: HG-Lumber-004
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $27,677
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from N Johnson St to MLK Blvd
PI No: PI-0018826
Regional Project Id: HG-Lumber-005
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $17,760
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Cheney St St to McLeod St
PI No: PI-0018827
Regional Project Id: HG-Lumber-006
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $109,935
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from 341 to Ocmulgee St St
PI No: PI-0018828
Regional Project Id: HG-Lumber-007
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $21,065
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from 341 to Church St
PI No: PI-0018829
Regional Project Id: HG-Lumber-008
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $10,147
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Reynolds St to Burns St
PI No: PI-0018830
Regional Project Id: HG-Lumber-009
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $10,276
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Jones St to dead end.
PI No: PI-0018831
Regional Project Id: HG-Lumber-010
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $25,098
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Main St to McLeod St
PI No: PI-0018832
Regional Project Id: HG-Lumber-011
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $39,458
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Johnson St to Pace St
PI No: PI-0018833
Regional Project Id: HG-Lumber-012
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $24,661
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Old Sand Pit Rd to dead end
PI No: PI-0018834
Regional Project Id: HG-Lumber-013
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $40,075
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Red Oak St to dead end
PI No: PI-0018835
Regional Project Id: HG-Lumber-014
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $14,129
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from River St to Murray St
PI No: PI-0018836
Regional Project Id: HG-Lumber-015
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $37,249
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from W Railroad St to Jones St
PI No: PI-0018837
Regional Project Id: HG-Lumber-016
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $12,844
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from 341 to River St
PI No: PI-0018838
Regional Project Id: HG-Lumber-017
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $36,504
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Whiteblough St to Jones St
PI No: PI-0018839
Regional Project Id: HG-Lumber-018
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $8,350
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Clements St to Ware St
PI No: PI-0018840
Regional Project Id: HG-Lumber-019
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $11,945
Invoiced to Date: $0.00
Project Description: This project will increase the PCI rating with resurfacing from Wismer St to dead end
PI No: PI-0018841
Regional Project Id: HG-McRae--001
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $600,000
Invoiced to Date: $0.00
Project Description: This project is an intersection re-design containing multiple design factors. Utility relocation, resurfacing, road and parking lot realignment, new sidewalks, sidewalk repair, striping, signing, and landscaping upgrades
PI No: PI-0018842
Regional Project Id: HG-McRae--003
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $209,984
Invoiced to Date: $0.00
Project Description: This project is a local residential dirt road and is in need of design, drainage, base and paving. This project is a part of McRae Helena's Program to pave all the dirt roads within the City Limits. The project begins at 4th St and the termini is 5th St.
PI No: PI-0018843
Regional Project Id: HG-McRae--004
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $235,363
Invoiced to Date: $0.00
Project Description: This project is a local residential dirt road and is in need of design, drainage, base and paving. This project is a part of McRae Helena's Program to pave all dirts roads within the City Limits. The project begins at 6th St and the termini is the City limits
PI No: PI-0018844
Regional Project Id: HG-McRae--005
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $244,385
Invoiced to Date: $0.00
Project Description: This project is a local dirt road and is in need of design, drainage, base and paving. This project is a part of McRae Helena's Program to pave all dirt roads within the City Limits. The project begins at Lenox Ave and the termini is the City limits
PI No: PI-0018845
Regional Project Id: HG-McRae--006
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $241,917
Invoiced to Date: $0.00
Project Description: This project is a local dirt road and is in need of design, drainage, base and paving. This project is a part of McRae Helena's Program to pave all dirt roads within the City Limits. The project begins at Irwinton Ave and the termini is 9th St
PI No: PI-0018846
Regional Project Id: HG-McRae--007
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $75,480
Invoiced to Date: $0.00
Project Description: This project involves a drainage study including an aerial LiDAR UAV topographic survey and environmental permitting of the drainage basin to determine flows and required upgrades necessary up and downstream. Construction shall include improvements to drainage.
PI No: PI-0018847
Regional Project Id: HG-McRae--009
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $130,524
Invoiced to Date: $110,612.74
Project Description: This project is a residential local road and is in need of repair and resurfacing. This project is a part of McRae Helena's Pavement Management Program. The project begins at 5th Ave and the termini is Willow Creek Ln
PI No: PI-0018848
Regional Project Id: HG-McRae--010
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $160,299
Invoiced to Date: $135,845.60
Project Description: This project is a local residential road and is in need of repair and resurfacing. This project is a part of McRae Helena's Pavement Management Program. The project begins at Albany Ave and the termini is where 6th turns to dirt.
PI No: PI-0018849
Regional Project Id: HG-McRae--011
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $62,501
Invoiced to Date: $52,966.56
Project Description: This project is a local road and is in need of repair and resurfacing. This project is a part of McRae Helena's Pavement Management Program. The project begins at Graham St and the termini is Forsyth Ave
PI No: PI-0018850
Regional Project Id: HG-McRae--012
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $150,108
Invoiced to Date: $133,548.52
Project Description: This project is a local road and is in need of repair and resurfacing with a portion needing design, drainage, base and paving. This project is a part of McRae Helena's Pavement Management Program. The project begins at Albany Ave and the termini is Forsyth Ave
PI No: PI-0018851
Regional Project Id: HG-McRae--014
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $154,569
Invoiced to Date: $130,989.70
Project Description: This project is a road with sidewalks that are damaged and needing repair.
PI No: PI-0018852
Regional Project Id: HG-McRae--015
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $199,238
Invoiced to Date: $168,844.51
Project Description: This project is a sidewalk project on 3rd Ave from College St to Brewton St and Graham St from 3rd Ave to 4th Ave with sidewalks that are damaged and needing repair.
PI No: PI-0018853
Regional Project Id: HG-McRae--016
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $34,020
Invoiced to Date: $28,830.28
Project Description: This project consists of sidewalks that are damaged and needing repair. This project starts at Oak St and ends at Smith Street. As with all sidewalks projects for McRae Helena, we are replacing on both sides of the road
PI No: PI-0018854
Regional Project Id: HG-McRae--017
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $111,132
Invoiced to Date: $94,178.97
Project Description: This project consists of sidewalks that are damaged and needing repair. This project starts at 3rd Ave and ends at Telfair Ave As with all sidewalks projects for McRae Helena, we are replacing on both sides of the road
PI No: PI-0018855
Regional Project Id: HG-McRae--018
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $162,864
Invoiced to Date: $138,019.33
Project Description: This project consists of sidewalks that are damaged and needing repair. This project starts at Hunter Ave and ends at 2nd Ave. As with all sidewalks projects for McRae Helena, we are replacing on both sides of the road
PI No: PI-0018856
Regional Project Id: HG-McRae--008
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Drainage Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $538,017
Invoiced to Date: $0.00
Project Description: This project is a local road in need of resurfacing. The project begins at Albany Ave and the termini is S 1st Ave. This project also involves removing and replacing sidewalks on both sides of the road, culvert repair, and shoulder building for safety.
PI No: PI-0018857
Regional Project Id: HG-Scotla-001
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $70,443
Invoiced to Date: $0.00
Project Description: Oak Ridge Road needs to be paved
PI No: PI-0018858
Regional Project Id: HG-Scotla-002
County: Telfair
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $64,583
Invoiced to Date: $0.00
Project Description: Scotland Town Rd needs to be paved
PI No: PI-0018859
Regional Project Id: HG-Toombs-003
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $863,720
Invoiced to Date: $0.00
Project Description: This is a resurfacing project. This road currently has a PCI rating of 55 and 64 and experiencing extreme wear and tear. Additionally, this is part of the county's Pavement Improvement Plan based on the 2016 Pavement Rating Report. This project will improvement safety and make a major improvement on a county collector road that connects to US 1 which provides access north and south in the county. This project will promote modal options, mitigate congestion & increase economic development.
PI No: PI-0018860
Regional Project Id: HG-Toombs-001
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $933,854
Invoiced to Date: $22,563.26
Project Description: This is a resurfacing and a 2 feet on each side widening project. This road currently has a PCI rating of 60 and is experiencing extreme wear and tear. Additionally, this is part of the county's Pavement Improvement Plan based on the 2016 Pavement Rating Report. This project will improvement safety and make a major improvement on a county collector road that connects to an arterial that provides access to both north and south in the county.
PI No: PI-0018861
Regional Project Id: HG-Toombs-005
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $19,841,000
Invoiced to Date: $11,424.87
Project Description: As a part of the Toombs County Transportation Plan Study, US Hwy 292 will necessitate the addition of two lanes with an available center turning lane. 292, which transverses through Vidalia and Lyons, is a significant economic driver for our community’s future. The regional project also includes the improvement of two major intersections that are noted as chokepoints and heavily congested areas.
PI No: PI-0018862
Regional Project Id: HG-Toombs-002
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,631,155
Invoiced to Date: $39,411.06
Project Description: This is a resurfacing and a 2 feet on each side widening project. This road currently has a PCI rating of range of 56 to 70 and is experiencing extreme wear and tear. Additionally, this is part of the county's Pavement Improvement Plan based on the 2016 Pavement Rating Report. This project will improvement safety and make a major improvement on a county collector road that connects a major street in Lyons. Additionally this road will have direct access to the By-Pass GDOT Project ID 522220.
PI No: PI-0018863
Regional Project Id: HG-Toombs-004
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: New Facility
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $1,487,545
Invoiced to Date: $0.00
Project Description: This is a new construction project that paves an existing dirt road and builds an extension that connects to SR 178 and connects existing county roads that give access from US 1 to SR 280 and SR 292. This will provide economic development, increase modal options and mitgate current and future congestion.
PI No: PI-0018864
Regional Project Id: HG-Lyons-017
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roundabout
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,385,300
Invoiced to Date: $0.00
Project Description: This project will construct a Round-a-Bout at the intersection of Bulldog Road and Parker Street. Bulldog Road and Peker are the main feeder streets for three County Schools. This project will reduce congestion, improve safety and allow for a more even flow of traffic through the area.
PI No: PI-0018865
Regional Project Id: HG-Lyons-001
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $100,000
Invoiced to Date: $119,695.00
Project Description: This project will improve an existing City-Owned Parking Lot between NW Broad Street and the West Columbia Allie. Parking in Downtown Lyons in the north wast block was highlighted in the Cities 2017 visioning project. This project will provide economic stability to the exiting business as well as safe and convenient parking for the Cities Citizens and Visitors to the downtown area. This project is supported by the Lyons Mainstreet Program and its focus on downtown economic development.
PI No: PI-0018866
Regional Project Id: HG-Lyons-002
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $49,014
Invoiced to Date: $58,667.00
Project Description: This project will repair and resurface a section of E. Oglethorpe Avenue from N. State Street to Stewart Lane. This is a major Arterial and collector road and school bus route. This road services many single and multi-family structures. This street received a PCI (Pavement Condition Index) of 52 and is part of our overall Paving Maintenance plan.
PI No: PI-0018867
Regional Project Id: HG-Lyons-007
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $11,611
Invoiced to Date: $13,898.00
Project Description: This project will repair and resurface arterial and collector roads inside the Lakewood Heights Subdivision, more specifically described as 4th Avenue. These roads serve approximately 30 single-family residences. This street received a PCI (Pavement Condition Index) of 27 and is part of our overall Paving Maintenance plan.
PI No: PI-0018868
Regional Project Id: HG-Lyons-008
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $11,021
Invoiced to Date: $13,192.00
Project Description: This project will repair and resurface arterial and collector roads inside the Lakewood Heights Subdivision, more specifically described as 3rd Avenue. These roads serve approximately 30 single-family residences. This street received a PCI (Pavement Condition Index) of 6 and is part of our overall Paving Maintenance plan.
PI No: PI-0018869
Regional Project Id: HG-Lyons-009
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $46,600
Invoiced to Date: $55,778.00
Project Description: This project will repair and resurface arterial and collector roads inside the Lakewood Heights Subdivision more specifically described as Collins St. These roads serve approximately 30 single-family residences. This street received a PCI (Pavement Condition Index) of 40 and is part of our overall Paving Maintenance plan.
PI No: PI-0018870
Regional Project Id: HG-Lyons-010
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $34,038
Invoiced to Date: $40,742.00
Project Description: This project will repair and resurface arterial and collector roads inside the Lakewood Heights Subdivision more specifically described as 2nd Avenue. These roads serve approximately 30 single-family residences. This street received a PCI (Pavement Condition Index) of 62 and is part of our overall Paving Maintenance plan.
PI No: PI-0018871
Regional Project Id: HG-Lyons-011
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $53,536
Invoiced to Date: $64,080.00
Project Description: This project will repair and resurface arterial and collector roads inside the Lakewood Heights Subdivision more specifically described as Mary Street. These roads serve approximately 30 single-family residences. This street received a PCI (Pavement Condition Index) of 51 and is part of our overall Paving Maintenance plan.
PI No: PI-0018872
Regional Project Id: HG-Lyons-016
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Striping
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $26,515
Invoiced to Date: $31,737.00
Project Description: This project will re-strip approximately 20,000 linear feet of arterial and collector roads inside the city limits to improve safety for those who travel.
PI No: PI-0018873
Regional Project Id: HG-Vidali-002
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: New Facility
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $198,000
Invoiced to Date: $0.00
Project Description: This project involves construction a new paved surface that will used for parking. Currently, cars park in these non-paved, un-striped areas as the photos show. The project will include the design of the two specified areas including drainage, parking layout, base and paving.
PI No: PI-0018874
Regional Project Id: HG-Vidali-011
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $104,167
Invoiced to Date: $0.00
Project Description: This project is a residential compacted rock roadway and is in need of design, drainage, base, and paving. This project is a part of Vidalia Pavement Management Program. The project begins at Center Dr and the termini is a dead end
PI No: PI-0018875
Regional Project Id: HG-Vidali-012
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $55,673
Invoiced to Date: $0.00
Project Description: This project is a residential road holding a current PCI rating of 52 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at N Maple Dr and the termini is N Maple Dr
PI No: PI-0018876
Regional Project Id: HG-Vidali-013
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $31,683
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair milling and inlay resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Church St and the termini is Bay St.
PI No: PI-0018877
Regional Project Id: HG-Vidali-014
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $16,646
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at McSwain Dr and the termini is Linda Ln
PI No: PI-0018878
Regional Project Id: HG-Vidali-015
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $41,377
Invoiced to Date: $0.00
Project Description: This project is a residential road holding a current PCI rating of 51 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at 280 and the termini is Teston Dr
PI No: PI-0018879
Regional Project Id: HG-Vidali-016
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $52,353
Invoiced to Date: $0.00
Project Description: This project is a residential road holding a current PCI rating of 52 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Broadfoot Blvd and the termini is Lively St
PI No: PI-0018880
Regional Project Id: HG-Vidali-017
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Striping
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $110,000
Invoiced to Date: $0.00
Project Description: City wide thermoplastic striping. The City would like to use $150,000 for thermoplastic striping around the City.
PI No: PI-0018881
Regional Project Id: HG-Vidali-018
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $56,644
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Hwy 130 and the termini is Hwy 130
PI No: PI-0018882
Regional Project Id: HG-Vidali-019
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $59,881
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at NE Main St and the termini is North St E
PI No: PI-0018883
Regional Project Id: HG-Vidali-020
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $67,271
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at dead end and the termini is Arnau St
PI No: PI-0018884
Regional Project Id: HG-Vidali-021
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $73,367
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Adams St and the termini is the dead end
PI No: PI-0018885
Regional Project Id: HG-Vidali-022
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $74,652
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Rigsbee Dr and the termini is Waters Dr
PI No: PI-0018886
Regional Project Id: HG-Vidali-023
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $59,598
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Dead end and the termini is McIntosh St
PI No: PI-0018887
Regional Project Id: HG-Vidali-025
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $69,206
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Hwy 130 and the termini is dirt
PI No: PI-0018888
Regional Project Id: HG-Vidali-026
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $70,619
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Ross Way and the termini is Hwy 15
PI No: PI-0018889
Regional Project Id: HG-Vidali-001
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $965,700
Invoiced to Date: $54,044.00
Project Description: This project will improve mobility, safety. This allows citizens to travel from Stockyard Road to McNatt St towards the Hospital. This project shall be completed in conjunction with Vidalia Project 001.
PI No: PI-0018890
Regional Project Id: HG-Vidali-003
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $41,480
Invoiced to Date: $41,480.00
Project Description: This project is a residential road holding a current PCI rating of 51 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Epstein and the termini is Grand St.
PI No: PI-0018891
Regional Project Id: HG-Vidali-004
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $62,676
Invoiced to Date: $62,676.00
Project Description: This project is a residential road holding a current PCI rating of 51 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Church St and the termini is Bay St.
PI No: PI-0018892
Regional Project Id: HG-Vidali-005
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $47,262
Invoiced to Date: $47,262.00
Project Description: This project is a residential road holding a current PCI rating of 48 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at the Clyde Blvd and the termini is where the pavement turns to dirt. This project has multiple areas in need of deep patching due to truck traffic..
PI No: PI-0018893
Regional Project Id: HG-Vidali-006
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $186,953
Invoiced to Date: $186,953.00
Project Description: This project is a Collector road holding a current PCI rating of 51 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Hwy 280 and the termini is Harris Industrial Blvd.
PI No: PI-0018894
Regional Project Id: HG-Vidali-007
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $67,919
Invoiced to Date: $67,919.00
Project Description: This project is a residential road holding a current PCI rating of 51 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at the Harris Industrial Blvd and the termini is the cul de sac. This project has multiple areas in need of deep patching due to truck traffic.
PI No: PI-0018895
Regional Project Id: HG-Vidali-008
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $70,751
Invoiced to Date: $70,751.00
Project Description: This project is a residential road holding a current PCI rating of 47 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at 292 and the termini is West Grossman Dr.
PI No: PI-0018896
Regional Project Id: HG-Vidali-009
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $31,520
Invoiced to Date: $31,520.00
Project Description: This project is a residential road holding a current PCI rating of 51 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Church St and the termini is Bay St.
PI No: PI-0018897
Regional Project Id: HG-Vidali-010
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $14,643
Invoiced to Date: $14,643.00
Project Description: This project is a residential road holding a current PCI rating of 51 and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Charles Dr and the termini is Darby Dr.
PI No: PI-0018898
Regional Project Id: HG-Vidali-027
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $85,875
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Us 280 and the termini is the cul de sac
PI No: PI-0018899
Regional Project Id: HG-Vidali-028
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $67,408
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Tap Dr and the termini is W Grossman St
PI No: PI-0018900
Regional Project Id: HG-Vidali-029
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $59,547
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Morris St and the termini is Lively St
PI No: PI-0018901
Regional Project Id: HG-Vidali-031
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $66,945
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Manor Dr and the termini is Prosperity Ln
PI No: PI-0018902
Regional Project Id: HG-Vidali-032
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $56,284
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at North St and the termini is dead end
PI No: PI-0018903
Regional Project Id: HG-Vidali-033
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $58,370
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at Rimando Dr and the termini is Rimando Dr
PI No: PI-0018904
Regional Project Id: HG-Vidali-034
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $86,083
Invoiced to Date: $0.00
Project Description: This project is a residential road and is in need of repair and resurfacing. This project is a part of Vidalia Pavement Management Program. The project begins at US 280 and the termini is Waters Dr
PI No: PI-0018905
Regional Project Id: HG-Vidali-035
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $77,164
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018906
Regional Project Id: HG-Vidali-036
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $33,212
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018907
Regional Project Id: HG-Vidali-037
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $69,175
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018908
Regional Project Id: HG-Vidali-038
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $16,200
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018909
Regional Project Id: HG-Vidali-039
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $8,036
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018910
Regional Project Id: HG-Vidali-040
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $12,857
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018911
Regional Project Id: HG-Vidali-041
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $7,366
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018912
Regional Project Id: HG-Vidali-042
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $25,151
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018913
Regional Project Id: HG-Vidali-043
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $35,784
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018914
Regional Project Id: HG-Vidali-044
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $33,882
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018915
Regional Project Id: HG-Vidali-045
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $15,803
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018916
Regional Project Id: HG-Vidali-046
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $12,723
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018917
Regional Project Id: HG-Vidali-047
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $18,728
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018918
Regional Project Id: HG-Vidali-048
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $116,233
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018919
Regional Project Id: HG-Vidali-049
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $6,563
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018920
Regional Project Id: HG-Vidali-050
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $9,910
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018921
Regional Project Id: HG-Vidali-051
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $62,597
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018922
Regional Project Id: HG-Vidali-052
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $41,896
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018923
Regional Project Id: HG-Vidali-053
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $30,346
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018924
Regional Project Id: HG-Vidali-054
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $32,275
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018925
Regional Project Id: HG-Vidali-055
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $65,049
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018926
Regional Project Id: HG-Vidali-056
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $62,619
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018927
Regional Project Id: HG-Vidali-057
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $39,617
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018928
Regional Project Id: HG-Vidali-058
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $36,590
Invoiced to Date: $0.00
Project Description: Road Resurface
PI No: PI-0018929
Regional Project Id: HG-Treutl-003
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $455,620
Invoiced to Date: $0.00
Project Description: Resurfacing of Cedar Grove Road from Montgomery County line to Ball Park Road/Soperton City Limits for a distance of 3.8 miles. The project includes Patching , #89 Chip Seal, Leveling, Double Surface Treatment Resurfacing with Sand Seal, and Pavement Marking of existing 24' paved road.
PI No: PI-0018930
Regional Project Id: HG-Treutl-005
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $95,920
Invoiced to Date: $0.00
Project Description: Resurfacing of Holtons Chapel Road from SR 297 to Harley Lane for a distance of 0.8 miles. The project includes Patching , #89 Chip Seal, Leveling, Double Surface Treatment Resurfacing and Pavement Marking of existing 20' paved road.
PI No: PI-0018931
Regional Project Id: HG-Treutl-001
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $419,650
Invoiced to Date: $0.00
Project Description: Resurfacing of Orianna Road from SR 15 to Laurens County line for a distance of 3.5 miles. The project includes Patching , #89 Chip Seal, Leveling, Double Surface Treatment Resurfacing and Pavement Marking of existing 20' paved road.
PI No: PI-0018932
Regional Project Id: HG-Treutl-002
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $467,610
Invoiced to Date: $0.00
Project Description: Resurfacing of Norristown Road from Crooked Run Road to US221 for a distance of 3.9 miles. The project includes Patching , #89 Chip Seal, Leveling, Double Surface Treatment Resurfacing with Sand Seal, and Pavement Marking of existing 21' paved road.
PI No: PI-0018933
Regional Project Id: HG-Sopert-004
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $60,000
Invoiced to Date: $0.00
Project Description: THIS IS A RESURFACING PROJECT FOR SARABELLE AVENUE BEGINNING AT W LOUISIANA AVENUE AND ENDING AT ABRAMS STREET.
PI No: PI-0018934
Regional Project Id: HG-Sopert-005
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $25,000
Invoiced to Date: $0.00
Project Description: THIS IS A RESURFACING PROJECT ON GLENN STREET BEGINNING AT WEST LOUISIANA AVENUE AND ENDING AT SARABELLE AVENUE.
PI No: PI-0018935
Regional Project Id: HG-Sopert-006
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $31,500
Invoiced to Date: $0.00
Project Description: THIS IS A RESURFACING PROJECT ON MANNING STREET BETWEEN WEST GEORGIA AVENUE AND WEST MISSISSIPPI AVENUE.
PI No: PI-0018936
Regional Project Id: HG-Sopert-001
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $400,000
Invoiced to Date: $21,057.25
Project Description: This project is to grade, drain, base and pave Evans Street between Old Diary Road and Louisiana Avenue.
PI No: PI-0018937
Regional Project Id: HG-Sopert-002
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $500,000
Invoiced to Date: $0.00
Project Description: This project is to grade, drain, base and pave Windcrest Drive between Windy Hill Road and Cascade Circle.
PI No: PI-0018938
Regional Project Id: HG-Sopert-003
County: Treutlen
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $200,000
Invoiced to Date: $0.00
Project Description: This project is to grade drain base pave Abrams Street between Sarabelle Avenue and Evans Street.
PI No: PI-0018939
Regional Project Id: HG-Wayne-003
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Intersection Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $6,000,000
Invoiced to Date: $86,320.83
Project Description: As part of Wayne County's overall economic development plan, US 301 South needs major improvements. While the road section is adequate for the most part, intersections at Sunset Blvd, Airport Road, and others need to be modified to meet increased demands created by industrial development in the Sunset Blvd area as well as the local airport access road. A major problem exists at Sunset Blvd and US 301 where trucks have a problem turning onto US 301.
PI No: PI-0018940
Regional Project Id: HG-Wayne-001
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $4,000,000
Invoiced to Date: $395,407.03
Project Description: Wayne County is dedicating significant resources to improving economic development in the area. This project will improve one of the routes that truck traffic uses to leave an existing industrial park and access the developmental highway system in all directions. The road will be widened with center turn lanes and intersection improvements. Areas where turn lanes are not needed will be widened and resurfaced.
PI No: PI-0018941
Regional Project Id: HG-Wayne-002
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,023,600
Invoiced to Date: $217,424.39
Project Description: Wayne County is developing a new industrial park west of Jesup. This project is to construct an entrance road from US 84 into the industrial park and provide a road that can be accessed by the network of roads needed to fully develop the park. This road will connect to an extension of S. Macon St. in Jesup as part of an overall plan to provide secondary access and egress to an existing, smaller industrial park in the western part of Jesup.
PI No: PI-0018942
Regional Project Id: HG-Wayne-004
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $1,616,300
Invoiced to Date: $0.00
Project Description: As part of Wayne County's economic development plan, it is necessary to prevent truck traffic from going into Jesup to access US 84 and US 341. Three-laning with center turn lanes Hinson Mosely Road and Joey Williamson Road (a separate proposed TSPLOST(2) project) with intersection improvements will allow truck traffic to directly access these highways and improve safety along Hinson Mosely Rd.
PI No: PI-0018943
Regional Project Id: HG-Wayne-005
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $2,000,000
Invoiced to Date: $0.00
Project Description: As part of Wayne County's economic development plan, it is necessary to prevent truck traffic from the existing industrial park from going into Jesup to access US 84 and US 341. Three-laning with center turn lanes Joey Williamson Road and Hinson Moseley Road (a separate proposed TSPLOST(2) project) with intersection improvements will allow truck traffic to directly access these highways and improve school traffic safety.
PI No: PI-0018944
Regional Project Id: HG-Wayne-101
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,770,000
Invoiced to Date: $0.00
Project Description: This road is a major arterial and collector road and school bus route. It is proposed to widen the road with 2 ft shoulders, left & right. This will restore the condition of the road and reduce edge deterioration while improving safety along the route.
PI No: PI-0018945
Regional Project Id: HG-Wayne-102
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,750,000
Invoiced to Date: $0.00
Project Description: This road is a major arterial and collector road and school bus route. It is proposed to widen the road with 2 ft shoulders, left & right. This will restore the condition of the road and reduce edge deterioration while improving safety along the route.
PI No: PI-0018946
Regional Project Id: HG-Wayne-103
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $1,342,519
Invoiced to Date: $0.00
Project Description: This road is a major arterial and collector road and school bus route. It is proposed to widen the road with 2 ft shoulders, left & right. This will restore the condition of the road and reduce edge deterioration while improving safety along the route.
PI No: PI-0018947
Regional Project Id: HG-Wayne-104
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $2,080,019
Invoiced to Date: $0.00
Project Description: This road is a major arterial and collector road and school bus route. It is proposed to widen the road with 2 ft shoulders, left & right. This will restore the condition of the road and reduce edge deterioration while improving safety along the route.
PI No: PI-0018948
Regional Project Id: HG-Wayne-106
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $970,000
Invoiced to Date: $0.00
Project Description: This road is a major arterial and collector road, school bus route, and portion of a cut-thru for truck traffic leaving US 341 at Gardi heading to the Broadhurst sanitary landfill. It is proposed to widen the road with 2 ft shoulders, left & right. This will restore the condition of the road and reduce edge deterioration while improving safety along the route.
PI No: PI-0018949
Regional Project Id: HG-Jesup-001
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Roadway Project
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,900,000
Invoiced to Date: $574,791.89
Project Description: An extension of South Macon Street will connect to Wayne County's new industrial park. This project is part of an overall plan to increase economic development in Jesup and Wayne County. This project will provide access to and from US 84 / SR 38 through the new industrial park for trucks leaving and entering the existing industrial developed areas in Jesup. This will greatly reduce the ever increasing truck traffic on Sunset Blvd and congestion at the intersection of US 84 / SR 38 in Jesup.
PI No: PI-0018950
Regional Project Id: HG-Jesup-002
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $412,500
Invoiced to Date: $0.00
Project Description: Sunset Blvd is a major connector street in Jesup. This project will widen and resurface the portion bewteen US 84 / SR 38 and US 341 / SR 27. This work will improve safety through the area while also improving the pavement structure to properly handle the high volume of traffic experienced daily. This project will improve economic development in the area by improving access through the area.
PI No: PI-0018951
Regional Project Id: HG-Jesup-003
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $234,991
Invoiced to Date: $0.00
Project Description: Great Southern Way is a heavily used street that provides access to and from several industrial complexes in the existing Wayne County Industrial Park which is located within the City limits of Jesup. This project includes widening the street to 24' and resurfacing. Also, a load secure lane will be added to eliminate congestion as trucks leave the area. This project will support the economic development plan being considered throughout the area.
PI No: PI-0018952
Regional Project Id: HG-Jesup-004
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $123,677
Invoiced to Date: $0.00
Project Description: South Sixth Street is showing serious wear and cracking. In order to restore it to safe, durable operating condition, the street should be resurfaced following standard GDOT specifications.
PI No: PI-0018953
Regional Project Id: HG-Jesup-005
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $280,019
Invoiced to Date: $0.00
Project Description: North Fourth Street is the major access to Martha Rawls Smith Elementary School. The existing road is not designed to handle the increased traffic created by construction of the new school a couple years ago. This project will widen the road to 24' and resurface the entire width of the widened road. This will improve traffic safety and provide structural integrity of the road into the future.
PI No: PI-0018954
Regional Project Id: HG-Jesup-007
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $240,000
Invoiced to Date: $0.00
Project Description: Cherry Street is the main street through Jesup. This project will cover milling and resurfacing areas with parking along the sides and widening the remaining portions of the eastern section of the street to 24' and resurfacing with proper slope and thickness. This will eliminate cracking and restore the surface to proper condition and allow the street to be returned to normal, designed operation to help ensure safety of vehicles using it.
PI No: PI-0018955
Regional Project Id: HG-Jesup-008
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $322,216
Invoiced to Date: $0.00
Project Description: Cherry Street is the main street through Jesup. This project will cover milling and resurfacing areas with parking along the sides and widening the remaining portions of the western section of the street to 24' and resurfacing with proper slope and thickness. This will eliminate cracking and restore the surface to proper condition and allow the street to be returned to normal, designed operation to help ensure safety of vehicles using it.
PI No: PI-0018956
Regional Project Id: HG-Jesup-006
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $352,500
Invoiced to Date: $0.00
Project Description: Cowboy Road is the second route which provides access to Martha Rawls Smith Elementary School. Traffic on this road comes from the northwestern part of the county and is used by many as a cut through to get to US 84 / SR 38 and the businesses in that area, i.e., Walmart and several other businesses and restaurants. Widening and resurfacing the road will improve safety along the route particularly around the school site. Several school busses use this route to and from the school.
PI No: PI-0018957
Regional Project Id: HG-Odum-001
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $52,097
Invoiced to Date: $61,277.00
Project Description: Roberson Road is deteriorating to the point that resurfacing is required to reduce the possibility of major repairs in the future. This project will resurface the street and keep it in good, serviceable condition.
PI No: PI-0018958
Regional Project Id: HG-Odum-002
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $40,740
Invoiced to Date: $47,919.00
Project Description: Carter Street is deteriorating to the point that resurfacing is required to reduce the possibility of major repairs in the future. This project will resurface the street and keep it in good, serviceable condition.
PI No: PI-0018959
Regional Project Id: HG-Odum-004
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $94,391
Invoiced to Date: $106,844.08
Project Description: East Railroad Street is deteriorating to the point that resurfacing is required to reduce the possibility of major repairs in the future. This project will resurface the street and keep it in good, serviceable condition.
PI No: PI-0018960
Regional Project Id: HG-Odum-007
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $11,400
Invoiced to Date: $13,409.00
Project Description: First Lane is deteriorating to the point that resurfacing is required to reduce the possibility of major repairs in the future. This project will resurface the street and keep it in good, serviceable condition.
PI No: PI-0018961
Regional Project Id: HG-Screve-001
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $31,000
Invoiced to Date: $0.00
Project Description: Florie Street is deteriorating to the point that resurfacing is required to reduce the possibility of major repairs in the future. This project will resurface the street and keep it in good, serviceable condition.
PI No: PI-0018962
Regional Project Id: HG-Screve-002
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $109,435
Invoiced to Date: $0.00
Project Description: Martha Street is deteriorating to the point that resurfacing is required to reduce the possibility of major repairs in the future. This project will resurface the street and keep it in good, serviceable condition.
PI No: PI-0018963
Regional Project Id: HG-Screve-003
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $114,608
Invoiced to Date: $0.00
Project Description: The paved portion of Sikes Road is deteriorating to the point that resurfacing is required to reduce the possibility of major repairs in the future. This project will resurface the street and keep it in good, serviceable condition. An extension will also be constructed from the end of the existing pavement to the WWTP entrance.
PI No: PI-0018964
Regional Project Id: HG-Screve-005
County: Wayne
Congressional District: 1
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $57,000
Invoiced to Date: $0.00
Project Description: Brown Street is deteriorating to the point that resurfacing is required to reduce the possibility of major repairs in the future. This project will resurface the street and keep it in good, serviceable condition.
PI No: PI-0018965
Regional Project Id: HG-Wheele-001
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,124,954
Invoiced to Date: $0.00
Project Description: Resurface Springhill from Hwy 280 to Sandpit 52,272 ft and Resurface Sandpit from Springhill to County Line 17424 ft
PI No: PI-0018966
Regional Project Id: HG-Alamo-001
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $48,809
Invoiced to Date: $37,119.94
Project Description: This project is to improve roadway capacity and safety by resurfacing the existing road. This will ensure safety,security,and will maximize the value of Georgia's assets.This section of road begins at US 280 and North Pine Street and ends at North Pine and Pearl Street.
PI No: PI-0018967
Regional Project Id: HG-Alamo-002
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $151,200
Invoiced to Date: $0.00
Project Description: This project is to improve road capacity and safety by resurfacing the existing road , This will ensure safety ,security, and will maximize the value of Georgia's assets. This section of road begins at state road 126 and West Pearl Street and ends at West Pearl and North Broad Street.
PI No: PI-0018968
Regional Project Id: HG-Alamo-003
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $189,840
Invoiced to Date: $130,672.48
Project Description: This project is to improve roadway capacity and safety by resurfacing the existing road . This will ensure safety , security , and maximize the value of Georgia's assets. This section of road begins at US 280 and South Broad Street and ends just past the intersection of Fourth street and South Broad Street.
PI No: PI-0018969
Regional Project Id: HG-Alamo-004
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $48,090
Invoiced to Date: $39,003.04
Project Description: This project is to improve roadway capacity and safety by resurfacing the existing road . This will ensure safety , security , and will maximize the value of Georgia's assets . This section of road begins at West Railroad Avenue and North Jefferson Street and ends at Stubbs Street and North Jefferson Street.
PI No: PI-0018970
Regional Project Id: HG-Alamo-005
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Grade Drain Base and Pave
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $330,480
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by widening the existing road and paving it .This will ensure safety ,security,and maximize the value of Georgia's assets.This section of road begins at North Broad and Towns Avenue and ends on Towns Avenue,
PI No: PI-0018971
Regional Project Id: HG-Alamo-006
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $120,000
Invoiced to Date: $0.00
Project Description: This project is to improve sidewalk and pedestrian safety by replacing existing sidewalk. This will add value to the city and Georgia's assets. This section of sidewalk begins at the corner of GA highway 126 and East Railroad Street and ends at the corner of East Railroad Street and Pine Street.
PI No: PI-0018972
Regional Project Id: HG-Alamo-007
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $52,500
Invoiced to Date: $23,579.89
Project Description: This project is to improve roadway capacity and safety by resurfacing the existing road. This will ensure safety , security, and maximize the value of Georgia's assets. This section of road begins at highway 126 and East Stubbs street and ends at Est Stubbs Street and North Broad street6..
PI No: PI-0018973
Regional Project Id: HG-Alamo-009
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $106,000
Invoiced to Date: $84,021.10
Project Description: This project is improve roadway capacity and safety by resurfacing the existing road. This will ensure safety, security,and maximize the value of Georgia's assets. This section of road begins at Pearl Street and McRae Street and ends at McRae street and Stubbs Street.
PI No: PI-0018974
Regional Project Id: HG-Alamo-010
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $133,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by resurfacing the existing road. This will ensure safety, security, and maximize the value Georgia's assets. This section of begins at US 280 and South Jefferson Street and ends at South Jefferson Street and 3rd Street.
PI No: PI-0018975
Regional Project Id: HG-Alamo-011
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $71,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by resurfacing the existing road. This will ensure safety, security, and maximize the value of Georgia's assets. This section of road begins at 1st Street and Magnolia Lane and ends at Magnolia Lane and Maple Street.
PI No: PI-0018976
Regional Project Id: HG-Glenwo-001
County: Wheeler
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $212,993
Invoiced to Date: $0.00
Project Description: New Construction of Side walks 5 foot x 3300 ft from intersection Hwy 280 connector to Apple Apartment Complexes.
PI No: PI-0018977
Regional Project Id: HG-Wilcox-001
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Surface Treat
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,052,000
Invoiced to Date: $0.00
Project Description: This project is to improve road conditions to allow for heavier traffic for farm to warehouse transportation. The project will begin at the Rochelle City Limits and end at the Crisp County Line. The road will leveled with asphalt pavement and resurfaced with double surface treatment with sand seal. The deteriorated corrugated metal pipes will be replaced as part of this project.
PI No: PI-0018978
Regional Project Id: HG-Wilcox-007
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $680,817
Invoiced to Date: $0.00
Project Description: This project is to improve the roadway capacity and safety by resurfacing the existing roadway from US 280 in Seville to Cardinal Road. This road is used extensively by large agricultural equipment.
PI No: PI-0018979
Regional Project Id: HG-Abbevi-001
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $120,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by asphalt leveling and resurfacing. Bowen Street is a main collector street in the City of Abbeville as it carries traffic from the county into the City. The project begins at McCampbell Street and extends to the City Limits. This section of roadway is used extensively during the harvest season by local farmers bringing their crop to town and to carry rural families to their homes.
PI No: PI-0018980
Regional Project Id: HG-Abbevi-002
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $80,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by asphalt leveling and resurfacing. Irwinville Road is a main collector street in the City of Abbeville as it carries traffic from the county into the City. The project begins at Bowen Street and extends to the City Limits. This section of roadway is used extensively during the harvest season by local farmers bringing their crop to town and to carry rural families to their homes.
PI No: PI-0018981
Regional Project Id: HG-Abbevi-003
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $275,434
Invoiced to Date: $0.00
Project Description: This project is to improve the roadway capacity and safety by asphalt leveling, resurfacing, and constructing a sidewalk to the Half Moon Boat Landing and the Half Moon Walking Trail located on the banks of the Ocmulgee River. The project will begin at SR 280/E Main Street and end at the boat ramp. This roadway is used by local residents as well as out of town visitors. This is a destination point for the City of Abbeville.
PI No: PI-0018982
Regional Project Id: HG-Abbevi-004
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $123,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by asphalt leveling and resurfacing this section of Industrial Drive. This project begins at SR 280/W Main Street and ends at Cannonville Road. This road is used by local traffic as minor bypass to keep from going into downtown Abbeville.
PI No: PI-0018983
Regional Project Id: HG-Abbevi-005
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Shoulder Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $290,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway capacity and safety by widening the existing roadway by 2 feet on each side, asphalt leveling and resurfacing on Poor Robin Road beginning at US 129/N Broad Street and ending at the City Limits. This roadway is used primarily by local residents with the exception of Poor Robin Water Company. Poor Robin Water Company bottles and sells spring water. This business is expected to continue to grow in the future and increased traffic should be expected.
PI No: PI-0018984
Regional Project Id: HG-Abbevi-006
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $52,405
Invoiced to Date: $0.00
Project Description: This project is to improve safety by resurfacing and striping Airport road from S Broad St to Bowen St.
PI No: PI-0018985
Regional Project Id: HG-Abbevi-007
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $40,357
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing and striping Wells Ave from S Broad St to Bowen St.
PI No: PI-0018986
Regional Project Id: HG-Abbevi-008
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $38,148
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing and striping W Pine ST from Bell St to Bowen St.
PI No: PI-0018987
Regional Project Id: HG-Abbevi-009
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $30,441
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing and striping S Church St from W Main St to W Pine St.
PI No: PI-0018988
Regional Project Id: HG-Abbevi-011
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $15,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing and striping E Monroe St from S Broad St to Reid St
PI No: PI-0018989
Regional Project Id: HG-Abbevi-012
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $15,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing and striping E Pine St from S Broad St to Reid St.
PI No: PI-0018990
Regional Project Id: HG-Abbevi-013
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $13,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing and striping E College St from S Broad St to Reid St.
PI No: PI-0018991
Regional Project Id: HG-Abbevi-014
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $10,000
Invoiced to Date: $0.00
Project Description: This project is to improve roadway safety by resurfacing and striping W Monroe St from S Broad St to S Depot St.
PI No: PI-0018992
Regional Project Id: HG-Pinevi-001
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $126,000
Invoiced to Date: $0.00
Project Description: This project will improve roadway capacity and safety by repairing and resurfacing the existing roadway. South Landline Road begins at SR 112 and ends at West Commerce Street in Pineview. This section of roadway is used by large agricultural equipment and tractor trailers as well as small vehicles as this road has many residents.
PI No: PI-0018993
Regional Project Id: HG-Pinevi-002
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $96,000
Invoiced to Date: $0.00
Project Description: This project will improve roadway capacity and safety by resurfacing the existing roadway on Mt. Pleasant Church Road from West Commerce Street to the Pineview City Limits/Wilcox County Line.
PI No: PI-0018994
Regional Project Id: HG-Pitts-001
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $60,000
Invoiced to Date: $0.00
Project Description: This project will improve roadway safety to the citizens of Pitts by patching, leveling, resurfacing, and restriping 7th Street from 6th Avenue to 9th Avenue. This street has many potholes and the resurfacing will also preserve and greatly increase the useful life of the deteriorating infrastructure.
PI No: PI-0018995
Regional Project Id: HG-Pitts-003
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $26,500
Invoiced to Date: $0.00
Project Description: This project will improve roadway safety to the citizens of Pitts by patching, leveling, resurfacing, and restriping 10th Street South from 6th Avenue to GA 30/US 280. This street is a major thoroughfare in Pitts with many agricultural products transported on it and the resurfacing will preserve and greatly increase the useful life of the deteriorating infrastructure.
PI No: PI-0018996
Regional Project Id: HG-Pitts-004
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $30,000
Invoiced to Date: $0.00
Project Description: This project will improve roadway safety to the citizens of Pitts by patching, leveling, resurfacing, and restriping Pine City Church Road from 6th Avenue to GA 30/US 280. This street has many agricultural products transported on it and the resurfacing will preserve and greatly increase the useful life of the deteriorating infrastructure.
PI No: PI-0018997
Regional Project Id: HG-Rochel-001
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $165,100
Invoiced to Date: $0.00
Project Description: Construct new sidewalk from corner of Lee Street and 7th Ave to Wilcox County K-12 School Building along right-of-way of 7th Avenue and soon to be built 7th Ave extension. This will connect K-12 school with the WCHS Softball field, baseball field, football stadium, practice gymnasium, residential areas and the Wilcox Christian Learning Center with a safe sidewalk for students and pedestrians.
PI No: PI-0018998
Regional Project Id: HG-Rochel-002
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Sidewalks
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $40,000
Invoiced to Date: $0.00
Project Description: Rehabilitate existing sidewalks where needed on Ashley St, Gordon St, First Ave and Fifth Ave to improve pedestrian safety .
PI No: PI-0018999
Regional Project Id: HG-Rochel-003
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $53,000
Invoiced to Date: $49,995.00
Project Description: This project will improve roadway safety to the citizens of Rochelle by patching, leveling, resurfacing, and restriping on Dykes Avenue from Ginhouse St to Mills St. This street serves a major residential area and provides access to a very active local church. The resurfacing will also preserve and greatly increase the useful life of the deteriorating infrastructure.
PI No: PI-0019000
Regional Project Id: HG-Rochel-004
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $26,500
Invoiced to Date: $22,431.66
Project Description: This project will improve roadway safety to the citizens of Rochelle by patching, leveling, resurfacing, and restriping Bessie Ave from Gordon St to Jackson St. This street has many potholes and the resurfacing will also preserve and greatly increase the useful life of the deteriorating infrastructure.
PI No: PI-0019004
Regional Project Id: HG-Rochel-005
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $26,000
Invoiced to Date: $0.00
Project Description: This project will improve roadway safety to the citizens of Rochelle by patching, leveling and resurfacing Grady Street NE. The resurfacing will also preserve and greatly increase the useful life of the deteriorating infrastructure.
PI No: PI-0019007
Regional Project Id: HG-Rochel-006
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $40,500
Invoiced to Date: $0.00
Project Description: This project will improve roadway safety to the citizens of Rochelle by patching, leveling, resurfacing, and restriping Lee Street from Railroad Avenue to Dykes Avenue (formerly 2nd Ave NE) and continuing on Dykes Ave to the intersection of Stephens Street. The resurfacing will also preserve and greatly increase the useful life of this rapidly deteriorating infrastructure.
PI No: PI-0019008
Regional Project Id: HG-Rochel-007
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $57,973
Invoiced to Date: $0.00
Project Description: This project will improve roadway safety to the citizens of Rochelle by patching, leveling, resurfacing, and restriping of 4th Avenue from Pine to Ginhouse Street and continuing on Ginhouse Street to the intersection with 5th Avenue. This roadway is heavily used to transport agricultural products. The resurfacing will also preserve and greatly increase the useful life of the deteriorating infrastructure.
PI No: PI-0019009
Regional Project Id: HG-Rochel-008
County: Wilcox
Congressional District: 8
Regional Commission: Heart of Georgia Altamaha
Project Type: Resurfacing and Maintenance
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $30,000
Invoiced to Date: $0.00
Project Description: This project will improve roadway safety to the citizens of Rochelle by patching, leveling, resurfacing, and restriping Herbert Street from 1st Avenue (US Hwy 280/ GA 30) to 2nd Avenue. The resurfacing will also preserve and greatly increase the useful life of the deteriorating infrastructure.
PI No: PI-262027-
Regional Project Id: HG-Lauren-012
County: Laurens
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $27,825,255
Invoiced to Date: $0.00
Project Description: SR 31 / US 441 Widening from south of SR 117 to I-16
PI No: PI-522200-
Regional Project Id: HG-Toombs-007
County: Toombs
Congressional District: 12
Regional Commission: Heart of Georgia Altamaha
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $61,092,128
Invoiced to Date: $300,010.70
Project Description: SR 4 / US1 from south of CR 386 / Green Oak Rd to CR 334 / Resmondo Rd
PI No: PI-0013530
Regional Project Id: RVRC2-41
County: Sumter
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $72,658,745
Invoiced to Date: $1,256,826.00
Project Description: Widening of US 280 from 2 to 4 lanes from Ferguson St to Lake Blackshear
PI No: PI-0013579
Regional Project Id: RVRC2-42
County: Sumter
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $20,146,000
Invoiced to Date: $14,325.37
Project Description: Widening of US 280 from 2 to 4 lanes from Felder St to District Line Rd\n\n
PI No: PI-0013580
Regional Project Id: RVRC2-40
County: Sumter
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $80,600,000
Invoiced to Date: $1,426,081.56
Project Description: Widening of US 280 from 2 to 4 lanes from Lamar Rd to Ferguson St
PI No: PI-0019502
Regional Project Id: RVRC2-01
County: Chattahoochee-Marion
Congressional District: 2
Regional Commission: River Valley
Project Type: Passing Lanes
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $14,310,000
Invoiced to Date: $170,532.02
Project Description: 2-3 Passing Lane segments on SR26 from SR520-US280 to Buena Vista. This project would include additional lanes, extensions of culverts, and bridge replacements.
PI No: PI-0019503
Regional Project Id: RVRC2-02
County: Clay-Randolph
Congressional District: 2
Regional Commission: River Valley
Project Type: Minor Widen and Resurfacing
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,430,944
Invoiced to Date: $0.00
Project Description: Resurface and shoulder widening on Cotton Hill Rd from SR 266 (in Clay County) to SR 266 (in Randolph County)
PI No: PI-0019504
Regional Project Id: RVRC2-03
County: Crisp
Congressional District: 8
Regional Commission: River Valley
Project Type: Minor Widen and Resurfacing
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $4,320,600
Invoiced to Date: $0.00
Project Description: Resurface and shoulder widening on North Coney Rd from US 280 to Fenn Rd-Gilbert Rd
PI No: PI-0019505
Regional Project Id: RVRC2-04
County: Crisp
Congressional District: 8
Regional Commission: River Valley
Project Type: Minor Widen and Resurfacing
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,800,000
Invoiced to Date: $0.00
Project Description: Resurface and shoulder widening on South Coney Rd from SR 300 to US 280
PI No: PI-0019506
Regional Project Id: RVRC2-05
County: Dooly
Congressional District: 2
Regional Commission: River Valley
Project Type: Minor Widen and Resurfacing
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $4,097,700
Invoiced to Date: $0.00
Project Description: Resurface and shoulder widening on Coney Rd from Fenn Rd-Gilbert Rd to Williams St
PI No: PI-0019507
Regional Project Id: RVRC2-06
County: Dooly
Congressional District: 2
Regional Commission: River Valley
Project Type: Minor Widen and Resurfacing
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $212,155
Invoiced to Date: $0.00
Project Description: Resurface and shoulder widening on Coney Rd from Williams St to Cotton St
PI No: PI-0019508
Regional Project Id: RVRC2-07
County: Harris
Congressional District: 3
Regional Commission: River Valley
Project Type: Multi-use Trail
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $5,000,000
Invoiced to Date: $0.00
Project Description: Extend Man O' War Trail for approx. 1.5 mi
PI No: PI-0019509
Regional Project Id: RVRC2-08
County: Harris
Congressional District: 3
Regional Commission: River Valley
Project Type: Intersection Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $7,000,000
Invoiced to Date: $26,580.34
Project Description: Intersection Improvements on SR 315 from Hart Dr to Hamilton Mulberry Grove Rd
PI No: PI-0019510
Regional Project Id: RVRC2-09
County: Harris
Congressional District: 3
Regional Commission: River Valley
Project Type: Intersection Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $4,000,000
Invoiced to Date: $27,627.67
Project Description: New Roundabout at the intersection of SR 315, SR 219, and Goat Rock Rd
PI No: PI-0019511
Regional Project Id: RVRC2-10
County: Macon
Congressional District: 2
Regional Commission: River Valley
Project Type: Minor Widen and Resurfacing
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,848,700
Invoiced to Date: $2,571,051.22
Project Description: Resurface and shoulder widening on Buck Creek Bypass from SR 128 to SR 49
PI No: PI-0019512
Regional Project Id: RVRC2-11
County: Macon
Congressional District: 2
Regional Commission: River Valley
Project Type: Airport
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,252,800
Invoiced to Date: $0.00
Project Description: Hangar Improvements at Dr. CP Savage Airport
PI No: PI-0019513
Regional Project Id: RVRC2-12
County: Marion
Congressional District: 2
Regional Commission: River Valley
Project Type: Streetscapes
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,000,000
Invoiced to Date: $208,045.51
Project Description: Resurfacing and Operating in downtown Buena Vista
PI No: PI-0019514
Regional Project Id: RVRC2-13
County: Quitman
Congressional District: 2
Regional Commission: River Valley
Project Type: Minor Widen and Resurfacing
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $2,271,640
Invoiced to Date: $0.00
Project Description: Resurface and shoulder widening on Lower Lumpkin Rd from 2700' W of Cannington Rd
PI No: PI-0019515
Regional Project Id: RVRC2-14
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Transit
Band: Multiple (TIA 2)
Original Project Budgeted: $25,000,000
Invoiced to Date: $149,700.00
Project Description: METRA Capital and Operations
PI No: PI-0019516
Regional Project Id: RVRC2-15
County: Muscogee
Congressional District: 3
Regional Commission: River Valley
Project Type: Airport
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $25,000,000
Invoiced to Date: $0.00
Project Description: Columbus Airport Passenger Terminal Expansion
PI No: PI-0019517
Regional Project Id: RVRC2-16
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Interchange Reconstruction
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $36,650,000
Invoiced to Date: $266,933.95
Project Description: Interchange Reconstruction on Manchester Expy at County Line and Mahaffey Rd
PI No: PI-0019518
Regional Project Id: RVRC2-17
County: Harris
Congressional District: 3
Regional Commission: River Valley
Project Type: Intersection Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $800,000
Invoiced to Date: $0.00
Project Description: Intersection Improvements on Manchester Expy at Central Church Rd
PI No: PI-0019519
Regional Project Id: RVRC2-18
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $22,500,000
Invoiced to Date: $1,091,773.82
Project Description: Operating on Steam Mill Rd from Fair Oaks Dr to McCartha Dr-Dogwood Dr. Ped Bridge
PI No: PI-0019520
Regional Project Id: RVRC2-19
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $18,700,000
Invoiced to Date: $0.00
Project Description: Williams Road Widening - SR1-US 27 (Veteran's Parkway) to I-185. Widen from 2 to 3 lanes with pedestrian-bicycle amenities. Install roundabout at Williams and I-185 and Fortson Road with pedestrian-bicycle amenities.
PI No: PI-0019521
Regional Project Id: RVRC2-20
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Streetscapes
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $18,200,000
Invoiced to Date: $200,462.12
Project Description: Second Avenue Streetscape - Manchester Expressway to Talbotton Road-19th Street. Project to include multiuse trails, sidewalks, and landscaping.
PI No: PI-0019522
Regional Project Id: RVRC2-21
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $17,600,000
Invoiced to Date: $0.00
Project Description: Cusseta Road Widening - (from 2 lanes to 3 lanes) and reducing the 4 lane segment to 3 lanes with Roundabouts - from 10th Avenue to Fort Benning Road with roundabouts at North Lumpkin @ 23rd and Brown @ Andrews Road. Project to include sidewalks and a multiuse trail.
PI No: PI-0019523
Regional Project Id: RVRC2-22
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $15,400,000
Invoiced to Date: $0.00
Project Description: Widen Forrest Road from Macon Road to Woodruff Farm Road from 2 lanes to 3 lanes with a roundabout at Trinity and Forrest. This project will include sidewalks and multi-use trail.
PI No: PI-0019524
Regional Project Id: RVRC2-23
County: Muscogee
Congressional District: 3
Regional Commission: River Valley
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $12,800,000
Invoiced to Date: $496,250.00
Project Description: Whitesville Road Widening - (from 2 lanes to 3 lanes) from Whittlesey Road to Williams Road with intersection improvements or roundabouts with sidewalks and multiuse trail.
PI No: PI-0019525
Regional Project Id: RVRC2-24
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Multi-use Trail
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $12,500,000
Invoiced to Date: $0.00
Project Description: Resurface 2.5 miles of the Columbus River Walk (from the Trade Center to Oxbow and from City Mills to North Highland Dam)
PI No: PI-0019526
Regional Project Id: RVRC2-25
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $12,000,000
Invoiced to Date: $0.00
Project Description: Morris Road from Buena Vista Road to Forrest Road. Widen from 2 to 3 lanes with sidewalks, multiuse trail and landscaping
PI No: PI-0019527
Regional Project Id: RVRC2-26
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $10,700,000
Invoiced to Date: $0.00
Project Description: Buena Vista Road Corridor Improvements (Widening from two and four lanes to three lanes) - from Wynnton Road to Illges Road with sidewalks and multiuse trail.
PI No: PI-0019528
Regional Project Id: RVRC2-27
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Streetscapes
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $10,100,000
Invoiced to Date: $0.00
Project Description: South Lumpkin Road Streetscape - from Victory Drive to Roundabout. Project to include sidewalks and multiuse trail.
PI No: PI-0019529
Regional Project Id: RVRC2-28
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $6,800,000
Invoiced to Date: $499,668.05
Project Description: Andrews Road from Buena Vista Road to Cusseta Road. Widen from 2 to 3 lanes with sidewalks, multiuse trail and landscaping.
PI No: PI-0019530
Regional Project Id: RVRC2-29
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Intersection Improvements
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $6,650,000
Invoiced to Date: $136,124.76
Project Description: 13th Avenue, 17th Street, Linwood Boulevard - Roundabout
PI No: PI-0019531
Regional Project Id: RVRC2-30
County: Muscogee
Congressional District: 3
Regional Commission: River Valley
Project Type: Intersection Improvements
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $12,200,000
Invoiced to Date: $0.00
Project Description: Double Churches Road Improvements from Veteran's Parkway to River Road. Project to include Multi-use trail and sidewalks with intersection improvements or roundabout at Double Churches & Whitesville Road.
PI No: PI-0019532
Regional Project Id: RVRC2-31
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Widening
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $9,200,000
Invoiced to Date: $473,953.13
Project Description: Brennan Road Improvements - Buena Vista Road to Cusseta Road. Widening from 2 to 3 lanes with sidewalks, multiuse trail, streetscapes.
PI No: PI-0019533
Regional Project Id: RVRC2-32
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Multi-use Trail
Band: 3:2030 to 2032 (TIA 2)
Original Project Budgeted: $8,400,000
Invoiced to Date: $0.00
Project Description: DF Bull Creek Connector - Rigdon Park-Woodruff Farm Road Soccer Complex - 7.6 miles of multi-use paths along Bull Creek from Woodruff Farm Road Soccer Complex. This project would act as a connector to the Riverwalk and MLK Connector for the eastside of Columbus, GA.
PI No: PI-0019534
Regional Project Id: RVRC2-33
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Streetscapes
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $6,000,000
Invoiced to Date: $54,741.39
Project Description: University Avenue -from Manchester Expressway to Macon Road (Road Diet) - Reduce roadway from four (4 ) lanes to two (2) lanes with Pedestrian-Bicycle Facilities.
PI No: PI-0019535
Regional Project Id: RVRC2-34
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Intersection Improvements
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $11,300,000
Invoiced to Date: $80,145.94
Project Description: Intersection Improvements at ramp termini on US 80 at Schomburg Rd and Blackmon Rd
PI No: PI-0019536
Regional Project Id: RVRC2-35
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Streetscapes
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $4,000,000
Invoiced to Date: $0.00
Project Description: Enhancements along 8th Ave near the Liberty Theater
PI No: PI-0019537
Regional Project Id: RVRC2-36
County: Muscogee
Congressional District: 2
Regional Commission: River Valley
Project Type: Multi-use Trail
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $690,000
Invoiced to Date: $127,385.01
Project Description: DF 5th Avenue - 14th Street- 10th Street - This project will construct 0.5 miles of multi-use paths to connect the 14th Street Connector to the Linwood Connector.
PI No: PI-0019538
Regional Project Id: RVRC2-37
County: Randolph-Quitman
Congressional District: 2
Regional Commission: River Valley
Project Type: Passing Lanes
Band: 2:2027 to 2029 (TIA 2)
Original Project Budgeted: $12,000,000
Invoiced to Date: $133,200.00
Project Description: Passing lanes along US 82 between SR 39 in Quitman Co and City of Cuthbert
PI No: PI-0019539
Regional Project Id: RVRC2-38
County: Schley
Congressional District: 2
Regional Commission: River Valley
Project Type: Bridge
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,500,000
Invoiced to Date: $251,579.67
Project Description: Replace SR 135 bridge over Muckalee Creek
PI No: PI-0019540
Regional Project Id: RVRC2-39
County: Stewart
Congressional District: 2
Regional Commission: River Valley
Project Type: Resurfacing and Maintenance
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $1,965,000
Invoiced to Date: $1,383,441.80
Project Description: Resurfacing of Hospital Road from US 280 to Sundown Road
PI No: PI-0019541
Regional Project Id: RVRC2-43
County: Talbot
Congressional District: 2
Regional Commission: River Valley
Project Type: Minor Widen and Resurfacing
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $3,000,000
Invoiced to Date: $2,691,002.44
Project Description: Minor widening and resurfacing of Chalybeate Springs Rd from SR 36 to Talbot County Line
PI No: PI-0019542
Regional Project Id: RVRC2-44
County: Taylor
Congressional District: 2
Regional Commission: River Valley
Project Type: Grade Drain Base and Pave
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $4,000,000
Invoiced to Date: $622,422.27
Project Description: Pave Rustin Lake Rd from SR137 to MD Kirksey Rd and Resurface North Ed Davis Rd from MD Kirksey Rd to US 19
PI No: PI-0019543
Regional Project Id: RVRC2-45
County: Webster
Congressional District: 2
Regional Commission: River Valley
Project Type: Bridge
Band: 1:2023 to 2026 (TIA 2)
Original Project Budgeted: $4,000,000
Invoiced to Date: $404,075.03
Project Description: Replace two (2) bridges on Churchill Rd over Kinchfoonee Creek